23-102288-00City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
FILE
Electrical
Permit #:23-102288-00-EL
Inspection Request Line: (253) 835-3050
Project Name: CASTILLO
Project Address: 811 SW 347TH PL Parcel Number: 132173 0080
Project Description: We will be installing a circuit'for a ac unit outside and we will run Thermostat wire from ac
unit to furnace.
Owner
Applicant
Contractor
JOSEPH & LAUREN CASTILLO
ANATOLIY KOSIUKCHIEFTAN ELECTRIC
CHIEFTAIN ELECTRIC LLC
811 SW 347TH PL
8321 266TH ST E
CHIEFEL772C2(2/22/25)
FEDERAL WAY WA 98023
GRAHAM WA 98338
8321 266TH ST E
GRAHAM WA 98338
Is this an Online or O.T.C. application?.:....
Circuits - Residential
Additional Permit Information
Yes
_ Electrical Fixtures
1 Thermostat 1
PERMIT EXPIRES Wednesday, 25 October, 2023
Permit Issued on Friday, April 28, 2023
I hereeby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
as �nN, and t e Nity eras Way.
Owner or agent: Date:
a& C17r of 101
Federal Way
THIS CARD IS TO REALM\ 01-SITE
Construction Inspection Record
INSPECTION REQUESTS: (2_53) 335-3050
Scheduled inspections snag be failed if this card is not on -Site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. I-Vork must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑ UFER Ground (4295)
Approved
By Date
Q Ditch cover (4030)
Approved
By Date
❑ Slab/Concrete Floor (4255)
Approved to place concrete
By Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
a pprov ed
Approved
Approved
By
Date
By
Date
By
Date
❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020)
Approved Approved Approved
By Date By Date BS Date
❑ Final - Electrical (4055)
Approved
By Date
MECHANICAL
El
Mechanical Rough -in (4165)
•'❑
Gas Piping (4125)
Q
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
B,%r
Date
PLUMBING
0
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to corer
Approved
Approved
By
Date
By
Date
B3
Date