Loading...
23-102072Nr City of Federal Way Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: COVE EAST APARTMENTS Plumbing P71LE Permit #:23-102072-00-PL Inspection Request Line: (253) 835-3050 Project Address: 33030 1ST AVE S Parcel Number: 172104 9121 Project Description: Remove/replace electric water heater for units 110,116, and 121 Owner Applicant Contractor K C HOUSING AUTHORITY JASON HANLEYBROWNFAST WATER FAST WATER HEATER CO (PLUMBING) 600 ANDOVER PARK W HEATER COMPANY FASTWWH79901 (10/1/23) TUKWILA WA 98188 11715 NORTH CREEK PKWY S SUITE C-106 1715 NORTH CREEK PKWY S SUITE C-101 BOTHELL WA 98011 BOTHELL WA 98011 ' Plumbing Fixtures Water Heaters 3 PERMIT EXPIRES Monday, 16 October, 2023 Permit Issued on Wednesday, April 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Awksgt n and the City of Federal Way. Owner or agent: Date' CFTr OF Federal Way THIS CARD IS TO REILAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2,53) 335-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS (k". Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back: of this card. ELECTRICAL ❑ By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date El By Pool Bonding (4195) Approved Date ❑ By Temporary Power (4275) Approved Date ❑ B} Service (4235) Approved Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date l Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING- 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By ' n Date A/ f_2�