23-101984City of Fedenil Way
Community Development Dept
3332S 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 fa,c: (253) 835-2609
Project Name: RIVERSTONE A~ARTMENTS Unit 231
Project Address: 27314 24TH AVES
Project Description: Remove/replace electric water heater, Unit 231
Owner Applicant
KC HOUSING AUTHORITY JASON HANLEYBROWNF AST WATER
600 ANDOVER PARK W HEATER COMPANY
TUKWILA WA I I 715 NORTH CREEK PK WY S SUITE C-106
98188 BOTHELL WA 98011
Plumbi~g Futu res
Water Heaters
Plumbing
Permit #:23-101984-00-PL
Inspection Request Line: (253} 835-3050
Parcel Number: 720480 0004
Contractor
FAST WATER HEATER CO (PLUMBING)
FASTWWH79901 (10/1/23)
1715 NORTH CREEK PK WY S SUITE C-IOr
BOTHELL WA 98011
PERMIT EXPIRES Tuesday, 10 October, 2023
Permit Issued on Thur~day, April 13, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the uONCTNE.!!~%';· :,O:!";. and regulations of the State of
Owner or agent: Date: _________ _
<"YO~
Federal Way
THIS CARD IS TO RE:\I..\I~ O~-SITE
Construction Inspection Record
I'.\"SPECTIO~ REQCTS T S : (253) 835-3050
Sc~ed inspections may be failed if this card is not on-site. DO :\'OT LOSE THIS CARD. Inspections are listed 3S dose to sequential order as possil:>k
(read left to right. top to bottom). Please sch(odule ins~tions as appropriate. Work must not l:>e covered until it is apprm:ed. (heck with your inspector if
you are Ufu-ure about :my of the inspections or the inspection sequence. On-going inspections are logged on the b:u:k of this c;u-d.
ELECTRIC AL
IT] UITR Groond (429S) [I] Ditch ronr (4030) [!] Slab/Concrete Floor (4255}
Approved Apprcn,-ed Approved to place con~te
By Date By Date By Date
0 Pool Bonding (4195) II] Temporary Power (4275) [I] ~nice (4235)
Appro\'ed Approved Approved
By Date By Date By Date
0 Fffders!Sob-paoels (4045) III Rough :Electrical (422S) II] Ceiling Conr (4020)
Approved Appro~'?!d Approved
By Date By Date By Date
lifil Final -:Elechical (4055)
Approved
By Date
MECHANICAL
IT] l\lechaoiral Rough-in (4165) II] Gas Piping (412:5) m Final -Mechanical (4065)
Appr~~-ed Apl)IO\'td to release test Approved
B)· Date s,· Date By Date
PLUMBING
II] Plumbing Groundwo1·k (4190) lI) Roagb Plumbing (4230) [II final -Plumbing (4075) ·
Appro\-ed to cover Approwd
Approved -} ff
By Date By Date By :T6 Date I:}~ u3