Loading...
23-100526-00Electrical City of Federal Way Permit 4:23-100526-00-EL Community Development Dept 33325 8th Ave S� Inspection Request Line: (253) 835.3050 Federal Way, WA 98003 p q Ph: (253) 835-2607 Fax: (253) 835-2609 4 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 61 Project Address: 30316 19TH AVE S Project Description: NEW 200 AMP SFR; SQ FT 2490 Owner D R HORTON 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 Applicant SHANNON CHELETTEPROVIDENT ELECTRIC INC 17615 SL 252ND ST COVINGTON WA 98042 Additional Permit Information ,. Is this, Orlline or O.T.C. ap cation? ................. Yes - Electrical Fixtures New Service: Residential 1 PERMIT EXPIRES Sunday; 30 July, 2023 Permit Issued on Tuesday, January 31, 2023 Parcel Number: 952651 0610 Contractor PROVIDENT ELECTRIC INC (01) PROVIEI103C2 (2/22/24) PO BOX 7087 COVINGTON WA 98042 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be. in acEd d nee with. the, laws. rules and regulations of the State of i �Gity 4-Federal Way. Owner or agent: Date. cm w 4 Federal Way THIS CARD IS TO RE -AL -UN O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-30'50 Scheduled inspections may be failed if this card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate Work niast not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ LIFER Ground (4295) ❑ Approved By Date By Q Pool Bonding (4195) Q Approved By Date g`- ❑ Feeders/Sub-panels (4045) Q Rough Electrical (4225) Approved Approved BvDate B�• Date 41 ❑ Final - Electrical (4055) pprocrd By f Date -� MECHANICAL ELECTRICAL Ditch corer (4030) ❑ Approved Dater/ ✓�3 By Temporary Poser (4275) Approved Date ❑ Mechanical Rough -in (4165) Approved By Date Q Plumbing Groundwork (4190) Approved to cover By Date 0 Gas Piping (4125) Approved to release test By Date PLUMBING El Rough Plumbing (4230) Approved By Date a— n By 0 By 0 By Slab/Concrete Floor (4255) Approved to place concrete Date Service (4235) � Approved Date 3�/�/� `�/� Ceiling Corer (4020) Approved Date Final -Mechanical (4065) Approved Date Final - Plumbing (4075) Approved Date