Loading...
23-101806City ofFederal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) B35-2609 Project Name: AUGUSTINO Project Address: 36618 2ND PL SW Project Description: Branch Circuit for a Class 2 EV Car Charger Electrical Permit #:23-101806-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 570780 0060 Owner Applicant Contractor ANTHONY R AUGUSTINO MARK SPENCERRHEMA ELECTRIC LLC RHEMA ELECTRIC LLC 36618 2ND PL SW 628 S SPRUCE ST RHEMAEL940DH (3/9/24) FEDERAL WAY, WA 98023 BURLINGTON WA 98233 628 S SPRUCE ST BURLINGTON WA 98233 Additional Permit Information Is this an Online or O.T.C. application? ..........:....... Yes Electrical fixtures Circuits - Residential 1 PERMIT EXPIRES Wednesday, 4 October, 2023 .Permit Issued on Friday, April 7, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: CRY or `.- Federal Way THIS CJLRD IS TO RENLUN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (2S3) 835-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate_ Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ LIFER Ground (4295) ❑ Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date B} Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By G/` Date J -/�� MECHANICAL 0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) 0 Final -'Mechanical (4065) Approved Approved to release test Approved By Date ByDate By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date