23-101905City of Federal Way
Community Development Dept.
FILE
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PETERSON
Project Address: 2818 SW 340TH PL
Project Description: gas furnace installation
Mechanical
Permit #:23-101905-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 010920 0510
Owner
Applicant ,
Contractor
RICHARD PETERSON
BRIAN GRIFFISGRIFFIS HEATING INC
GRIFFIS HEATING INC (GENERAL)
2818 SW 340TH PL
402 E MAIN ST SUITE 130
GRIFFH1088DZ (1/5/25)
FEDERAL WAY WA 98023-7734
AUBURN WA 98002
402 E MAIN ST SUITE 130
AUBURN WA 98002
Additional Permit Information
Mechanical Work Valuation? .................................. 6704.27 Is this an Online or O.T.C. application?.................. Yes
Mechanical Fixtures
Furnaces 1
PERMIT EXPIRES Monday, 9 October, 2023
Permit Issued on Wednesday, April 12, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the i e ' cc dFou&h4he laws, rules and regulations of the State of
�tEn a f Federal Way.
Owner or agent:
Date:
CRY Or
Federal Way
THIS CARD IS TO RE�Lkn O\-SITE
Construction Inspection Record
I\SPEC•TION REQUESTS: (253) 535-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE IIHS C. RD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
By
LIFER Ground (4295)
Approved
Date
Q
By
Ditch corer (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
0
Pool Bonding (4195)
❑
Temporary Power (4275)
0
Service (4235)
Appi o'L'-d
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065)
Approved Approved to release test -Approved
By Date By Date By �`� Date!
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date