Project Name: HODGE
Project Address: 4601 SW 316TH PL Parcel Number: 211551 0320
Project Description: gas furnace replacement / new tstat
Owner
Applicant
Contractor
KATHERINE HODGE
TAYLER MANNINGPACIFIC HEATING &
PACIFIC HEATING & COOLING
4601 SW 316TH PL
COOLING
(ELECTRICAL)
FEDERAL WAY WA
8607 DURANGO ST SW SUITE A
PACIFHC798DR (4/12/25)
98023-2183
TACOMA WA 98499
8607 DURANGO ST SW SUITE A
TACOMA WA 98023
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
_ Electrical Fixtures
Circuits - Residential 1 Thermostat 1
PERMIT EXPIRES Sunday, 8 October, 2023
Permit Issued on Tuesday, April 11, 2023
I hereby certify,that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
yva�,( to I! and t e (ty�o eral Way.
1� _
Owner or agent: Date:
W& CITY or
Federal Way
THIS C-tRD IS TO REILUN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this cud is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this cud.
ELECTRICAL
Q
By
UFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
0
Pool Bonding (4195)
❑
Temporary Poorer (4275)
Q
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
a❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ Mechanical Rough -in (4165)
❑ Gas Piping (4125)
❑ Final - Mechanical (4065)
Approved
Approved to release test
Approved
By Date
Bv- Date
Bv Date
PLUMBING
l Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑� Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date By Date