23-101922City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 99003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name
Project Address
Project Description
KAUR/HARPREET
827 SW 347TH PL
Installing EV charger
FILE.
Electrical
Permit #:23-101922-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 132173 0100
Owner
Applicant
Contractor
SUKHWINDER KAUR
ANDY YOUNGPUGET SOUND SOLAR
PUGET SOUND SOLAR LLC (ELOI)
8014 BEDFORD LN SE
LLC
PUGETSS920RH (12/8/24)
OLYMPIA, WA 98501
805 RAINIER AVE S 805 RAIN
805 RAINIER AVE S
SEATTLE WA 98144
SEATTLE WA 98144
Is this an Online or O.T.C. application?...
Circuits - Residential
Additional Permit Information
Yes
Electrical Fixtures
PERMIT EXPIRES Tuesday, 10 October, 2023
Permit Issued on Thursday, April 13, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
�a in �n� a it ederal Way.
Owner or agent: Date:
_�k
CITY or
Federal Way
THIS CARD IS TO REAL -UN O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) S3S-3030
Scheduled inspections mac be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Fork must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
By
LTFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date"
MECHANICAL
0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) Q Final - Mechanical (4065)
Approved Approved to release test Approved
By Date By Date By Date
PLUMBING
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date By Date