23-101979City of Federal Way
Community Development Dept
33325 8th Ave S
federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: RIVERSTONE APARTMENTS BLDG 19 ·
Project Address: 2412 S 273RD ST
Project Description: Remove/replace electric water heater, Unit 169
Owner Applicant
KING COUNTY ~IOUSING AUTHORITY JASON HANLEYBROWNFAST WATER
600 ANDOVER PARK W HEATER COMPANY
TUKWILA WA 98188-3326 I 1715 NORTH CREEK PKWY S SUITE C-I06
BOTHELL WA 98011
Plumbi1'g Fixtu res
Water Heaters
Plumbing
Permit #:23-101979-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 720480 0004
Contractor
FAST WATER HEATER CO (PLUMBING)
FASTWWH79901 (10/1/23)
1715 NORTH CREEK PKWY SSUITEC-101
BOTHELL WA 98011
PERMIT EXPIRES Tuesday, 10 October, 2023
Permit Issued on Thursday, April 13, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Owner or agent:
di\Ttl1'f E Fed~ral Way. Daw
----------
<"YOt .. ~~
Federal Way
THIS CARD IS TO R:DL.\1:\' O:\'-SITE
Construction Inspection Record
I::'\SPECTIO~ REQl:-:ESTS: (253) 835-3050
Sche<iuled inspections may be fuilcd if this card is not on-site. DO '.\"OT LOSI rms CARD. Inspections are li.sted as doSe to sequtntial order as possible
(read left to right. top to b-Ottow). Please schedule inspections as appropriate. Work must not be co\·ered until iris approved. Check with your inspector if
you are \lllS\l!e about any of the inspections Of the inspection S('({uellCC. On-going inspections are logged on the back of this card.
ELECTRICAL
G] UFER Ground (4295) [ii Ditch co,·er (4030) uJ Slab/Concrete Floo1· (4255)
Appr<n--ed Appro,'ll!d Approved to p!ac~ concrete
By Date By Date By Date
m Pool Bondiug (4195) III Temporary Power (4275) 0 Senice (4235)
ApprO\-ed Appro~~d Approved
By Date By Date By Date
III Feeders/Sob-panels (4045) [I] Roagh Electrical (4225) [II Ceiling Conr (4020)
Approved Approt~d Approved
By Date By Date By Date
lifil Final -Electiical (4055)
Approved
By Date
MECHANICAL
u] Mechanical Rough-in (4165) 0 Gas Piping (41:?5} [il Final -Mechanical (4065)
Appro,1!<1 Appto,'t!d to relcas,j! test Approved
By Date By Date B,· Date
PLUMBING
IT] Plumbing Groundl\·ork (4190) 11] Rough Plumbing (4230) l1] final -Plumbing (4075)
Appro\i!d to CO\'ef Appro,l!d Approved
1~/10/z ~ By Date By Date-By :1a Date