23-100526-00Electrical
City of Federal Way Permit 4:23-100526-00-EL
Community Development Dept
33325 8th Ave S� Inspection Request Line: (253) 835.3050
Federal Way, WA 98003 p q
Ph: (253) 835-2607 Fax: (253) 835-2609
4
Project Name: THE WOODLANDS AT REDONDO CREEK LOT 61
Project Address: 30316 19TH AVE S
Project Description: NEW 200 AMP SFR; SQ FT 2490
Owner
D R HORTON
11241 SLATER AVE NE SUITE 120
KIRKLAND WA 98033
Applicant
SHANNON CHELETTEPROVIDENT
ELECTRIC INC
17615 SL 252ND ST
COVINGTON WA 98042
Additional Permit Information
,. Is this, Orlline or O.T.C. ap cation? .................
Yes
-
Electrical Fixtures
New Service: Residential 1
PERMIT EXPIRES Sunday; 30 July, 2023
Permit Issued on Tuesday, January 31, 2023
Parcel Number: 952651 0610
Contractor
PROVIDENT ELECTRIC INC (01)
PROVIEI103C2 (2/22/24)
PO BOX 7087
COVINGTON WA 98042
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be. in acEd
d nee with. the, laws. rules and regulations of the State of
i �Gity 4-Federal Way.
Owner or agent: Date.
cm w 4
Federal Way
THIS CARD IS TO RE -AL -UN O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-30'50
Scheduled inspections may be failed if this card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate Work niast not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ LIFER Ground (4295) ❑
Approved
By Date By
Q Pool Bonding (4195) Q
Approved
By Date g`-
❑ Feeders/Sub-panels (4045) Q Rough Electrical (4225)
Approved Approved
BvDate B�• Date 41
❑ Final - Electrical (4055)
pprocrd
By f Date -�
MECHANICAL
ELECTRICAL
Ditch corer (4030) ❑
Approved
Dater/ ✓�3 By
Temporary Poser (4275)
Approved
Date
❑ Mechanical Rough -in (4165)
Approved
By Date
Q Plumbing Groundwork (4190)
Approved to cover
By Date
0 Gas Piping (4125)
Approved to release test
By Date
PLUMBING
El Rough Plumbing (4230)
Approved
By Date
a—
n
By
0
By
0
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
Service (4235)
� Approved
Date 3�/�/� `�/�
Ceiling Corer (4020)
Approved
Date
Final -Mechanical (4065)
Approved
Date
Final - Plumbing (4075)
Approved
Date