Loading...
22-100391-Planset-1-30-2022-V1ABBREVIATIONS VICINITY MAP PROJECT DATA SHEET INDEX oW Z�- & AND GA. GAUGE S. GAUGE a Z_ ANGLE GALV. GALVANIZED S.A.D. GALVANIZED BUILDING DEPARTMENT: CITY OF FEDERAL WAY ARCHITECTURAL � _ @ AT G.B. GRAB BAR S.C. GRAB BAR to z 0 DIAMETER OR ROUND GL. GLASS S.C.D. GLASS BUILDING CODES: 2018 INTERNATIONAL BUILDING CODE (IBC) W/ WAC 51-50 A0.0 COVER SHEETco # POUND OR NUMBER GND. GROUND SCHED. GROUND 2018 INTERNATIONAL EXISTING BUILDING CODE W/ WAC A0.1 SHEET INDEX & SYMBOLS w o uj (E) EXISTING GR. GRADE S.D. GRADE 51-50-480000 A0.4a ACCESSIBILITY DETAILS F ui (R) RELOCATED GYP. GYPSUM SECT. GYPSUM 2018 INTERNATIONAL MECHANICAL CODE W/ WAC 51-52 A0.4b ACCESSIBILITY DETAILS N o Q (N) NEW S.E.D. SEE ELECTRICAL DRAWING 2018 UNIFORM PLUMBING CODE W/ WAC 51-56 A1.0 SITE PLAN -OVERALL o a m H.B. HOSE BIBB SH. SHELF 2018 WASHINGTON STATE ENERGY CODES WAC 51-11 W N W d A.B. ANCHOR BOLT H.C. HOLLOW CORE SHR. SHOWER 2018 INTERNATIONAL FIRE CODE W/ WAC 51 54A A2.0 EXITING AND OCCUPANCY ANALYSIS PLAN �- _ = o 0 � uj W ACOUS. ACOUSTICAL HDWD. HARDWOOD SHT. SHEET 2018 INTERNATIONAL FUEL GAS CODE W/ WAC 51-52-21000 A2.1 FLOOR PLAN < o a Y A.D. AREA DRAIN HDWE. HARDWARE SIM. SIMILAR 2020 NATIONAL ELECTRICAL CODE (NEC) All POWER AND DATA PLAN � W W z o ADJ. ADJUSTABLE H.M. HOLLOW METAL S.M.D. SEE MECHANICAL DRAWING ICC/ANSI Al17.1-2009 ACCESSIBILITY W/ WAC 51-50-1101.2 A4.1 FINISH PLAN W cn z g AGGR. AGGREGATE HORIZ. HORIZONTAL S.M.S. SHEET METAL SCREW VANCOUVER MUNICIPAL CODE TITLE 17 A5.1 CEILING PLAN U) z 3 z N 0 W AL. ALUMINUM HR. HOUR S.N.D. SANITARY NAPKIN DISPENSER WASHINGTON STATE WATER CONSERVATION CODE � W o A8.2 ENLARGED PLANS AND INTERIOR ELEVATIONS ALT. ALTERNATE HGT. HEIGHT S.N.R. SANITARY NAPKIN RECEPTACLE U) z A.P. ACCESS PANEL SPEC. SPECIFICATION OCCUPANCY CLASSIFICATION: A8.3 INTERIOR ELEVATIONS co ¢ o APPROX. APPROXIMATE I.D. INSIDE DIAMETER (DIM.) S.P.D. SEE PLUMBING DRAWING A9.1 DOOR SCHED., TYPES, HARDWARE, NOTES & DETAILS U- ARCH. ARCHITECTURAL INC. INCANDESCENT SQ. SQUARE OCCUPANCY SEPARATION: NONE A10.2 WALL & CEILING DETAILS z o ASB. ASBESTOS INFO. INFORMATION S.S.D. SEE STRUCTURAL DRAWING A10.5 MILLWORK DETAILS > a W ASPH. ASPHALT INSUL. INSULATION S.ST. STAINLESS STEEL TYPE OF CONSTRUCTION: °C W A.F.F. ABOVE FINISH FLOOR INT. INTERIOR S.SK. SERVICE SINK W INTER. INTERMEDIATE STA. STATION SPRINKLERS: YES a B.B. BULLETIN BOARD STD. STANDARD BD. BOARD JAN. JANITOR STL. STEEL Northwest NUMBER OF STORIES: X BITUM BITUMINOUS JT. JOINT STOR. STORAGE 9 Kidney CemteL BKG. BACKING STRL. STRUCTURAL PROJECT AREA: +/ X,XXX SF BLDG. BUILDING KIT. KITCHEN SUSP. SUSPENDED BLK. BLOCK SYM. SYMMETRICAL TOTAL FIRST FLOOR AREA: +/ X,XXX SF BLKG. BLOCKING LAB. LABORATORY BM. BEAM LAM. LAMINATE TRD. TREAD APN: XXXX-XXX-XXX BOT. BOTTOM LAV. LAVATORY T.B. TOWEL BAR LKR. LOCKER T.C. TOP OF CURB CAB. CABINET LT. LIGHT TEL. TELEPHONE' . C.B. CATCH BASIN TER. TERRAZZO CEM. CEMENT MAS. MASONRY T.&G. TONGUE AND GROOVE CER. CERAMIC MAT. MATERIAL THK. THICK C.I. CAST IRON MAX. MAXIMUM THRES. THRESHOLD C.G. CORNER GUARD M.B. MACHINE BOLT T.O.PV. TOP OF PAVEMENT C.J. CONSTRUCTION JOINT M.C. MEDICINE CABINET T.O.P. TOP OF PARAPET CLG. CEILING MECH. MECHANICAL T.O.SH. TOP OF SHEATING A CLKG. CALKING MEMB. MEMBRANE T.P.B. TELEPHONE PANELBOARD er( ek Ev CLO. CLOSET MET. METAL T.P.D. TOILET PAPER DISPENSER CLR. CLEAR MFR. MANUFACTURER T.V. TELEVISION STRUCTURAL C.O. CASED OPENING MH. MANHOLE T.O.W. TOP OF WALL`° COL. COLUMN MIN. MINIMUM TYP. TYPICAL " S Unnamed CONC. CONCRETE MIR. MIRROR SK1 SKETCH1 CONN. CONNECTION MISC. MISCELLANEOUS UNF. UNFINISHED` CONSTR. CONSTRUCTION M.O. MASONRY OPENING U.O.N. UNLESS OTHERWISE NOTED CONT. CONTINUOUS MTD. MOUNTED UR. URINAL CORR. CORRIDOR MUL. MULLION r CPT. CARPET V.C.T. VINYL COMPOSITION TILE CTSK COUNTERSUNK N. NORTH VERT. VERTICAL SITE CNTR. COUNTER N.I.C. NOT IN CONTRACT VEST VESTIBULE CTR. CENTER NO. OR # NUMBER V.I.F. VERIFY IN FIELD ;; NOM. NOMINAL DET. DETAIL N.T.S. NOT TO SCALE W. WEST DIA. DIAMETER W/ WITH DIM. DIMENSION O.A. OVERALL WC. WAL COVERING" DISP. DISPENSER OBS. OBSCURE W.C. WATER CLOSET DN. DOWN O.C. ON CENTER WD WOOD D.O. DOOR OPENING O.D. OUTSIDE DIAMETER (DIM.) W.F. WIDE FLANGE GENERAL NOTES PROJECT DESCRIPTION DR. DOOR OFF. OFFICE W.O. WHERE OCCURS DWR. DRAWER O.H. OPPOSITE HAND W/0 WITHOUT DS. D.S.P. DOWNSPOUT DRY STANDPIPE OPNG. OPP. OPENING OPPOSITE WP. WSCT. WATERPROOF WAINSCOT 13HIS PROJECT AND ALL WORK ASSOCIATED WITH THE PROJECT SHALL CONFORM TO STATE AND LOCAL CODE 35. ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN RATING. TENANT IMPROVMENT FOR ---. AREA TO BE REMODELED, +/- X,XXX SQ.FT. OF X,XXX SQ.FT. DWG. DRAWING WT. WEIGHT JURISDICTIONS. P. PAINT W.R. WATER RESISTANT 36. INTERIOR WALLS & CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE & LOCAL CODES, TENANT IMPROVEMENT TO EXISTING OFFICE SPACE FOR OFFICE USE E. EAST P.A.D. POWDER ACTUATED DEVICE 2. THE TERM ARCHITECT OR DESIGNER AS USED IN THESE DOCUMENTS SHALL REFER TO TWINSTEPS. INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOKE DENSITY RATINGS FOR FINISH MATERIALS. EA. E.B. EACH EXPANSION BOLT PRCST. PRL. PRE -CAST PLATE 3. THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR MEANS, 37. ALL NEW CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS FREE. ELECTRICAL T Z i� r E.J. EXPANSION JOINT P.LAM. PLASTIC LAMINATE38. METHODS, TECHNIQUES, SEQUENCE ON PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN E-1.0 ELECTRICAL SYMBOLS DETAILS AND NOTES T W M co EL. ELEVATION PLAS. PLASTER CONNECTION WITH THE WORK, ALL WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL INSPECTIONS SHALL BE CALLED FOR AND PASSED BEFORE ANY WORK CONTINUES TO THE NEXT E-2.0 ENLARGED ELECTRICAL LIGHTING PLAN T T o PHASE. ELEC. ELEV. ELECTRICAL ELEVATOR PLYWD. PR. PLYWOOD PAIR 4. SHORING, TEMPORARY SUPPORTS, AND SAFETY OF ERECTION BRACING DURING DEMOLITION AND / OR W L Qi EMER. EMERGENCY PT. POINT CONSTRUCTION IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND HAS NOT BEEN CONSIDERED BY THE 39. MANDATORY SPECIAL INSPECTIONS PER THE REQUIREMENTS OF THE ENGINEERING SUBMITTED AND T ENCL. ENCLOSURE P.T.D. PAPER TOWEL DISPENSER STRUCTURAL ENGINEER OR THE ARCHITECT. I.C.C. PORTIONS OF THIS PROJECT REQUIRE SPECIAL INSPECTION. O T ENGR. ENGINEER P.T.D/R COMBINATION PAPER TOWEL "N.I.C." "NOT �n V) Qi E.P. ELECTRICAL PANELBOARD DISPENSER & RECEPTACLE PARTITION 5. ALL WORK NOTED OR IN CONTRACT" IS TO BE ACCOMPLISHED BY A CONTRACTOR OTHER THAN 40. NO ROOFTOP EQUIPMENT SHALL BE VISIBLE FROM THE GROUND. W m iQ > EQ. EQUAL PTN. PARTITION THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE CONSTRUCTION AGREEMENT. THE GENERAL "OTHER"CONTRACTORS a T � E.W.0 EQUIPMENT P.T.R. PAPER TOWEL RECEPTACLE CONTRACTOR SHALL COORDINATE WITH PER REQUIREMENTS ESTABLISHED BY THE 41. A 4'-0" WALKWAY WILL BE MAINTAINED ALONG THE SIDE WALK IN FRONT OF THE BUILDING SITE DURING \ / T E.W.C. ELECTRICAL WATER COOLER OWNER AND TENANT. CONSTRUCTION. E 0 Q� EXST. EXPO. EXISTING EXPOSED Q.T. QTY. QUARRY TILE QUANTITY 6. THE GENERAL CONTRACTOR AND ALL SUB CONTRACTORS ARE RESPONSIBLE FOR EXAMINING CONTRACT 42. PEDESTRIAN PROTECTION, FENCES, RAILING OR CANOPIES, SHALL BE ALONG THE PUBLIC RIGHT OF ♦ ♦ Z EXP. EXPANSION DOCUMENTS, FIELD CONDITIONS, AND CONFIRMING THAT WORK IS BUILDABLE AS SHOWN BEFORE WAY IN ACCORDANCE WITH C.B.C. O V T Q � � 4)R. EXP. EXTERIOR R. RISER PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY QUESTIONS REGARDING THESE OR OTHER RADIUS COORDINATION ITEMS, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE 43. A CONSTRUCTION FENCE SHALL BE MAINTAINED ALONG THE SIDE WALK IN FRONT OF THE BUILDING Q T O F.A. FIRE ALARM R.D. ROOF DRAIN ARCHITECT BEFORE PROCEEDING WITH WORK IN QUESTIONS OR RELATED WORK. SITE DURING CONSTRUCTION. THIS FENCE SHALL BE INSTALLED PRIOR TO EXCAVATION AND/OR W r FOUNDATION TRENCHING. 0o UL F.B. FLAT BAR REF. REFERENCE 7. CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES (AS -BUILT DRAWINGS) F.D. FLOOR DRAIN REFR. REFRIGERATOR AND SHALL PROVIDE SAID DOCUMENTATION TO THE ARCHITECT UPON COMPLETION OF CONSTRUCTION. 44. TEMPORARY TOILET FACILITIES SHALL BE ON SITE DURING THE CONSTRUCTION AND WILL BE M FDN. FOUNDATION RGTR. REGISTER AVAILABLE ALL DURING CONSTRUCTION TIMES. F.E. FIRE EXTINGUISHER REINF. REINFORCED 8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR TO COORDINATE WITH ALL SUB CONTRACTORS F.E.C. FIRE EXTINGUISHER CABINET REQ. REQUIRED PER REQUIREMENTS ESTABLISHED BY THE OWNER, TENANT OR BOTH WHICH ARE UNDER SEPARATE 45. CONTRACTOR SHALL NOT SCALE, DERIVE, OR REQUEST DIMENSIONS FROM THE STRUCTURAL F.H.C. FIRE HOSE CABINET RESIL. RESILIENT CONTRACT WITH THE OWNER, TENANT, OR BOTH. ENGINEER, ELECTRICAL ENGINEER, MECHANICAL ENGINEER, PLUMBING ENGINEER, OR CIVIL ENGINEER, F.H.W.S. FLAT HEAD WOOD SCREW RM. ROOM ETC. FOR ANY ITEMS ON THE DOCUMENTS. ALL DIMENSIONS NEEDED WILL BE REQUESTED OF THE FIN. FINISH R.O. ROUGH OPENING 9. THE STRUCTURAL, ELECTRICAL, MECHANICAL, & PLUMBING & OTHER DRAWINGS AND JOB SPECIFICATIONS ARCHITECT "IN WRITING" IN THE FORM OF AN RFI. (FAILURE TO ADHERE TO THIS PROCESS WILL RESULT IN PLUMBING FIXT. FL. FIXTURE FLOOR RUB. RUBBER ARE SUPPLEMENTARY TO THE ARCHITECTURAL CONSTRUCTION DRAWINGS. ANY DISCREPANCY BETWEEN DENIAL OF CHANGE ORDERS) P-1 PLUMBING LEGEND, SCHEDULE & NOTES FLASH. FLASHING F.O.F. FACE OF FINISH THESE DOCUMENTS SHALL BE IMMEDIATELY BRIGHT TO THE ATTENTION OF THE ARCHITECT FOR P-2 PLUMBING WASTE & VENT FLUOR. FLUORESCENT F.O.S. FACE OF STUDS CLARIFICATION. P-3 PLUMBING WATER F.O.C. FACE OF CONCRETE F.O.SH. FACE OF SHEATING 10. THE INTENT OF DRAWINGS AND SPECIFICATIONS IS TO INCLUDE ALL LABOR, MATERIALS & SERVICES P-4 PLUMBING ISOMETRIC F.O.F. F.O.S. FACE OF FINISH FACE OF STUDS FPRF. F.S. FIREPROOF FULL SIZE NECESSARY FOR THE COMPLETION OF ALL WORK SHOWN, DESCRIBED, OR REASONABLY IMPLIED, BUT NOT PFP1 PROPOSED FLOOR PLAN F.O.SH. FACE OF SHEATING FT. FOOT OR FEET LIMITED TO THAT EXPLICITLY INDICATED ON THE CONTRACT DOCUMENTS. FPRF. FIREPROOF FTG. FOOTING 11. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT ACCORDANCE WITH THE F.S. FULL SIZE MANUFACTURERS RECOMMENDATIONS, UNLESS NOTED OTHERWISE. FT. FOOT OR FEET RWD. REDWOOD FTG. FOOTING R.W.L. RAIN WATER LEADER 12. ANY WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION DRAWINGS, WITHOUT THE PRIOR APPROVAL OF THE OWNER AND THE ARCHITECT SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. 13. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY SPECIFIED MATERIALS OR SYMBOLS LEGEND EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR THAT WILL CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE. THE CONTRACTOR SHALL SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF MATERIALS AND EQUIPMENT HAVING LONG LEAD TIMES. FIRE AUTHORITY NOTES w of 1 1. FINAL INSPECTION BY THE FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN ADVANCE. ROOM NAME 14. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT. 101 ROOM NAME/NUMBER 1 SINGLE VIEW ELEVATION SUBSTITUTIONS SHALL BE OF EQUAL QUALITY. 2. THE PROJECT ADDRESS SHALL BE PROVIDED IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT STANDARDS. CEILING HEIGHT 15. UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL SUBMIT 3 SETS OF 1 SHOP DRAWINGS. FABRICATION SHALL NOT BEGIN UNTIL AFTER RECEIVING THE ARCHITECT'S OR ENGINEER'S 3. AN UNOBSTRUCTED ALL WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN PLACE PRIOR TO THE 101 DOOR NUMBER APPROVAL. DELIVERY OF COMBUSTIBLE BUILDING MATERIALS. MECHANICAL 1 4( A101 1 MULTI VIEW ELEVATION 16. THE ARCHITECT'S REVIEW OF SHOP DRAWINGS SHALL NOT RELIEVE THE GENERAL CONTRACTOR OR 4. FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF COMBUSTIBLE M-1 LEGENDS, SCHEDULES & NOTES SUBCONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM THE DRAWINGS AND SPECIFICATIONS UNLESS BUILDING MATERIALS. VV1 WINDOW NUMBER HE HAS, IN WRITING, AND BROUGHT TO THE ATTENTION OF THE ARCHITECT SUCH DEVIATIONS AT THE TIME OF M-2 HVAC DEMO PLAN 0 1 THE SUBMISSION, NOR SHALL IT RELIEVE HIM FROM RESPONSIBILITY FOR ERRORS OF ANY SORT IN THE SHOP 5. ACCESS / SECURITY GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL COMPLY WITH M-3 HVAC FLOOR PLAN DRAWINGS. LOCAL FIRE CODES. M-4 TITLE 24 U- OKEYNOTE 1 1 BUILDING SECTION 17. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED BUILDING PERMITS 6. FIRE SPRINKLER SYSTEMS, WHEN PROVIDED, SHALL MEET STATE & LOCAL FIRE CODES. o ui A3.1 A3.1 PRIOR TO STARTING CONSTRUCTION. 1, WALL TYPE 7. INSTALLATION OF FIRE ALARM SYSTEM SHALL BE IN ACCORDANCE WITH STATE & LOCAL CODES. (n 18. PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT SHALL HAVE EVIDENCE OF CURRENT - 1 WORKMAN'S COMPENSATION INSURANCE COVERAGE ON FILE WITH THE STATE LABOR CODES. 8. LOCATIONS & CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN ACCORDANCE WITH STATE & T EQUIPMENT WALL SECTION LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO THE APPROVAL OF THE FIRE INSPECTOR. VERIFY A3.1 19. PROVIDE CONTINUOUS INSPECTIONS AS SET FORTH IN LOCAL AND STATE CODES AND PER THE CONTRACT QUANTITY AND EXACT LOCATION FROM FIRE DEPARTMENT PRIOR TO ORDERING. DOCUMENTS AS NEEDED. 9. AT LEAST 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OR 2-A-10B:C SHALL BE PROVIDED WITHIN 75 PLUMBING 20. PRIOR TO THE ISSUANCE OF FINAL CERTIFICATE OF OCCUPANCY FOR THIS PROJECT, THE GENERAL FEET MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SF OR PORTION THERE OF. DETAIL REFERENCE CONTRACTOR SHALL SUBMIT A SIGNED CERTIFICATE TO THE DEPARTMENT OF BUILDING & SAFETY STATING A3.1 THAT ALL WORK HAS BEEN PERFORMED AND MATERIALS INSTALLED ACCORDING TO THE PLANS AND 10. STORAGE, DISPENSING, OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS OR GASES, AND T REVISION NUMBER SPECIFICATIONS AFFECTING NON-RESIDENTIAL ENERGY. OTHER HAZARDOUS MATERIALS SHALL COMPLY WITH STATE & LOCAL FIRE CODES. THE STORAGE AND USE OF HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO ANY MATERIALS 1 / A101 DETAIL REFERENCE 21. WHERE EXISTING TENANTS ARE ADJACENT TO THE JOB SITE, THE CONTRACTOR SHALL MINIMIZE BEING STORED OR USED ON SITE. A SEPARATE PERMIT IS REQUIRED. 0 REVISION CLOUD CONSTRUCTION NOISE. EXTREME CONSTRUCTION NOISE SHALL OCCUR ON NON -TYPICAL BUSINESS HOURS. Z q - - - CONTRACTOR SHALL NOTIFY THE BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES PRIOR TO WORK. 11. BUILDING NOT APPROVED FOR HIGH PILED STORAGE. A SEPARATE PERMIT IS REQUIRED FOR HIGH 1 ENLARGED PLAN REFERENCE 22. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND SURROUNDING AREAS FREE PILED STORAGE. W T T M O T T A3.1 FROM DUST AND DEBRIS. THE WORK SHALL BE INC CONFORMANCE WITH THE AIR & WATER POLLUTION • 00 CSC - - CONTROL STANDARDS AND REGULATIONS OF THE STATE DEPARTMENT OF HEALTH. T Q 0 23. CONSTRUCTION WASTE & DEBRIS SHALL BE DEPOSITED AT AN APPROPRIATE SITE. 0 Q > T >^ o m J N 24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB AFTER COMPLETION. uj T W Q 00 >T 25. THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED PER STATE AND LOCAL > T .--, W >_ CODES. w r- Q N o CN T � 26. IF TRENCHES OR EXCAVATIONS 6-0"-0" OR MORE IN DEPTH ARE REQUIRE, OBTAIN A BUILDING OR GRADING (V 06 PERMIT. � co xW 27. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE & COUNTY REQUIREMENTS. Q 28. THE CONTRACTOR IS RESPONSIBLE FOR BLOCKING OFF SUPPLY & RETURN AIR GRILLES & DUCTS TO KEEP Z DUST FROM ENTERING INTO THE BUILDING DISTRIBUTION SYSTEMS. 29. ALL CONSTRUCTION & DEMOLITION SHALL BE DONE IN ACCORDANCE WITH LOCAL & STATE CODES. D E F E RE D SUBMITTALS W 30. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS SHALL BE TO FACE OF Lu CURB, FACE OF CONCRETE, FACE OF FINISH OR CENTERLINE OF GRIDS. 31. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, UNLESS NOTED OTHERWISE. DEFERRED SUBMITTALS THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION MUST HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE 32. DIMENSIONS TAKE PRECEDENCE. DO NOT SCALE THE DRAWINGS. LARGER DETAILED DRAWINGS TAKE SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE BUILDING PRECEDENCE OVER SMALLER SCALED DRAWINGS. OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE REVIEWED BY THE REGISTERED DESIGN DATE: 01 /17/2022 JOB NO.: SEA-21-004 PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL FORWARD THEM TO THE BUILDING OFFICIAL WITH A RECEIVED 33. WHERE ELECTRICAL, MECHANICAL, OR PLUMBING ITEMS PENETRATE A FOOTING, SLAB, WALL CEILING ETC. NOTIFICATION INDICATING THAT THEY HAVE BEEN REVIEWED AND ARE IN GENERAL CONFORMANCE WITH THE IT IS REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE FURNISHED. CONTRACTOR DESIGN OF THE BUILDING. SHALL COORDINATE THE INSTALLATION OF ALL ITEMS WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION. ANY CONFLICT WITH THE CONSTRUCTIONS DOCUMENTS, SHALL BE BROUGHT TO THE 1. EXTERIOR BUILDING SIGNAGE ARCHITECT'S ATTENTION IMMEDIATELY. 2. FIRE SPRINKLER SYSTEM 3. FIRE MONITORING SYSTEM (IF NEEDED) A0ol 34. THE CONTRACTOR SHALL PROVIDE AND LOCATE ACCESS PANELS IN WALLS & CEILING CONSTRUCTION AS 4. FIRE ALARM SYSTEM (IF NEEDED) REQUIRED TO PROVIDE ACCESS TO FIRE SPRINKLER, MECHANICAL, PLUMBING & ELECTRICAL WORK. CITY OF FEDERAL WAY CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL TO THE ARCHITECT FOR APPROVAL.