Loading...
23-101990Cily of Federal Way Community Development Dept. 33325 8th Ave S fede,nl W•y. w A 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 r -~ F Project Name: RIVERSTONE APARTMENTS Unit 122 Project Address: 27314 24TH A VE S Project Description: Remove/replace electric water heater, Unit 122 Owner Applicant KC IIOUSJNG AUTHORITY JASON I IANLEYBROWNF AST WATER 600 ANDOVER PARK W IIEATERCOMPANY TUKWILA WA 11715 NORTH CREEK PKWY S SU!TEC-106 98188 130TIIELL WA 9801 l Plumbing Fixtures Water Heaters Plumbing Permit #:23-101990-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 720480 0004 Contractor FAST WATER HF.ATF.R CO (PLUMBING) l-"/\STWWH79901 (10/1/23) 1715 NORTII CREEK PKWY S SUITE C-10• BOTHELi.. WA 98011 PERMIT EXPIRES Wednesday, 11 October, 2023 Pet·mit Issued on Friday. April 14, 2023 I hereby certify that the above information is correct ana that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of CTl\f t T~E f Federal Way Date ----------Owner or agent: Cll'YOf ---..~~ Federal Way THIS CARD IS TO RE:\J . .U:\" O:\" -SITE Consh·uction Inspection Record L"'-SPECTIO~ R.EQl"J:S TS : (253) 835-3050 Scheduled inspections ru.,y be failed if this card is not on-site. DO XOT LOS[ THIS cum. Inspections are listed as clo'lc' to sequential order as possible (read left to right. top to bottom). Please $chedule in.sp-cctions as appropriate. Work must not be cov{'!ed until it is approved. Clleck \\1th your inspector if you are tw.snre about :my of the inspections or the inspection sequence. On-going inspections are logged on the back ofthi,; card. ELECTRICAL [!] UFER Gronnd (429S) 0 Ditch c:on!r (4030) GJ Slab/Concrete Flooi-(4255) Appro\-ed Appr011ed Approved to p~~ concrete By Date By Date Br Date [TI Pool Bonding (4195) [I] Temporary Power (4275) II] Senic:e (4235) Approved Approved Approved By Date By Date By Date [J Feeders/Sub-pauels (4045) I!] Rough :Electrical (4225) III Ceiling Conr (4020) Approved Appro\'ed Approved By D11te By Date Br Date ffiil Final -£ledrical (4055) Appro\·ed By Date MECHANICAL IT] Mechaokal Rough-in (4165) m Gas Piping (4125) IT] Final -llechanical (4065) Appro\-ed Appro\"l!d to rekase test Approved Br Date By Date B~· Dat1.> PLUMBING El Plumbing Groundwo1·k (4190) 0 Rough Plumbing (4230) IT] Final -Plumbing (407S) Approved to cover ApptO\~d By Date By Date Br