Loading...
23-102074City of Federal Way Community Development Dept. S, Ave S ' F Federalal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609F--,!,23 Project Name: COVE EAST APARTMENTS Project Address: 33030 1ST AVE S Project Description: Remove/replace electric water heater, unit 203 and 209 Plumbing Permit #:23-102074-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 172104 9121 Owner Applicant Contractor K C HOUSING AUTHORITY JASON HANLEYBROWNFAST WATER FAST WATER HEATER CO (PLUMBING) 600 ANDOVER PARK W HEATER COMPANY FASTWWH79901 (10/1/23) TUKWILA WA 98188 11715 NORTH CREEK PKWY S SUITE C-106 1715 NORTH CREEK PKWY S SUITE C-10 BOTHELL WA 98011 BOTHELL WA 98011 Plumbing Fixtures Water Heaters 2 PERMIT EXPIRES Monday, 16 October, 2023 Permit Issued on Wednesday, April 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: CITY 01 4 Op Federal Way THIS CARD IS TO REALM\ O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CAM. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL LIFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Q Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved Bv Date By Date By Date El Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -'Mechanical (4065) Approved Approved to Ielease test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date Date By i'j