23-101498City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MEADOWS
Project Address: 30125 3RD PL SW
Project Description: Remove/replace electric water heater
Plumbing
Permit #:23-101498-00-PL
Inspection Request Line: •(253) 835-3050
Parcel Number: 259970 0040
Owner
Applicant
Contractor
ELSIE MEADOWS
JASON HANLEYBROWNFAST WATER
FAST WATER HEATER CO (PLUMBING)
30125 3RD PL SW
HEATER COMPANY
FASTWWH79901 (10/1/23)
FEDERAL WAY WA 98023
11715 NORTH CREEK PKWY S SUITE C-106
1715 NORTH CREEK PKWY S SUITE C-10
BOTHELL WA 98011
BOTHELL WA 98011
Plumbing Fix
Water Heaters 1
PERMIT EXPIRES Tuesday, 19 September, 2023
Permit Issued on Thursday, March 23, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
UN
on the Cit of Federal Way.
9
Owner or agent: Date
CRY 0/
Federal Way
THIS C kFD IS TO REALM\ O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
El
UFER Ground (4295)
]
Ditch corer (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
0
Pool Bonding (4195)❑
Temporary Power (4275)
0
Service (4235)
Approved
Approved
Approved
Bv-
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
3
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
El Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ Mechanical Rough -in (4165)
❑ Gas Piping (4125)
0 Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
By Date
By Date
I - 9: 9i : �01 H
Q Plumbing Groundwork (4190)
❑ Rough Plumbing (4230)
1❑ Final - Plumbing (4075)
Approved to cover
Approved
�� Approved
By Date
By Date
r
By Date