Loading...
23-101859� •i r— r Electrical i or Federal Way eiLE �'� y Permit #.23-101859-00-EL Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HODGE Project Address: 4601 SW 316TH PL Parcel Number: 211551 0320 Project Description: gas furnace replacement / new tstat Owner Applicant Contractor KATHERINE HODGE TAYLER MANNINGPACIFIC HEATING & PACIFIC HEATING & COOLING 4601 SW 316TH PL COOLING (ELECTRICAL) FEDERAL WAY WA 8607 DURANGO ST SW SUITE A PACIFHC798DR (4/12/25) 98023-2183 TACOMA WA 98499 8607 DURANGO ST SW SUITE A TACOMA WA 98023 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes _ Electrical Fixtures Circuits - Residential 1 Thermostat 1 PERMIT EXPIRES Sunday, 8 October, 2023 Permit Issued on Tuesday, April 11, 2023 I hereby certify,that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of yva�,( to I! and t e (ty�o eral Way. 1� _ Owner or agent: Date: W& CITY or Federal Way THIS C-tRD IS TO REILUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections may be failed if this cud is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this cud. ELECTRICAL Q By UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) ❑ Temporary Poorer (4275) Q Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) a❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date Bv- Date Bv Date PLUMBING l Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑� Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date