23-101985-00City of Federal Way
L }—
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: REDONDO VISTA CONDOMINIUM Unit 102
Project Address: 28606 16TH AVE S
Project Description: Remove/replace electric water heater
Plumbing
Permit #:23-101985-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 720581 0180
Owner
Applicant
Contractor
HELGA SIMMONS
JASON HANLEYBROWNFAST WATER
FAST WATER HEATER CO (PLUMBING)
28606 16TH AVE S UNIT 102
HEATER COMPANY
FASTWWH79901 (10/1/23)
FEDERAL WAY WA 98003
11715 NORTH CREEK PKWY S SUITE C-106
1715 NORTH CREEK PKWY S SUITE C-101
BOTHELL WA 98011
BOTHELL WA 98011
Water Heaters
Plumbing Fixtures
PERMIT EXPIRES Tuesday,10 October, 2023
Permit Issued on Thursday, April 13, 2023
I hereby certify -that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton and the Cit of Federal Way.
0Owner or agent: s _ _ Date:
(,/', pa")
_�.k
CITY of
Federal Way
THIS CARD IS TO RE]LAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections ruay be failed if this card is not on -site. DO NOT LOSE THIS C -A-RD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom)_ Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
LTFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date y,-
MECHANICAL
Q
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date