Loading...
23-101317-00Electrical City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: PAK Project Address: 35303 4TH PL SW Permit #:23-101317-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 872450 0020 Project Description: BLUEBEAM - 7.20 kW roof -mounted PV solar system. (2) circuits. Owner Applicant Contractor SUNGYONG PAK SOLGEN POWER LLC SOLGEN POWER LLC 35303 4TH PL SW 5715 BEDFORD ST SOLGEPL830RJ (1/24/24) FEDERAL WAY WA 98023 PASCO WA 99301 5715 BEDFORD ST PASCO WA 99301 Additional Permit Information Is this an Online or O.T.C. application? .................. No Circuits - Residential 2 NUMM*a] FixtaM CONDITIONS: Upon completion of installation, the following photographs shall be emailed to planreview@southkingfire.org and alarms@southkingfire.org - Finished installation showing 36" access from the ground and 18" clearance at roof peak. - Location of shutoff switch with signage. - Photo of the front of the house showing the address or street side view. Email the photographs at least.2 business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKFR once the permit has been approved by SKFR so you can schedule your electrical final inspection. If no response from SKFR within 2 business days, call 253-946-7348 to check status. PERMIT EXPIRES Monday, 2 October, 2023 Permit Issued on Wednesday, April 5, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washin_�ton ,, ,nd the City of Federal Way - Owner or agent: ❑ate. As� CITY OF Federal Way PERMIT #: 23 101317 00 THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Address: 35303 4TH PL SW Project: SOOK KANG EUN FEDERAL WAY WA 98023 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 UFER Ground (4295) Z❑ Ditch cover (4030) 3❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) El Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels (4045) 0 Rough Electrical (4225) 0 Final - S K F & R (4060) Approved Approved Approved \� By Date By Date By Date 1 a Ceiling Cover (4020) Final - Electrical (4055) Approved Approved f Q By Date By Date,% Rough Electrical Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date