Loading...
23-101996-00Mechanical City or Federal Way Community Development Dept. I L 33325 8th Ave S ( Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MCLAREN Project Address: 34426 30TH AVE SW Project Description: electric furnace to air handler replacement Permit #:23-101996-00-ME Inspection Request Line: '(253) 835-3050 Parcel Number: 797200 0220 Owner Applicant Contractor CHARLES MCLAREN TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 34426 30TH AVE SW COOLING PACIFAS093KA (9/8/23) FEDERAL WAY WA 8607 DURANGO ST SW SUITE A 12811 PACIFIC HWY SW 98023-3019 I TACOMA WA 98499 1 LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? ........... ........... I........... 8703 Is this an Online or O.T.C. application? .................. Yes Mechanical Fixtures Air Handling Units 1 PERMIT EXPIRES Wednesday,11 October, 2023 Permit Issued on Friday, April 14, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of hi' on h 'r tymf Federal Way. Owner or agent: 'Ll Date: J \` Nk. CITY OF 4- Federal Way THIS CARD IS TO REJLkLN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-30_50 Scheduled inspections tta y be failed if this cud is not on -site. DO NOT LOSE TH€} C .kRD. Inspections are fisted as close to sequeanal order as possible (read left to right. top to bottom) Please schedtile Inspections as appropriate. Work must not be covered until i[ is approved- Check witlt your Inspector if you are i msure about any of the Inspections or the inspection sequence. On -going inspecnous are logged on r11e back of this vied. ELECTRICAL ❑ UFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels (4045) Approved Rough Electrical (4225) Approved ❑ Ceiling Cover (4020) Approved By Date By Date By Date El Final - Electrical (4055) Approved By Date MECHANICAL 0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ -Final - Mechanical (4065) Approved Approved to release test Approved By Date BvDate By 1 C j Date/ PLUMBING ❑ Plumbing Groundwork (4190) Q Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date