23-102424-00--P
Mechanical
City of Federal Way Permit #:23-102424-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609 FILF
Project Name: DOMINGUEZ/HERMAN
Project Address: 33028 38TH AVE S Parcel Number: 614360 0598
Project Description: Replace single:head ductless
Owner
Applicant
Contractor
ANGEL DOMINGUEZ
DAVID HIRSTDEAR ELECTRIC INC
DEAR SERVICES (GENERAL)
33028 38TH AVE S
19309 68TH AVE S SUITE R-106
DEARSS*835D3 (3/23/25)
FEDERAL WAY WA 98003
KENT WA 98032
26840 78TH AVE S
KENT WA 98032
Additional Permit Information
Mechanical Work Valuation? ......................... I........ 10000 Is this an Online or O.T.C. application?.................. Yes
Compressors / Heat Pumps 1
PERMIT EXPIRES Saturday, 4 November, 2023
Permit Issued on Monday, May 8, 2023
1 hereby certify that the above information is correct and that the construction on the above described property,
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
ONLN
tiereral Way.
Owner or agent: Date:
441
cm or
Federal Way
THIS CARD IS TO REAL -UN O\-SITE
Construction Inspection Record
INSPECTION REQUESTS- (253) 335-3050
Scheduled inspections mad- be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are. unsure about any of the inspections or the inspection sequence. Oa -going inspections are logged on the back of this card.
ELECTRICAL
❑
By
UFER Ground (4295)
Approved
Date
❑
B`•
Ditch corer (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
0
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final - Mechanical (4065)
Approved Approved to release test Approved
By Date By Date By 76 Date 1,2
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑�
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date