23-102261City of federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253} 83f>-2607 Fax: (253) 835-2609
Project Name: BOWMAN
... -4 -..
Project Address: 33309 42ND A VE S
Project Description: Add ac
Owner Applicant
PAMELA LATRJC BOWMAN DAVID HIRSTDEAR ELECTRIC INC
33309 42ND A VE S 19309 68TH A VE S SUITE R-106
FEDERAL WAY WA KENT WA 98032
98001
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Circuits -Residential
Eleol rical Fixt,ures
Thennostat
Electrical
Permit #:23-102261-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 618140 0790
Contractor
DEAR ELECTRIC INC (ELECTRICAL)
DEAREEl864PN (10/20/24)
26840 78TH A VE S
KENT WA 98032
PERMIT EXPIRES Tuesday, 24 October, 2023
Permit Issued on Thursday, April 27, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Q I\ f f I f\ I C: Date : ____ _ ff'. L. I '\I L....
Ff tw', I
cn:vu,-,,
Fe deral Way
THIS CA.RD IS TO RI::.\UJ.:\' O:\'-SITE
Construction In sp ec tio n Record
l:\'SPECTIO;\" REQlTSTS: (2 53) 835-3050
Schedukd in5pections may be failed ifthi,:, card is not on-;ite. DO :-,.or LO SE THIS C ~. Ins~ctions are listed as close to se~!ial ordd as pos'.>1bk
(read kft to right. top to bottom) Please ~chedule insp«tions as appropriate Work must not be cowred until it is approved. Check with your inspector if
you are \lll.':,,ue about :lny of the ~--pections or the inspection sequence. Ou-going inspections are logged on the bad~ ofthi, card.
GJ
By
IT]
By
[I]
By
ill
B~·
IT]
By
UITR Ground (4295)
Approved
Date
Pool Bonding (4195)
Approved
Date
Fffders/Sub-panels (4045}
Appro~~
Date
Final -Elechical {4055)
Appro,-ed
Date J-7l; jv;J
Mechankal Rough-in (4165)
Apptoved
Date
Plombmg Groundwo1·k (4190)
Awro,-m to c01.-e1
Date
ELECTRIC AL .
uJ Ditch conr (4030) 11] Slab/Concrete Floor (425S)
Approved Approved to pl.ace concrete
By Date By Date
II] Temporary Power (4275) m Senice (4235)
Appro·1:ed Appr01,--ed
By Date By Date
0 Rough Eled1ical {4225) [I) Ceiling Co"f"er (4020)
Appro\."ed Apptoved
By Date By Date
ME CHANICAL
II] Gas Piping (4125) m -Final -~lechanical (4065)
Appro1.1!d to relea'le test Approved
By Date By Date
PLUMBIN G
III Rough Plumbing (4230) [il Final -Plumbing (4075)
Appr<M!d Appro~·ed
By Date By Date