Loading...
21-105296-Site Plan-10-08-2021-V1I ST NOT TO SCALE SW 341ST PL a SW 353RD ST rn SITE V) w Q N SW 1345TH N SW 344TH ST Q_ �R�y Q S� LO SW 346TH PL can J SW 347TH PL d' 1'74NI'LlIIMM,F1� NLETL Mfg THESE DRAWINGS HAVE BEEN PREPARED BASED SHORT PLAT CIVIL ENGINEERING DESIGN PLANS PREPARED BY ESM CONSULTING ENGINEERS LLC. TEBALDI ENGINEERING, LLC DOES NOT WARRANT THAT THE TOPOGRAPHY SHOWN ON THESE DRAWINGS IS REPRESENTATIVE OF WHAT IS CONSTRUCTED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE OWNER TO HAVE ALL IMPROVEMENTS FIELD VERIFIED PRIOR TO CONSTRUCTION. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO WORK. T/��[��:� LAKEHAVEN WATER AND SEWER DISTRICT SEWER PURVEYOR: LAKEHAVEN WATER AND SEWER DISTRICT EXISTING ASPHALT SURFACE BUILDING fl CENTERLINE ROW coo CLEANOUT Q CONCRETE SURFACE ' RETAINING WALL XX— FENCE LINE (CHAIN LINK) FENCE LINE (WOOD) FIRE HYDRANT G ❑ GAS METER �Q GAS VALVE r_ - J GRAVEL SURFACE FE-11 INLET (TYPE 1) LP 0_ LIGHT POLE ►�4 MONUMENT IN CASE (FOUND) POWER (OVERHEAD) UP POWER (UNDERGROUND) G GAS LINE TMH O TEL MANHOLE POWER POLE POWER VAULT O REBAR AS NOTED (FOUND) • REBAR & CAP (SET) �T ROCKERY SS SEWER LINE SEWER MANHOLE I-D SIGN (AS NOTED) SD STORM DRAIN LINE TEL HH ❑ TELEPHONE HAND HOLE TEL SENTRY ❑ TELEPHONE SENTRY TEL VAT TELEPHONE VAULT TS HH O TRAFFIC SIGNAL HAND HOLE SIZE TYPE O TREE (AS NOTED) WM 2 WATER METER WV m WATER VALVE W WATER LINE POWER HAND HOLE �7, TYPE 1 150.08 1130.94 3+85.67, 0.00 T 362.50 59.50, 6"0 59.50, 6"0 7 __ j CIVIL SITE AND TESC PLAN ................ 150 LF, 6" 0 .. SD Q S=2.68% �5' HEAR BSBL /—VINE MAPLE (2" CAL.) INCENSE CEDAR (6" MIN. OREGON ASH (2-1/2" 0 PROPOSED w \ U) PROPOSED CONCRETE D PROPOSED HOUSE FF=368.2 PROPOSED ROOF DRAIN TIGHTLINE 6.57' j OPROPOSED STORM DRAIN SILT FENCE. SEE DETAIL ON SHEET C2. 366.7f 11.93' • PROPOSED CLEANOUT PROPOSED WATER SERVICE 366.7t �- FLOW PATH 20' FRONT YARD BSBL 366.5t �315 PROPOSED SPOT GRADE a 8' 0�54% \ PROPOSED SEWER SERVICE ° PROPOSED GRADING SLOPE ° W , a CATCH BASIN PROTECTION a pO Q °'. PERIMETER PROTECTION 8 EX. ROW LINE a CLEARING LIMITS EX. SIDE''ALK_SERVICE _ _ __.__e__ _ ..._,__ .y0, 366.5f p Know what's below. p Call before you dig. ® Dial 811 Or Call 1-800-424-5555 LML.ITY CONFLICT NOTE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTIILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE 1-800-424-5555 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT THE ENGINEER TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. EX. CURB EX. W INSTALL CATCH BASIN INS NITA EWE U AT NEAREST DOWNSTREAM X',� �, CATCH BASIN EX. SS M IN \\ SW 344TH PLA N, CB 8, TYPE 1 N=6152.04 E=1 1280.92, STA 5+35.67, 0.00 T -- TG=365.54 IE=363.52, 6 0 f t EX. CATCH BASIN EX. ROW LINE (` s ; r CONNECT , EXISTING STORM STUB° w 6" SOLID PVC ROOF DRAIN tt °o TIGHTLINE @ 2.00% MIN., PERFORATED STUBOUT CONNECTION SEE DETAIL ON SHEET C2 € 6" CLEANOUT ROOF EAVE E € t EDGE OF FOUNDATION t F t ( t t E 1 t € t F t € i € 6 E t EX. LOT LINE N EI 5' SIDE BSBL I LIMITS OF,,CLEARING (TYP.) t E PROPOSED °`L8' WIDE CEMENT CONCRETE DRIVEWAY TEMPORARY STOCKPILE TEMPORARY CONSTRUCTION ENTRANCE. S ON SHEET C2. \DETAIL 65' DRIVEWA TCH VBASIN AND 4" MIN. TIGHTLINE. G DRIVEWAY TO DRAIN TO CATCH BASIN EWAY DRAINAGE TO ROOF DOWNSPOUT TIGHTLINE i ' I r� TREE REPLACEMENT INFORMATION: REPLACEMENT TREES AS SHOWN ARE THE SAME SPECIES AND SIZE AS SHOWN ON THE APPROVED FINAL LANDSCAPE AND TREE REPLACEMENT PLAN DATED MARCH 23, 2021. APPROVED REPLACEMENT TREE PLAN MEETS THE REQUIREMENTS OF FWRC 19.120.130. SEE APPROVED FINAL LANDSCAPE AND TREE REPLACEMENT PLAN ON FILE WITH THE CITY OF FEDERAL WAY AND INCLUDED WITH THIS BUILDING PERMIT PACKAGE. TREE INSTALLATION DETAILS INCLUDED WITH THE APPROVED FINAL LANDSCAPE AND TREE REPLACEMENT PLAN. SOIL AMEDMENT NOTE ALL DISTURBED SOILS TO BE AMENDED PER CITY OF FEDERAL WAY REQUIREMENTS. SEE AMENDMENT NOTES ON SHEET C2. PROJECT DATA: PROJECT ADDRESS: 17XX SW 344TH PLACE FEDERAL WAY, WA JURISDICTION: CITY OF FEDERAL WAY PROJECT AREA SUMMARY: TOTAL LOT AREA = 8,613 SF PROPOSED ROOF AREA=3,151 SF PROPOSED DRIVEWAY/WALK AREA=839 SF TOTAL IMPERVIOUS AREA=3,990 SF APPROX. 50 CY CUT/FILL 1ff=20' 0 10 20 40 GENERAL SITE DEVELOPMENT NOTES! 1. THE CONTRACTOR SHALL OBTAIN AND HAVE AVAILABLE COPIES OF THE APPLICABLE GOVERNING AGENCY STANDARDS AT THE JOB SITE DURING THE RELATED CONSTRUCTION OPERATIONS. 2. CONTRACTOR SHALL ASSURE THAT ALL NECESSARY PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCING WORK. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION WHETHER SHOWN ON THESE PLANS OR NOT. UTILITIES OTHER THAN THOSE SHOWN MAY EXIST ON THIS SITE. ONLY THOSE UTILITIES WITH EVIDENCE OF THEIR INSTALLATION VISIBLE AT GROUND SURFACE OR SHOWN ON RECORD DRAWING PROVIDED BY OTHERS ARE SHOWN HEREON. EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY AND ARE SUBJECT TO A DEGREE OF UNKNOWN VARIATION. SOME UNDERGROUND LOCATIONS SHOWN HEREON MAY HAVE BEEN TAKEN FROM PUBLIC RECORDS. TEBALDI ENGINEERING, LLC ASSUMES NO LIABILITY FOR THE ACCURACY OF PUBLIC RECORDS OR RECORDS OF OTHERS. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT TEBALDI ENGINEERING, LLC, TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES. 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE APPROPRIATE UTILITIES INVOLVED PRIOR TO CONSTRUCTION. 6. INSPECTION OF SITE WORK WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE AUTHORITY HAVING JURISDICTION. INSPECTION OF PRIVATE FACILITIES WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE INSPECTOR OF THE AUTHORITY HAVING JURISDICTION 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION OR AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION. 7. PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY THE CONTRACTOR SHALL CONTACT THE AGENCY AND/OR UTILITY INSPECTION PERSONNEL AND ARRANGE ANY REQUIRED PRE —CONSTRUCTION MEETING(S). CONTRACTOR SHALL PROVIDE 72 HRS MIN. ADVANCE NOTIFICATION TO OWNER, FIELD ENGINEER AND ENGINEER OF PRE —CONSTRUCTION MEETINGS. 8. THE CONTRACTOR IS RESPONSIBLE FOR WORKER AND SITE SAFETY AND SHALL COMPLY WITH THE LATEST OSHA STANDARDS AND REGULATIONS, OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING PROCEDURES. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. ANY WORK WITHIN THE TRAVELED RIGHT—OF—WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE AT LEAST ONE FLAGGER FOR EACH LANE OF TRAFFIC AFFECTED. 10. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ALL ADJACENT PUBLIC AND PRIVATE PROPERTIES AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING UTILITY SERVICES THAT ARE TO REMAIN OPERATIONAL WITHIN THE CONSTRUCTION AREA WHETHER SHOWN OR NOT SHOWN ON THE PLANS. 11. STRUCTURAL BMPs MUST BE ACCESSIBLE FOR INSPECTION BY THE AUTHORITY HAVING JURISDICTION DURING REGULAR BUSINESS HOURS. 12. TWO (2) COPIES OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. ONE (1) SET WITH RECORDS OF AS —BUILT INFORMATION SHALL BE SUBMITTED TO TEBALDI ENGINEERING, LLC AT COMPLETION OF PROJECT. MIMUO ■ ■ ■ ALL PROJECTS THAT WILL CLEAR, GRADE, OR OTHERWISE DISTURB THE SITE MUST PROVIDE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES TO PREVENT THE TRANSPORT OF SEDIMENT FROM THE SITE TO DRAINAGE FACILITIES, STREAMS, LAKES, WETLANDS, ADJACENT PROPERTIES, AND CITY STREETS. AT A MINIMUM, THE FOLLOWING TESC MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE KING COUNTY SURFACE WATER DESIGN MANUAL (KCSWDM) AND FEDERAL WAY REVISED CODE. • PRIOR TO ANY CLEARING OR GRADING, SILT FENCING SHALL BE INSTALLED DOWN SLOPE OF ALL AREAS TO BE DISTURBED. • PRIOR TO ANY CLEARING OR GRADING, DOWNSTREAM STORM DRAIN INLET PROTECTION SHAL BE INSTALLED PER THE KCSWDM. • PRIOR TO ANY DELIVERY OF MATERIALS OR CONSTRUCTION OF ANY KIND, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED. THE ENTRANCE SHALL BE A MINIMUM TEN BY TEN FEED, WITH TWO TO FOUR INCH QUARRY SPALLS ONE FOOT DEEP. • TEMPORARY AND PERMANENT COVER MEASURES SHALL BE PROVIDED TO PROTECT DISTURBED AREAS. TEMPORARY COVER SHALL BE INSTALLED IF A DISTURBED AREA IS TO REMAIN UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON (MAY 1 TO SEPTEMBER 30) OR FOR MORE THAN TWO DAYS DURING THE WET SEASON (OCTOBER 1 TO APRIL 30). DURING THE WET SEASON, SLOPES AND STOCKPILES 3H:1V OR STEEPER, AND WITH MORE THAN TEN FEET OF VERTICAL RELIEF SHALL BE COVERED IF T HEY ARE TO REMAIN UNWORKED FOR MORE THAN 12 HOURS. • COVER METHODS INCLUDE MULCH, EROSION CONTROL NETS AND BLANKETS, PLASTIC COVERING, SEEDING, OR SODDING. • TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSPECTED PRIOR TO ANY CLEARING OR GRADING DURING AND AT THE COMPLETION OF THE PROJECT. IT IS THE RESPONSIBILITY OF THE APPLICANT TO MAINTAIN EROSION CONTROL MEASURES IN PROPER WORKING CONDITIONS TO ENSURE THAT NO SEDIMENT IS LEAVING THE SITE. • IF, IN THE OPINION OF THE EROSION CONTROL INSPECTOR, THE TEMPORARY EROSION CONTROL MEASURES ARE NOT INSTALLED, ARE INSTALLED INCORRECTLY, OR ARE IN NEED OF REPAIR, A STOP WORK ORDER MAY BE ISSUED UNTIL CORRECTIVE ACTION IS TAKEN. IF A REINSPECTION IS NECESSARY, A REINSPECTION FEE WILL BE CHARGED. RECEIVED 12/23/21 APPLICANT 0 J b W 0— J Q Q U 1 _j J Q C, 0— m m v> Z Q V M Q L a W � W ''^^ X W''^^ W U CL Q _j Q A_ U_ U U > U W 0— r F_ v m N 0 0 00 o z GARRETTE CUSTOM HOMES 402 EAST 26TH STREET, SUITE 200 TACOMA, WA 98421 PHONE (253) 844-4504 CONTACT: KATIE BALL ENGINEER: TEBALDI ENGINEERING, LLC 4625 — 126TH AVENUE EAST EDGEWOOD, WA 98372 TEL: (206) 450-5096 CONTACT: CHRIS TEBALDI, P.E. • • cq 04 • qqT 43m F� l S�NA 8/30/21 0 0 N U � II N C Z N = > � � N :CIE) U U U O 00 00 o, c -Y o 3 Q 2 4) V) 0 o v a o U V Z W W W w ZW� � WZ �a N 00 m W��N �W� I— d' W .. �j N Q z L O c -0 W N U