23-101317-00Electrical
City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PAK
Project Address: 35303 4TH PL SW
Permit #:23-101317-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 872450 0020
Project Description: BLUEBEAM - 7.20 kW roof -mounted PV solar system. (2) circuits.
Owner
Applicant
Contractor
SUNGYONG PAK
SOLGEN POWER LLC
SOLGEN POWER LLC
35303 4TH PL SW
5715 BEDFORD ST
SOLGEPL830RJ (1/24/24)
FEDERAL WAY WA 98023
PASCO WA 99301
5715 BEDFORD ST
PASCO WA 99301
Additional Permit Information
Is this an Online or O.T.C. application? .................. No
Circuits - Residential 2
NUMM*a] FixtaM
CONDITIONS:
Upon completion of installation, the following photographs shall be emailed to
planreview@southkingfire.org and alarms@southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
- Photo of the front of the house showing the address or street side view.
Email the photographs at least.2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending.
You will receive a response back from SKFR once the permit has been approved by SKFR so you can
schedule your electrical final inspection.
If no response from SKFR within 2 business days, call 253-946-7348 to check status.
PERMIT EXPIRES Monday, 2 October, 2023
Permit Issued on Wednesday, April 5, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin_�ton ,, ,nd the City of Federal Way -
Owner or agent: ❑ate.
As�
CITY OF
Federal Way
PERMIT #: 23 101317 00
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 35303 4TH PL SW
Project: SOOK KANG EUN FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
UFER Ground (4295)
Z❑
Ditch cover (4030)
3❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
El
Pool Bonding (4195)
El
Temporary Power (4275)
0
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Q
Feeders/Sub-panels (4045)
0
Rough Electrical (4225)
0
Final - S K F & R (4060)
Approved
Approved
Approved
\�
By
Date
By
Date
By
Date
1 a Ceiling Cover (4020) Final - Electrical (4055)
Approved Approved f Q
By Date By Date,%
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date