Loading...
23-101905City of Federal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PETERSON Project Address: 2818 SW 340TH PL Project Description: gas furnace installation Mechanical Permit #:23-101905-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 010920 0510 Owner Applicant , Contractor RICHARD PETERSON BRIAN GRIFFISGRIFFIS HEATING INC GRIFFIS HEATING INC (GENERAL) 2818 SW 340TH PL 402 E MAIN ST SUITE 130 GRIFFH1088DZ (1/5/25) FEDERAL WAY WA 98023-7734 AUBURN WA 98002 402 E MAIN ST SUITE 130 AUBURN WA 98002 Additional Permit Information Mechanical Work Valuation? .................................. 6704.27 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Monday, 9 October, 2023 Permit Issued on Wednesday, April 12, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the i e ' cc dFou&h4he laws, rules and regulations of the State of �tEn a f Federal Way. Owner or agent: Date: CRY Or Federal Way THIS CARD IS TO RE�Lkn O\-SITE Construction Inspection Record I\SPEC•TION REQUESTS: (253) 535-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE IIHS C. RD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ By LIFER Ground (4295) Approved Date Q By Ditch corer (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) 0 Service (4235) Appi o'L'-d Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test -Approved By Date By Date By �`� Date! PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date