23-101170a a - Mechanical
City of Federal Way + �� rF' Permit
�{•
Community Development Dept. .R a�.11111. TT .23 101170 00 ME
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: LARA
Project Address: 30024 2ND AVE SW Parcel Number: 513700 0020
Project Description: Replace gas furnace and install 3-ton a/c
Owner
Applicant
Contractor
RUBEN LARA
JAIMIE HOWBRENNAN HEATING & A/C
BRENNAN HEATING & A/C LLC
30024 2ND AVE SW
4601 S 134TH PL
(GENERAL 01)
FEDERAL WAY WA 98023
SEATTLE WA 98168
BRENNHA971R9 (12/29/23)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation?...... ...............:..»...... 8452 Is this an Online or O.T.C. application?.................. Yes
1�lcclra�ric�:l �;t'es
Air Conditioners - Stand Alonl 1 Furnaces 1_
PERMIT EXPIRES Saturday, 2 September, 2023
Permit Issued on Monday, March 6, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: 0 Date:
_N�
CITY o1
Federal Vichy
THIS CARD IS TO REALUN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TBIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if
you are ttnstrre about any, of the inspections or the inspection sequence. Qn-going inspections are logged on the back of this card.
ELECTRICAL
Q
UFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
0
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sob-panels (4045)
❑
Rough Electrical (4225)
0
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
0 Mechanical Rough -in (4165)
❑ Gas Piping (4125)
❑ Final - Mechanical (4065)
Approved
Approved to releue test
Approved
By Date
By Date
By Date 5f 1'
�
PLUMBING
Q Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 0 Final - Plumbing (4075)
Approved to cotter Approved Approved
By Date By Date By Date