Loading...
23-102237City of Federal Way Community Development Dep4 FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TAYLOR Project Address: 1304 S 288TH ST Mechanical Permit #:23-102237-00-ME Inspection Request Line: (253) 835-3050 Project Description: HEAT PUMP AND GAS FURNACE INSTALLATION Parcel Number: 720300 0645 Owner Applicant Contractor CARL TAYLOR BRIAN GRIFFISGRIFFIS HEATING INC GRIFFIS HEATING INC (GENERAL) 1304 S 288TH ST 402 E MAIN ST SUITE 130 GRIFFHI088DZ (1/5/25) FEDERAL WAY WA AUBURN WA 98002 402 E MAIN ST SUITE 130 98003-3126 AUBURN WA 98002 Additional Permit Information Mechanical Work Valuation? ............. :...:.::..... 16432 Is this an Online or O.T.C. application?.................. Yes M. Mechanical Fixtures Compressors / Heat Pumps 1 Furnaces 1 PERMIT EXPIRES Monday, 23 October, 2023 Permit Issued on Wednesday, April 26, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ON tgerjfMeral Way. Owner or agent: Date: orr Of •T Federal Way THIS C -ARD IS TO RE-1L-kIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-30>0 Scheduled inspections ntay be failed if this card is not on -site. DO N OT LOSE I®.S C ARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsttre about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL 0 By ❑ By UFER Ground (4295) Approved Date Pool Bonding (4195) Approved Date ❑ By ❑ By Ditch cover (4030) Approved Date Temporary Power (4275) Approved Da to 0 By ❑ BY Slab/Concrete Floor (4255) Approved to place concrete Date Senice (4235) Approved Date ❑ FeederslSub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ 'Mechanical Rough -in (4165) ❑ Gas Piping (4125)❑ Final -Mechanical (4065) Approved Approved to release test r - A"roved 1 - ;41 B-N Date By Date Bv)(late./- PLUMBING- 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to corer Approved Approved By Date By Date By Date