Loading...
16-104221I' I , I li I I WWAMM.U, I I RESUBMITTED APR 11 7017 PMEN"r Mr, Nazary Ivanchuk c/o Urban Design Group Renton, Washington 98057 (206) 833-8250 *71VIXTIT M-=. P-0-9-0 5007 Pacific Hwy. E, Suite 16 Fife, Washington 98424-2649 F-IT-INAMN 1QA0Q ry xxx S 2931d Street Federal Way, Washington PN: 7202500070 PROJECT DESCRIPTION This Stormwater Drainage Report has been prepared for the proposed single family residence to be constructed along South 2931d Street in Federal Way, Washington (PN: 7202500070). Applicable drainage requirements for the City of Federal Way are described Appendix C: Small Project Drainage Review Requirements of the 2009 King County Surface Water Design Manual (KCSDM) Our understanding of the project is based on our review of King County iffiap topographic information, the site plan provided by Urban Design Group, and our previous Geologic Hazard Assessment dated May 4, 2016. We understand that you propose to construct a two story single family residence in the upper, southern portion of the site. We anticipate that the proposed residence Will have a daylight basement configuration and will be wood framed. The proposed residence will have a roof area of 2,695 square feet (sq, and the proposed driveway will encompass about 409 sf. The proposed development will result in 3,104 sf of hard surfaces bong added to the site, 2,695 of which will be impervious. The site encompasses approximately 9�622 sf, 32.3 percent of which will be developed. Per Appendix C: The site is a single family residence that will result in >2,000 sf of new and/or replaced impervious surface; The proposed project will be located predominately on till soils; and The proposed project will not add more than 5,000 square feet of new impervious surface. Urban DesignGroup.293rd.DR Rev1 April 7, 2017 Page 2 Therefore, this project is within the thresh• •s set forth in Appendix C of ii* 'KCSDM, and the requirements indicated therein will apply. EXISTING CONDITIONS parcelThe subject parcel is located in the Redondo area of Federal Way, Washington. The irregular.:•' and generally a is 129 feetwide(north•south)by height91 to 150 feet deep (east to west), and encompasses approximately 0.22 acres. The parcel is bounded by South 293rd Street on the west, by existing residences on the north and south, and by a wooded, undeveloped slope to the east. 93,d Street right of way, is flat to The upland portion of the parcel, near the existing 2 gently sloping. About 10 to 30 feet east of the road, the site slopes steepen to about 35 to 60 percent, with the steeper portion in the south-central portion of the slope. Slopes in the cal about 10 to 12 feet. The area surrounding the seasonal♦i ♦. of the site slopes down at about 25 to 35 percent. Vegetation on the site consists of tall grasses, blackberries, and both native and invasive shrubs. Some scattered young deciduous trees and older fir trees are located along • •♦- :f •`.. i i • ■ '..♦ _ is / :• •-•..i `+ -'.• ••..': INFILTRATION+ •REPORT The USDA Natural Resource Conservation Service (NRCS) Web Soil Survey for Ki are derived from glacial fill, that form on 25 to 70 percent slopes. These soils are listed as having a "moderate to severe" erosion hazattl a severe building limitation for �lopes. Thes soils are listed in hydrologic soils group B/C. The Geologic Map of the Poverty Bay 7.5-minute Quadrangle, Washington, Derek B. Booth, Howard H. Waldron, and Kathy G. Troost (2003) indicates the site underlain by coarse -grained older glacial s-f/ ass♦). These soilsgenerally deposited before typicallythe Vashon stade of the Fraser Glaciation, some 12,000 to 15,000 years ago. The glacial deposits consists of a heterogeneous mixture of clay, sift, sand and gravel that has been ove ridden by the continental ice mass associated with the Vashon stade of Fraser glaciation. Th glacial deposits are considered overconsolidated, are typically in a very dense condition, and exhibits high strength and low compressibility characteristics where undisturbed. Surficial soii are - is to a looseto medium dense ♦ f • No areas of • • or mass wasting or noted on the map within the immediate vicinity of the site. Based on the SCS soils mapping and our experience in the area, onsite infiltration i site. A Geologic . it Assessment dated May 4 2016 was previously prepared for this parcel. SUB -BASIN• The site is located within a subbasin that generally drains to the north, northeast, a northwest towards a seasonal stream located in the eastern portion of the site. The site ��Tlzv S#:tP.14RXA1RffWwR ���Uexi 16.1, hile the ma)Q[it of the runoff is diverti away from by Urban Desig nGroup.293rd.DR—Rev1 April 7, 2017 Page 3 SMALL PROJECT DRAINAGE REQUIREMENTS The proposed project adds more than 2,000 sf and less than 5,000 sf of new impervious surface, and the total impervious surface is less than 10,000 sf; therefore, the Small Project Drainage Requirements apply per KCSDM Figure 1.12A. Appendix C of t KCSDM defines a small lot to be <22,000 Flow Control BMPs Full Dispersion is not feasible for this project. According to aerial imagery obtained 211Parcel cannot achieve a 100' long flow path established between the residence and the stream in the eastern portion of the site. Full Infiltration is not feasible. A 50 foot setback cannot be met between the infiltration device and a steep slope hazard area. There is also no feasible location on the site that allows for an infiltration facility to be setback 15 feet from the proposed residence and 5 feet from a property line that is also outside of a steep slope hazard area. Limited infiltration is infeasible for the same reasons. Basic Dispersion is not feasible. There is no location onsite that a basic dispersion device could be located to achieve a flow path slope of 15% or less over 20 feet. Sheet flow dispersion of stormwater runoff generated by the proposed driveway is not feasible because there is not sufficient room for a 10 foot long flow path downslope from the driveway. Rain Gardens are not feasible. There is no location onsite that is 50 feet or more from a steep slope hazard area. Nrmeable Pavement Is not feasible f6r1he proposed driveway based on the proximity toa steep slope as 46fined in the report dated May 4th 2016 arid 1116 discovery of fill material previously placed. Rainwater Harvesting and Vegetated Roof are not feasible. There is no location onsite that is 50 feet or more from a steep slope hazard area. Reduced impervious Surface Credit: Restricted Footprint is not feasible. The project proposes 3104 sf, 2695 sf of which is impervious. From the 4000 sf impervious surface threshold, 1305 sf of proposed impervious surface has been mitigated per the restricted foot print. This area can be discharged through a perforated pipe connection. However there is no city system available for discharge. Perforated Pipe Connection as illustrated in the 2009 King County Storm Water Manual C2.1 1 is not feasible. There is no city storm water system available for discharge. Erosion and Sediment Control Measures The following ESC Measures shall be met for the proposed project: 1. Mark Cdearing Limits: Clearing will be limited to the existing tall grass and scattered shrubs and trees. The approximate clearing limits have been clearly shown on the abbreviated plan sheet C-4. 2. Mihfir� Sediment Racked : A stabilized construction entrance has been clearly shown on the abbreviated plan sheet C-4 and will be located where the proposed driveway enters the site. Should sediment leave the site, all public roadz-� affected should be thoroughly cleaned. 3. Control Sediment A sediment control measure shall be implemented downstream of the project area. Sediment control measures should be installed prior to construction. Inlet protection should be installed in the first existing catch basins downgrade of the site and removed after all soils have been stabilized. A silt fence should be installed per the abbreviated plans, sheet C-4. UrbanDesignGroup.293rdDR—Rev1 April 7, 2017 Page 4 I R W-17d7-0 I I I• 5. gontM Rimoffi This will be accomplished through the provided ESC plan. See the attached abbreviated plans, sheet C-4. 6. ConbW Dewatetta: No dewatering will be required on this project. 7. This is a single family residential project. It is expected that there will be limited opportunity for construction pollution to be present on site. Contractors will be required to follow standard procedures concerning site cleanup, material storage, and handling of typically construction pollutants. 8. Fh9l 2g��kn: Per KCSDM, "Prior to final construction approval, the project site shall be stabilized to prevent sediment -laden water from leaving the project si after project completion. All disturbed areas of the project site shall be vegetated otherwise permanently stabilized. At a minimum, disturbed areas must be seeded and mulched to ensure that sufficient cover will develop shortly after final approva Mulch without seeding is adequate for small areas to be landscaped before ki October 1. All temporary ESC measures shall be removed within 30 days after final site stabilization is achieved or after the temporary measures are no longer needed. Trapped sediment shall be removed or stabilized onsite. Disturbed soil areas resulting from removal of measures or vegetation shall be permanently stabilized with seeding or sodding.' PROPOSED DRAINAGE DESCRIPTION The proposed drainage system was designed in accordance with Appendix C of the 2009 KCSDM. As no stormwater management method outlined in Appendix C is appropriate for the proposed single family residence, we recommend a detention tank for flow restriction be installed under the proposed driveway to manage the stormwater flows to be discharged to the edge of the stream buffer behind the proposed SFR. All roof drains should connect to this tank. Due to the soils encountered at the site, observed to be consistent with glacial till, and the presence of previously placed fill material we do not anticipate infiltration of the stormwater generated on the proposed driveway will be feasible. We recommend the driveway also be directed to the detention tank via a catch basin to retain sedimentation and then to two dispersion pipes located on the edge of the stream buffer. A 6-inch diameter corrugated HDPE pipe will extend from the detention tank, daylight behind the home and extend down the surface of the slope to the edge of the stream buffer. The pipe will be anchored to the if at the top and bottom of the pipe run. The total surface area being conveyed to the dispersion pipe will be approximately 3,104 sf or 0.07 acres. Based on the rational method to determine peak discharge and using the 1 00-year storm (Q-1 00) for the Tacoma vicinity, the peak flow from the total proposed impervious area of the is and driveway would be 0.9 x 3.65 x 0.07 = 0.23 cfs. A 6-inch corrugated HDPE line (Manning's n = 0.025), flowing full with a minimum slope of 30 percent has a conveyance capacity of 1.59 cfs, which is sufficient to handle the stormwater from the roof and.driveway area. The flow rates to the dispersion area were determined using WWHM2012 and were designed to meet the predeveloped flow. The drainage system, including pipe sizes, is shown on sheet C-2 of the accompanying abbreviated plans. U rban Desig n G ro u p.293 rd. D R_Rev 1 April 7, 2017 Page 5 Erosion control measures will be in place throughout the project. On a temporary basis, they will consist of silt fence installed along downhill sections of the project area. The site entrance will have a temporary construction entrance installed per the 2009 KCSDM. Permanent erosion control will consist of residential landscaping. UTILITIES It is the responsibility of the contractor to locate utilities prior to installing any stormwater systems. The One -Call Underground Utility Locate Center (1-800-424-5555 or 811) should be notified a minimum of 48-hours prior to digging on the site. COVENANTS, DEDICATIONS, EASEMENTS A maintenance covenant with be required to meet the Requirements of Appendix C KCSDM and must be recorded prior to the final construction approval for the proposed project. OTHER PERMITS OR CONDITIONS PLACED ON THE PROJECT In addition to this Drainage Report and Drainage Control Plan, that are required for the Site Development Permit, we anticipate other permits will be required by including but not limited to a building permit. PROJECT ENGINEER'S CERTIFICATION I hereby state that this drainage and erosion/sediment control plan for the Urban Design Group Project has been prepared by me or under my supervision and meets the standard of care and expertise which is usual and customary in this community for professional engineers. I understand that the City of Federal Way does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities prepared by me. Urban DesignG roup.293rd. DR—Rev1 April 7,2017 Page 6 We appreciate the opportunity to be of service on this project. Should you have need of additional information or services please call. Yours Very Truly, GeoResources, LLC Veronica R. Raub, EIT Staff Engineer in Training zrad P. Biggerstaff, LEG 7wriincipal VRR:FF;vrr DoclD: UrbanDesignGroup.293rd.DR Attachments: Drainage Control Plan Maintenance and Source Control Manual Frank Fiedler IV, PE Senior Civil Engineer RESUBMITTED DEC 0 2 21 GeoResourcesq LLC Ph. 253-896-1011 CrrY OF FEDERAL WAY 5007 Pacific Hwy. E, Suite 16 Fx. 253-896-2633 CDS Fife, Washington 98424 July 19, 2014 Updated May 4, 2016 Update 2 - November 21, 2016 Mr. Nazary Ivanchuk c/o Urban Design Group 879 Rainier Avenue N, Suite A-200 Renton, Washington 98057 (206) 838-8250 Attention: Mr. Alexey Ancheyev Geologic Hazard Assessment Proposed Single Family Residence xxxx South 293rd Place Federal Way, Washington PN: 7202500070 Job: UrbanDesignGroup.293rd.GHA2 INTRODUCTION This updated report provides additional information requested by the City related to our original geologic hazards assessment for the proposed single family residence to be constructed on the above referenced vacant parcel. The location of the site is shown on the attached Site Vicinity Map, Figure 1. Our understanding of the project is based on our discussions with you; our previous 2012 and 2014 site Visits, and a more recent June 26, 2014 site visit; our past experience in the site area; and out understanding of the City of Federal Way updated relevant municipal codes; revised code Chapter 19 (September 2016), We understand that you propose to construct a new single family residence in the upper portion of the subject parcel as shown in Figure 2. The residence Will be a two-story, wood -framed structure supported on spread footings, likely deepened in portions of the structure to meet the recommended setbacks. We understand that the residence will include a daylight basement. The purpose of our original services was to evaluate the surface and subsurface conditions at the site as a basis for assessing potential adverse impacts to and from the slopes located within the site area. We understand that because of the height and inclination of the slopes in the vicinity of the site, that an assessment is being required by the City of Federal Way Revised Code Chapter 19 to address geologic hazards at the site. Two hand auger explorations were completed, but no laboratory tests were performed as part of the scope for this assessment. Specifically, our scope of services for the project included the following: 1. Visiting the site and conducting a geologic reconnaissance to assess the site's soil, groundwater and slope conditions; 2. Excavating two shallow hand auger explorations at selected locations across the property; and 3. Addressing the appropriate geotechnical regulatory requirements for the proposed site development. Urban DesignG roup.293rd.GHAu2.doc (July 19, 2014) November 21, 2016 Page 2 SITE CONDITIONS The subject parcel is located in the Redondo area of Federal Way, Washington. The parcel is irregular in shape and generally measures 115 to 129 feet wide (north to south) by 91 to 150 feet deep (east to west) and encompasses approximately 0.22 acres. The parcel is bounded by South 293rd Street on the west, by existing residences on the north and south, and by a wooded, undeveloped slope to the east. A shallow seasonal drainage course is located along the eastern property line. The upland portion of the parcel, near the existing 293`d Street right of way, is flat to gently sloping. Between 10 to 30 feet east of the roadway, the site slopes steepen to between 35 to 60 percent, with the steeper portion located in the south-central portion of the site. Based on our recent observations, the ground rupture discussed in the Geol. esign September 16, 2016 letter is likely related to (1— The central portion of the site, where slopes are steeper"fhan 440 percent, has a vertical height approximately 10 to!12 feet. As the slope gets closer to a seasonal drainage channel located along the east side of the site, the ground surface flattens to 25 to 35 percent. The proposed location of the residence and site topography are shown on the attached Site Plan, Figure 2a. An aerial photograph of the site with topography obtained from the King County iMap website is included as Figure 2b. Vegetation on the site consists of tall grasses, blackberries, and both native and invasive brush. Some scattered young deciduous trees and occasional older fir trees are located along the north and east sides of the parcel. No springs or seepage was observed at the time of our site visit. No evidence of erosion, soil movement, landslide activity or deep- seated slope instability was observed at the site or the adjacent areas at the time of our site visit. Site Soils The USDA Natural Resource Conservation Service (NRCS) Web Soil Survey for King County maps the soils as Alderwood and Kitsap soils (AkF). The Alderwood and Kitsap soils are derived from glacial till, that form on 25 to 70 percent slopes. These soils are listed as having a "moderate to severe" erosion hazard a severe building limitation for slopes. These soils are listed in hydrologic soils group B/C. A copy of the SCS map for the site vicinity is attached as Figure 3. Site Geology The Geologic Map of the Poverty Bay 7.5-minute Quadrangle, Washington, Derek B. Booth, Howard H. Waldron, and Kathy G. Troost (2003) indicates the site underlain by coarse - grained older glacial deposits (Qpog,). These soils were generally deposited before the Vashon stade of the Fraser Glaciation, some 12,000 to 15,000 years ago. The glacial deposits consists of a heterogeneous mixture of clay, silt, sand and gravel that has been over ridden by the continental ice mass associated with the Vashon stade of Fraser glaciation. The glacial deposits are considered overconsolidated, are typically in a very dense condition, and exhibits high strength and low compressibility characteristics where undisturbed. Surficial soils are typically weathered to a loose to medium dense condition. No areas of landslides or mass wasting or noted on the map within the immediate vicinity of the site, however, a mass wasting deposit is shown on the map south and east of the parcel by about 500 to 600 feet. The mapped mass wasting deposit is on the east side of the stream channel valley from the site and immediately below an area of existing residential development. An excerpt of the above referenced map is included as Figure 4. The Washington State Department of Ecology Coastal Atlas for the site area indicates the flatter upland area to be "stable", while the slopes on the east side of the stream channel are mapped as "unstable". The unstable designation is likely attributed to the height and slope Urban Design G roup.293rd.GHAu2.doc (July 19, 2014) November 21, 2016 Page 3 of the slopes east of the streams. No areas of unstable recent or unstable historic landslides are shown on the Coastal Atlas within the site area. A copy of the Coastal Atlas map for the site area is attached as Figure 5. A series of oblique aerial shoreline photos obtained from the Coastal Atlas website are attached as Figures 6a through 6d. The photographs, taken between 1977 and 2006 show the site and adjacent areas. The three more recent photographs (1996, 2000, 2006) show the existing residential developments and site to be well vegetated. The 1977 shows the residential development below the site to be existing and the neighborhood that the site is located in to be under construction. The photographs are attached as Figures 6a through 6d.. Subsurface Conditions Two hand augers were excavated on the slope below the roadway in order to observe shallow soil conditions at the site. The hand augers generally confirmed the mapped stratigraphy, however the upper hand auger did encounter fill material,, likely associated with the original grading of the roadway and lot. The soils encountered in our hand augers were characterized in accordance with the Unified Soil Classification System, a copy of which is attached as Figure 7. Logs of the test pits are attached as Figure 8. In general, the soils encountered below the topsoil and then layer of fill material (about 24 inches) consisted of medium dense to dense silty sand with gravel, weathered glacial till. We expect that very dense undisturbed glacial till occurs at depth. GEOLOGIC HAZARDS The City of Federal Way Critical Areas Ordinance for Geologically Hazardous AreasA , ; state"geologically hazardous areas shall mean areas that, because of their susceptibility to"" - erosion, )andsliding, seismic or other geological events, are not suited to siting commercial, residential or industrial development consistent with public health or safety concerns."° The Revised Code of Federal Way is copied in italics, while our comments to the code are immediately following the code. Erosion Hazard Areas per Federal Way Revised Code The City of federal Way code defines erosion hazard areas as "those areas having a "severe" or "very severe" erosion hazard due to natural agents such as wind, rain, splash, frost action or stream flow." Landslide Hazard Areas per Federal Way Revised Code The Federal Way City Code defines landslide hazard areas as "those areas potentially subject to episodic downslope movement of a mass of soil or rock including but not limited to the following areas: a. Any area with a combination of. 1. Slopes greater than 15 percent; 2. Permeable sediment overlying a relatively impermeable sediment or bedrock; 3. Springs or groundwater seeps. b. Any area which has shown movement during the Holocene epoch, from 10,000 years ago to the present, or which is underlain by mass wastage debris of that epoch. c. Areas potentially unstable as a result of rapid stream incision, stream bank erosion, and undercutting by wave action. UrbanDesignGroup.293rd,GHAu2.doc (July 19, 2014) November 21, 2016 Page 4 d. Areas located in a canyon or on an active alluvial fen, presently or potentially subject to inundation by debris flows or catastrophic flooding. e. Areas that have a "severe" limitation for building site development because of slope conditions, according to the USDA SCS, f. Those areas mapped as Class U (Unstable), Uos (Unstable old slides), and Urs (unstable recent slides) by the Department of Ecology. g. Slopes having a gradient steeper than 80 percent subject to rock fall during seismic shaking" Seismic Hazards per Federal Way Revised Code The City of Federal Way Municipal Code defines seismic hazard areas as "those areas subject to severe risk of earthquake damage as a result of seismically induced ground shaking, slope failure, settlement or soil liquefaction, or surface faulting. These conditions occur in areas underlain by cohesionless soils of low density usually in association with a shallow groundwater table." CONCLUSIONS Based on our observations and site evaluations, it is our opinion that a landslide hazard, erosion hazard area, seismic hazard area, or steep slope area does not exist on or within 25 feet of the site. Erosion Hazard Areas per Federal Way Revised Code The site soils are mapped as AkF, which have a severe erosion hazard when exposed. Conventional construction BMP's should be installed prior to beginning construction. This will provide adequate erosion control for the disturbed areas of the site. It is critical that the installed erosion control measures be monitored and maintained, and if necessary modified based on changing site conditions. In the event that the site is not worked for 7days or more, the disturbed areas should be adequately erosion protected and maintained in the event of a significant storm event. This may include the use of plastic sheeting or mulch. Erosion control should specifically include the installation of silt fencing along the downslope and side slopes of the active construction area. Straw waddles and berms may also be necessary. We have not been provided with a copy of the proposed Temporary Erosion and Sediment Control (TESC) plan at this time. However, provided standard BMP's are installed pr[gr to beginning construction, the potential for erosion or sediment leaving the site should be minimal. Landslide Hazard Areas per Federal Way Revised Code The site has slopes steeper than 15 percent, but no adverse or intersecting contracts are mapped on the site, nor were any seeps or springs noted on the slope or along the seasonal stream channel. No areas of mapped landslide debris or activity were noted on the published USGS geologic map or coastal zone atlas. The stream channel is not deeply incised, and we anticipate that runoff from the developments along the margins of the stream channel have greatly decreased the amount of season flow, thereby reducing the potential for rapid stream incision or stream bank erosion. No areas of alluvial fans are mapped nor were any alluvial fans noted in the vicinity of the site at the time of our past site visits. The site soils (AkF) do have a severe building limitations because of slopes. The site is listed as being stable by the Department of Ecology Coastal Atlas, however the slope on the east side of the stream are mapped as unstable because of their height and inclination. No areas of historic or recent landslide activity were identified on the Coastal Atlas. The site slopes are not steeper than 80 with and subject to rock fall during seismic shaking. UrbanDesignGroup.293rd.GHAu2.doc (July 19, 2014) November 21. 2016 Page 5 Based on our observations and literature review, the site has one of the above indicators (severe limitations for building site development). As previously stated, we observed no evidence of active or ongoing landslides hazards were observed on the site or within 25 feet of the site. In our opinion, the site does not constitute an active landslide hazard area. Therefore, no prescriptive buffer should be imposed by the City of Federal Way. Recommended building setbacks are provided below. Seismic Hazards per Federal Way Revised Code The City of Federal Way Municipal Code defines seismic hazard areas as "those areas subject to severe risk of earthquake damage as a result of seismically induced ground occur in areas underlain bY coheslonless .soils of love density usually in association with a shallow groundwater table." Based on our observation and the subsurface units mapped at the site, we interpret the structural site conditions to correspond to a seismic Site Class "C" in accordance with Chapter 20 of ASCE 20. This is based on the likely range of equivalent SPT (Standard Penetration Test) blow counts for the soil types=; observed in the site area. These conditions were assumed to be representative for the conditions based on our experience in the vicinity of the site. These soils are not prone to liquefaction and do not constitute a seismic hazard area. Given the mapped stratigraphy of Pre -Olympia age gravel, which was overridden by the more recent Vashon stade of the Fraser Glaciation, it is our opinion that the potential for liquefaction is minimal. Buffers/Setbacks per Federal Way RCC The CFW code requires a 25-foot setback from geologically hazardous areas, unless specifically reduced by a geotechnical engineer. Because of the site slopes, virtually the entire site meets the technical definition of a steep slope site, and therefore the entire parcel would be within the hazard or buffer area. City of Federal Way Municipal Code allows for reduction or modifications of the 25-foot setback area if "no reasonable alternative exists and only if the development activity or land surface modifications will not lead to or create any increased` slide, seismic, or erosion hazard." Very little grading and filling will be required to accommodate the proposed residence, as most of the residence will be situated in the excavation for the daylight basement. The excavation of the upper slope area will effectively remove the existing ground rupture area near the top of the slope and address the old fill material placed on this portion of the site. We expect that the basement retaining wall will support a structural fill that will support the driveway and front yard area, thus eliminating the risk of slope instability in this area. Recommended Setback The City of Federal Way building department may require a building setback in accordance with IBC (International Building Code) standard requirements, IBC section 1805 requires a building setback from slopes that are steeper than 3HAV (Horizontal:Vertical) unless evaluated and reduced, and/or a structural setback is provided, by a licensed geotechnical engineer. The setback distance is calculated based on the vertical height of the slope. The typical IBC setback from the top of the slope equals one third the height of the slope... Using the IBC Setback criteria and given the vertical height of the slope below the proposed daylight basement residence, the foundations on the east (down slope) side of the residence should be setback a minimum of 4 feet from slope area. The -foot distance is based on a maximum vertical height of the slope between the residence and the stream of 12 UrbanDesignGroup.293rd.GHAu2.doc (July 19, 2014) November 21, 2016 Page 6 feet. Since the recommended setback distance likely cannot be met with typical construction methods, the foundation elements should be extended vertically to meet the recommended horizontal setback distance as a Structural Setback. Where the foundation is extended vertically, we recommend that the structural setback be measured horizontally from the lower outside edge of the foundation element to the face of the slope. We recommended minimum - structural setback depth of 3 feet below finish floor elevation for the foundations along the east side of the residence. A detail showing the structural setback configuration is attached as Figure 9. This will meet the recommended setback criteria, and the IBC setback criteria. Storm Drainage Based on the results of our explorations, the site soils consist of glacial till material These soils are will not support infiltration of the collected storm runoff. Based on our discussions, it will be possible to direct the collected roof and driveway runoff to the roadway, South 293 Place where an existing stormwater system exists. LIMITATIONS We have prepared this report for Mr. Nazary lvanchuk, Urban Design Group, and members of the design team for use in evaluating a portion of this project. Subsurface conditions described herein are based on our observations of exposed soils on the parcel. This report may be made available to regulatory agencies or others, but this report and conclusions should not be construed as a warranty of subsurface conditions. Subsurface conditions can vary over short distances and can change with time. Variations in subsurface conditions are possible between the explorations and may also occur with time. A contingency for unanticipated conditions should be included in the budget and schedule. Sufficient monitoring, testing and consultation should be provided by our firm during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether earthwork and foundation installation activities comply with contract plans and specifications. The scope of our services does not include services related to environmental remediation and construction safety precautions. Our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. If there are any changes in the loads, grades, locations, configurations or type of facilities to be constructed, the conclusions and recommendations presented in this report may not be fully applicable. If such changes are made, we should be given the opportunity to review our recommendations and provide written modifications or verifications, as appropriate. %PJr'WJr.-V •- 09awo M" (July 19, 2014) • 21, 2016 Page 7 We have appreciated working for you on this project. Please do not hesitate to call at your earliest convenience if you have any questions or comments. Respectfully submitted, GeoResources, LLC F, Elk, yj "o "o WAS K 22 50040 e d 0 BRADLEY orsv:" P SIGGERSTAFP 'i Brad P. Biggerstaff, LEG Dana C. Biggerstaff, PE Principal Senior Geotechnical Engineer BPB:DCB:bpb Doc ID: UrbanDesignGroup.NAZ.293rd.GHA Attachments: Figure 1: Vicinity Map Figure 2a: Site Plan Figure 2b: Site Aerial Photo Figure 3: SCS Soil Survey Figure 4: USGS Geology Map Figure 5: Coastal Zone Atlas Figures 6a through 6d: Oblique Shoreline Photographs Figure 7: Soil Classification System Figure 8: Hand Auger Logs Figure 9: Structural Setback IS II S279TH .4 A IsTat SMUIPL $a 0 ms-Molnes zsr,z Ok X7 t it Palk OST PugetSound IST IST S 2WJI PL WnIST S2MIIST --s 241M SM11ST MV2MDST 8 ar.9, W2Wosr 6S2MST A 1 WO S ff IV ssvMho ST VO VL 0%. &V227TIfST S23dTt7PL 829pTIIST 52WTHPL 2ETI1ST B%V290TkIPL S 29MI ST SMTIIFL S2WJIST Federal Wa P" MNST w O, S2NM PL IA S.'STST S M D SaaISTPL 30M T SW Mono ST 0 3BMIST q0 S 3wil PL S -XWTH sT $3MIST V V 0 AW11 Ft. S30TOIST W"I ST 'Re J� 9 0 C h Steel Lake 4 MV XBrifsT Steo)Leke rk It V swnw Approximate Site Location Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 ITIRM. ->•- Site Location Map Proposed Single Family Residences xxx & xxx South 293►d Place Federal Way, Washington Doe: UrbanDesignGroup.S23rdPlace.F July 2014 Figure 1 STORM DRNANACE CONNECT TO ENS CCNSTRuOt ENTRANCE GeoResources,L 5007 Pacific Highway E, Ste 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 SITE PLAN SCALE: 1 „ k. Scale V= 20' Site Plan Proposed Single Family Residences xxx & xxx South 293`d Place Federal Way, Washington Doo UrbanDesignGroup.S23rdPlace.F July 2014 Figure 2a Approximate Site Location (map created on King County iap website: hftp://www.kingcounty.gov/operations/gis/Maps/l`MAP.aspx) Not to scale _ • . _ o - SiteandTopography i% 11 • . Proposed Residences Fife, • sPhone: 253-896-1011 Federal Way, Washington 253-896-2633 An excerpt from the Geologic Map of the Poverty Bay 7.5-minute Quadrangle, Washington by Booth, Howard, and Troost, 2003 T; S Not to Sc� GeoResources, LLG USGS Geologic Map 5007 Pacific Highway East, Suite 16 Proposed Single Family Residences Fife, Washington 98424 xxx & xxx South 293rd Place Phone: 253-896-1011 Federal Way, Washington Fax: 253-896-2633 Doc: Urban DesignGroup.S23rdPlace.F July 2014 Figure 4 r Not to Scale Geoesources, LLC DOE Coastal Atlas 5007 Pacific Highway East, Suite 16 Proposed Single Family Residences Fife, Washington 98424 xxx & xxx South 293rd Place Phone: 253-896-1011 Federal Way, Washington Fax: 253-896-2633 Doc: Urban DesignGroup.S23rdPlace. F July 2014 Figure 5 Photo taken 5/19/1993 and obtained from the Washington State Department of Ecology Coastal Atlas Website (https.Ilfortress. wa.gov/ecy/coastalatlas/tools/Map.asp) GeoResources, LLC DOE Coastal Atlas 5007 Pacific Highway East, Suite 16 Oblique Shoreline Photograph Fife, Washington 98424 Proposed Single Family Residences Phone: 253-896-1011 xxx & xxx South 293rd Place Fax: 253-896-2633 Federal Way, Washington Doc: UrbanDesignGroup.S23rdPlace.F July 2014 Figure 6c Photo taken 6/26/1977 and obtained from'the Washington State Department of Ecology Coastal Atlas Website (hUps.,11fortress. wa.govlecylcoastalatlasltoolsIMap.asp) GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 DOE Coastal Atlas Obque Shoreline Photograph li Proposed Single Family Residences xxx & xxx South 293rd Place Fax: 253-896-2633 Federal Way, Washington Doc: urbanDesIgnGroup.S23rdPIace.F July 2014 Figure 6d IL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP GROUP NAME SYMBOL GRAVEL CLEANI GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GRAVEL COARSE GP POORLY -GRADED GRAVEL GRAINED More than 50% SOILS Of Coarse Fraction GRAVEL GM SILTY GRAVEL Retained on WITH FINES No. 4 Sieve GC CLAYEY GRAVEL More than 50% SAND CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND Retalned on No, 200 Sieve SP POORLY -GRADED SAND More than 50% Of Coarse Fraction SAND SM SILTY SAND Passes - WITH FINES No 4 Sieve SC CLAYEY SAND SILT AND CLAY INORGANIC MIL SILT FINE CL CLAY GRAINED SOILS Liquid Limit Less than 50 ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT More than 50% Passes- - CH CLAY OF HIGH PLASTICITY, FAT CLAY No. 200 Sieve Liquid Limit 50 or more ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES: SOIL MOISTURE MODIFIERS.- i.- Field classification is based on visual examination of soil Dry- Absence of moisture, dry to the touch in general accordance with ASTM D2488-90. Moist- Damp, but no visible water 2. Soil classification using laboratory tests is based on ASTM D2487.90. Wet- Visible free water or saturated, usually soil is obtained from below water table 3. Description of soil density or consistency are based on interpretation of blow count data, visual appearance of soils, and or test data. GeoResources, LLC Soil Classification 5007 Pacific Highway East, Suite 16 Proposed Single Family Residences Fife, Washington 98424 xxx & xxx South 2931d lace Phone: 253-896-1011 Federal Way, Washington Fax: 253-896-2633 Doc: UrbanDesignGroup.S23rdPlace.F July 2014 Figure 7 Hand Auger HA-1 Location: Upper west central portion of site Approximate Elevation: 276 feet Depth (inches) Soil Type Soil Descti Lion 0 6 Topsoil 6 24 Dark Orange -brown silty fine to medium SAND with gravel, some, asphalt (loose to medium dense, mosit)(fill) 24 36 SM Orange -brown silty fine to medium SAND with gravel (medium dense, moist)(weathered till) Terminated at 36 inches No caving observed. No groundwater seepage observed. Hand Auger HA-2 Location: East central portion of site, above stream channel Approximate Elevation: 270 feet Depth (inches) �p_.Soi I e _Ty Soil Descripji2n.... 0 - 4 Topsoil 4 - 22 Dark Orange -brown silty fine to medium SAND with gravel, some wood (loose to medium dense, moist)(weathered till/fill?) 22 - 42 SM Orange -brown silty fine to medium SAND with gravel (medium dense, moist)(weathered till) Terminated at 42 inches No caving observed. No groundwater seepage observed. GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 Excavated on: June �A Doe: Urban DesignGroup.S23rd Place.F C-lopes Greater Than 30 Percent Slopes Greater Than 30 Percent Conventional Foot!ng L-�m il ST. m GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 4— Footing Extension Not to scale Structural Setback Proposed Short Plat XXX — 97th place S Kent, Washington Doc: UrbanDaalgnGroup.S23rdPlace.F I July 20 4 Figure 9 Maintenance and Source Control Manua (App/Permit#:_--- — A Single Family Residence xxx S 293rd Federal Way, Washington 98023 PN:7202500070 ,QTIW MORION a IRMS li Ph 253-896-1011 Fax 253-896-2633 'UBMITTED CTTY 0 �F�EDE COMMUN E RMEN7 UrbanDesignGroup.293rd,OandM January ll,2017 Page 2 Urban Design Grou p.293rd.Oand M January 11, 2017 Page 3 MAINTENANCE IMPORTANCE AND INTENT The importance of maintenance for the proper functioning of stormwater control facilities cannot be over -emphasized. A substantial portion of failures (clogging of filters, resuspertsion of sediments, loss of storage capacity, etc.) are due to inadequate maintenance. Stormwater BMP maintenance is essential to ensure that BMPs function as intended throughout their full life cycle. Additionally, proper maintenance of stormwater facilities on this site is paramount t6maintaining the overall stability of the site's slopes. The fundamental goals of maintenance adflyffies ore to insure the eiltire flow conveyance system, including control and treatment, designed for,this site continue to fully function. For this site these include: * Maintain abty of storm facty to aftenuate flow rates * Maintain ability to safely convey design stormwater flows 6 Maintain ability to treat stormwater runoff quality Preserve soil and plant health, as well as stormwater flow contact with pla and soil systems Clearly identify systems so they can be protected Keep maintenance costs low Prevent large-scale'or expensive stormwater system failures Prevent water quality violations or damage to downstream properties RON TRIM -4 12 proper use, suggestions Tor mainienanuE be established. RESPONSIBLE PARTIES Once inStalled, the maintenance of the proposed stormwater structures and 8MPs will be the sole tespontibility of the property owner. During construction, the contractor shall exercise due care in preserving the system. I FACILITIES REQUIRING MAINTENANCE The following list describes the stormwater structures and BMPs as well as the entity responsible for the maintenance responsibility for each structure and BMP: • Onsite amended soils and landscaping — property owner • Onsite stormwater tightlines— property owner • Onsite foundation drains — property owner Onsite Pervious Pavement — property owner Dispersion pipe at outfall— property owner MAINTENANCE INSTRUCTIONS The parties responsible for maintenance must review and apply the maintenance requirements contained herein. These maintenance instructions outline conditions for determining if maintenance actions are required, as identified through inspection. However, they are not intended to be measures of the facility's required condition at all times between inspections. Exceedance of these conditions at any time between inspections or maintenance activity does not automatically constitute a violation of these standards. UrbanDesignGroup.293rd.OandM January ll,2017 Page 4 However, based upon inspection observations, the inspection and maintenance presented in the checklists shall be adjusted to minimize the length of time that a facility is in a condition that requires a maintenance action. For facilities not owned and maintained by the county, a log of maintenance activity that indicates what actions were taken must be kept on site and be available for inspection by the county. See Appendix A for a detailed maintenance checklist for all stormwater structures and BMPs requiring maintenance. VEGETATION MAINTENANCE The maintenance of onsite vegetation will be the sole responsibility of the property owner. The effectiveness of many stormwater facilities depends on the proper maintenance of the vegetation that effects the facility. Residential landscaping maintenance will include but not be limited to: 0 Pruning and cleanup of landscaping trees to prevent organic debris from entering the permanent stormwater system Pest and disease management Irrigation of vegetation Prevention of fertilizer and pesticides from entering the stormwater system POLLUTION SOURCE CONTROL Pollution source control will be the responsibility of the property owner. All pollution sources such as automobile washing, automobile maintenance, yard Was�K and compost, application of pesticides I fertilizer, household hazardous material, pet waste, and onsite sewage systems should utilize the BMPs listed in Appendix C of the 2009 KCSDM in order to reduce contamination of stormwater runoff at its source. ANNUAL COST OF MAINTENANCE The annual cost of maintenance will be the responsibility of the property owner. It is anticipated that the annual cost of maintenance will be low due to the nature of the site being a single family residence. PROJECT ENGINEER'S CERTIFICATION I hereby state that this drainage and erosion/sediment control plan for the proposed single family residence has been prepared by me or under my supervision and meets the standard of care and expertise which is usual and customary in this community for professional engineers. I understand that the City of Federal Way does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities prepared by me. 0� Urban DesignGmup.293rd.Oa nd M January 11, 2017 Page 5 We appreciate the opportunity to be of service on this project. Should you have ed of additional information or services please call. Yours Very Truly, GeoResources, LLC Imm"mm•I 'T70ognt Principal VRR:FF DocID: Urban DesignGroup.293rd.OandM Attachments: Appendix A - Maintenance Checklist Appendix B - Maintenance Covenant Frank Fiedler IV, PE Senior Engineer Urban DesignGroup.293rd. OandM January 11, 2017 Page 6 MAR. rat M-MIRMN2=1 TEXT OF INSTRUCTIONS FOR NON -VEGETATED PERMEA13LE RWEMENT Your property contains a stormwater Management flow control EMP (best management practice) calle+ permeahle pavement,'which was LrwslaUeed to minimize the storviriwater quantity and quaRy impacts of 1,V20,29 2M U'ararDmigp hlazual — Appftd'm C C46 some or all of the paved surfaces on your property. Permeable pavements reduce the amount of rainfall that becomes runoff by agowing ivater to seep through the pavement into a free -draining gravel or sand bed. where it can be infiltrated into the ground. The type(s) of permeable pavement used on your property is: C3 porous concrete, 0 porous asphaltic ccricrete. 0 permeable pavers. 0 modular grid pavement the King County Water and Land Resourcees Uivision or through a future development permit from County. Permeable pavements must be inspected after one majorstorm each year to make sure it is wor&g property, Prolonged ponding or standing water an the pavement surface is a sign that the system is defective and may need to be replacedIf this occurs, contact the pavement installer or the King County Water and Land Resources Division for further instructions. A typical permeable pavement system has a fife expectancy of approximately 25-years. To help extend the useful life of the system. the surface of the permeable pavernent should be kept clean and free of Leaves. debris, and sediment through regular sweeping or vacuum sweeping. The owner is responale for the repair of all ruts, deformation. aneor broken paying units. MM�Mtlliu Your property contains a stormwater management flow control SMF (best management practice) called grassed modular grid pavement,"whiich was installed to minimize the stomnwater quantity and quality impacts of some or all of the paved surfaces on your property. Grassed modular grid pavement has the runoff characteristics ofa Iawnwhile providing the weight-beariing capacity of concrete pavement. The grassed surface not only rr4nimizes rurtoff quantity, it helps to fdter pollutants generating by vehicular use of the surface, -SM I MQU r%N asgslcar- and design details must be maintained and may not be changed without written approval either from the King County Water and Land Resources Mvision or through a future development permit from King County. Grassed modular grid pavement must be inspeaed after one major storm each year to make sure it is -M stem W�2 •- and may need to be replaced. If this occurs, contact the pavement installer or the Kitig County Water and Land Resources Civision for furtherinstruc6ons. The grassed surface of the pavement must be regulariy mowed and maintained in a good condition, Bare spots must be replanted in the spring orfall. C:2 � RMUCED MWERVIOUS SURFACE CREDIT X TEXT OF lNsTRuc-nONS FOR RE STRICTED FOOTMNT restricted footpfint.' the practice of restricting the amount of jmplarv�us surface that may be added to 3 property so as to minimize the stormillvater runoff impacts caused t�y impervious surface. The toW impervious surface on your property may not excetd _ square foot without VIVA10in approval either from the King County Water and Land Resources Oivislon of through 4 future development permit from King County. . of it 1 4 criliteway 33 oeplcmv lt be changed without �Yritirrn approval either from the King CourityWattir and Land Resources Olvision or through a future developMent permit from King County, Jill Ill 11 Jill 111:1111p lil��;��' 11 M= Ill 1, 11L 1 1401 1 Your property contains a stormwalifir manageffIrTr -Milaw a 'minimum disturbance foundation,' which was instilled to minimize or iniiiii2ato for the stormilivater runoff impacts of some or all of the impervious surfaces on your property, This means that allt or a portion of the ftished living space ir� your house is elevated over a portillious surface through the us* of pierl Of 01 es, The pervious surface is intended to provide add�Tional capacity to Absorb and %lom the stormwamir runoff from your roof and surrounding areas, The design of this syslen, as dopicled by the fill control Gt4P sit plian and design deliads must be m airi in*"O. ey..q n ti � -E i: �ian�ed %i ut kwill.-4 a it prtval I ith Or ftM t�t YJAI. C I unity W�l 4-1 xd 0*4 Resources QlMsi�orl or through a future development permit from King County. In addition, the pervious surface beneath the elevated portmn of your house must not be used in manner that compact$ the 56f Your property contains a storrilivister management flow controi all (best management practice) called 6 decking over Pervious surf ce", which was installed to min mize or mitigate for oe vorml Open Grid a I runoff impacts of somt or all of the impo(vious surfaces on your property, The deeking his evenly spaced openings thAt allow min water to -reach the uncompaoted soil below. ythete it has an opportunity to 504k into the grolill Tho area And oper-iri of the dil as dopkied by the 6VIN control 8hlP Aile Plan and design Omits must be maintained and may not ce chtingodrAhout written approvai iiiiiihot from. the King County Water and Land Res.ourtes Divl%ion or through a future clavelopmeril permit from King County, In ad4itiorl, the parvious surface b-anoath III decking must not be used in manner that compacts the soil I DiP S Wrter E*njr M=ijal - AjrpNtN C C-11 119 C,111 PURFORATED PIPE C N. CTION INSTRUCTIONS0 TEXT OF Your property contain& a 5tormviater manaoement4w control ShiP (best Man3gement pr1ctia*) called a perforated pip . Y reduce the stormwaier runoff impacts of the impervious surfAce on your property.perforated pipe connectiondrainage W pipe with hotes in the bottom. designed to 'le3k- rumok conveyed by the pipe, Into a gravel filled Uonch where it can be soaked Into the sutroundiho $oil. The 6o�6ntctlon is iniandled to prov�di omfturiity for infiltration of any runoff that is A i drainage system such as 3 ditch ot ro3dway pipe system, The size, 3ndcompo5ition of the per(oral"Pipe connectiondepicted by a, . a. BMP site p'' and design details must be maintainedY may notbe changed without written approval King County Water s Land Resources Division of throughdevelopment permit from King County, The so!) ovortop of the perforated portion of the systern must not be "mputed or covered th impervious m3lerials, PERFORATED PIPE CONNECTIONFOR ....r® rarldol ii ifl PLAN VIEW O i y,. f ®4 St �£ �3'2r 3a P���f - e C m 14 2v�7r C-Sl No. 4 - Control StructurelFlow ResWcw UrbanDesignGroup.293rd.OandM January 11, 2017 Page 7 APPENDIX B I Wn. LIM.- I OLIN H MUCL4 101 UMTDIFIJi DECLARATION OF COVENANT FOR MAINTENANCE AND INSPECTION OF FLOW CONTROL BMPS Grantor: Grantee: King County Legal Description: Additional Legal(s) on: Assessor's Tax Parcel ID#: IN CONSIDERATION of the approved King County (check one of the following) U residential building permit, Q commercial building permit, ZI clearing and grading permit, El subdivision permit, or L1 short subdivision permit for Application No. relating to the real property ("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby covenants(covenant) with King County, a political subdivision of the state of Washington, and its municipal successors in interest and assigns ("King County" and "the County", or "its municipal successor"), that he/she(tlley) will observe, consent to, and abide by the conditions and obligations set forth and described in Paragraphs I through 8 below with regard to the Property. Grantor(s) hereby grants(grant), covenants(covenant), and agrees(agree) as follows: I 1, Grantor(s) or his/her(their) successors in interest and assigns ("Owners") shall retain, uphold, and protect the stormwater management devices, features, pathways, limits, and restrictions, known as flow control best management practices ("BMPs"), shown on the approved Flow Control BMP Site Plan for the Property attached hereto and incorporated herein as Exhibit A. 2. The Owners shall at their own cost, operate, maintain, and keep in good repair, the Property's BMPs as described in the approved Design and Maintenance Details for each BMP attached hereto and incorporated herein as Exhibit B. 3. King County shall provide at least 30 days written notice to the Owners that entry on the Property is planned for the inspection of the BMPs. Affer the 30 days, the Owners shall allow King County to enter for the sole purpose of inspecting the BMPs. In lieu of inspection by the County, the Owners may elect to engage a licensed civil engineer registered in the state of Washington who has expertise in drainage to inspect the BMPs and provide a written report describing their condition. If the engineer option is chosen, the Owners shall provide written notice to the Director of the Water and Land Resources Division or its municipal successor in interest ("WLR!') within fifteen days of receiving the County's notice of inspection. Within 30 days of giving this notice, the Owners, or the engineer on behalf of the Owners, shall provide the engineer's report to WLR. If the report is not provided in a timely manner as specified above, the County may inspect the BMPs without further notice. 4. If King County determines from its inspection, or from an engineer's report provided in accordance with Paragraph 3, that maintenance, repair, restoration, and/or mitigation work is required for the BMPs, WLR shall notify the Owners of the specific maintenance, repair, restoration, and/or mitigation work (Work) required under Title 9 of the King County Code ("KCC"). WLR shall also set a reasonable deadline for completing the Work or providing an engineer's report that verifies completion of the Work. After the deadline has passed, the Owners shall allow the County access to re -inspect the BMPs unless an engineer's report has been provided verifying completion of the Work. If the work is not completed properly within the time frame set by WLR, King County may initiate an enforcement action. Failure to ff , 111 lll =.-0oME - I �i I 1� lir Jill 1:! 11111111 I ..........1. -r4at ?.ddress Af- cu lllllli�J�qi��Iplllll�� 1111 11 INNER! illiIililli'lliil!!11!1 1111=1111111 I 1 110 -1 4 9 0044 1 ''1 ''i M,`: - 1 i — is —4 a 1 6 1 M IN WITNESS WHEREOF, this Declaration of Covenant for the Maintenance and Inspection of Flow Control BNTs is executed this day of 20 GRANTOR, owner of the Property COUNTY OF KING )ss. On this day personally appeared before me: , to me known to be the individual(s) described in and who executed the within and foregoing instrument and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein stated. Given under my hand and official seal this _ day of 20 Printed name Not Public in and for the State of Washington, residing at t I Project Name: 293rd Site Name: S293 Site Address: S 293rd Place City: Federal Way Report Date: 4/3/2017 Gage: Seatac Data Start: 1948/10/01 Data End: 2009/09/30 Timestep: 15 Minute Precip Scale: 1.00 Version Date: 2016/02/25 Version: 4.2.12 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POC1: 50 Year 293rd 4/3/2017 9:38:23 AM Page 2 W I Landuse Basin Data Predeveloped Land Use Bypass: No GroundWater: No Pervious Land Use acre C, Lawn, Steep 0.22 Pervious Total 0.22 Impervious Land Use acre Impervious Total 0 Basin Total 0.22 Element Flows To. Surface Interflow M 4=9 293rd 4/312017 9:38:23 AM Page 3 Bypass: No GroundWater: No Pervious Land Use acre C, Pasture, Steep 0.11 C, Lawn, Steep 0.04 Pervious Total 0.15 Impervious Land Use acre ROOF TOPS FLAT 0.06 DRIVEWAYS FLAT 0.01 Impervious Total 0.07 Basin Total 0.22 Element Flows To: Surface Interflow Vault 1 Vault 1 293rd 4/3/2017 9:38:23 AM Page 4 293rd 4/3/2017 9:38:23 AM Page 5 Mitigated Routing Vault 1 Width: Length: Depth: Discharge Structure Riser Height: Riser Diameter: Notch Type: Notch Width: Notch Height: Orifice 1 Diameter: Element Flows To: Outlet 1 7.507245642196 ft. 7.507245642196 ft.. 7 ft. 6 ft. 6 in. Rectangular 0.090 ft. 0.220 ft. 0.491 in. Elevation:0 ft. Outlet 2 Vault Hydraulic Table Stage(feet) 0.0000 0.0778 0.1556 0.2333 0.3111 0.3889 0.4667 0.5444 0.6222 0.7000 0.7778 0.8556 0.9333 1.0111 1.0889 1.1667 1.2444 1.3222 1.4000 1.4778 1.5556 1.6333 1.7111 1.7889 1.8667 1.9444 2.0222 2.1000 2.1778 2.2556 2.3333 2.4111 2.4889 2.5667 2.6444 2.7222 2.8000 Area(ac.) 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 Volume(ac-ft.) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.003 0.003 0.003 0.003 0.003 0.003 0.003 Discharge(cfs) 0.000 0.001 0.002 0.003 0.003 0.004 0.004 0.004 0.005 0.005 0.005 0.006 0.006 0.006 0.006 0.007 0.007 0.007 0.007 0.008 0.008 0.008 0.008 0.008 0.008 0.009 0.009 0.009 0.009 0.009 0.010 0.010 0.010 0.010 0.010 0.010 0.010 r0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 r .000 0.000 r .000 0.000 0.000 r 0.000 0.000 0.000 t .000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 293rd 4/3/2017 9:38:23 AM Page 6 2.8778 0.001 0.003 0.011 0.000 2.9556 0.001 0.003 0.011 0.000 3.0333 0.001 0.003 0.011 0.000 3.1111 0.001 0.004 0.011 0.000 3.1889 0.001 0.004 0.011 0.000 3.2667 0.001 0.004 0.011 0.000 3.3444 0.001 0.004 0.012 0.000 3.4222 0.001 0.004 0.012 0.000 3.5000 0.001 0.004 0.012 0.000 3.5778 0.001 0.004 0.012 0.000 3.6556 0.001 0.004 0.012 0.000 3.7333 0.001 0.004 0.012 0.000 3.8111 0.001 0.004 0.012 0.000 3.8889 0.001 0.005 0.012 0.000 3.9667 0.001 0.005 0.013 0.000 4.0444 0.001 0.005 0.013 0.000 4.1222 0.001 0.005 0.013 0.000 4.2000 0.001 0.005 0.013 0.000 4.2778 0.001 0.005 0.013 0.000 4.3556 0.001 0.005 0.013 0.000 4.4333 0.001 0.005 0.013 0.000 4.5111 0.001 0.005 0.013 0.000 4.5889 0.001 0.005 0.014 0.000 4.6667 0.001 0.006 0.014 0.000 4.7444 0.001 0.006 0.014 0.000 4.8222 0.001 0.006 0.014 0.000 4.9000 0.001 0.006 0.014 0.000 4.9778 0.001 0.006 0.014 0.000 5.0556 0.001 0.006 0.014 0.000 5.1333 0.001 0.006 0.014 0.000 5.2111 0.001 0.006 0.014 0.000 5.2889 0.001 0.006 0.015 0.000 5.3667 0.001 0.006 0.015 0.000 5.4444 0.001 0.007 0.015 0.000 5.5222 0.001 0.007 0.015 0.000 5.6000 0.001 0.007 0.015 0.000 5.6778 0.001 0.007 0.015 0.000 5.7556 0.001 0.007 0.015 0.000 5.8333 0.001 0.007 0.019 0.000 5.9111 0.001 0.007 0.029 0.000 5.9889 0.001 0.007 0.043 0.000 6.0667 0.001 0.007 0.135 0.000 6.1444 0.001 0.007 0.301 0.000 6.2222 0.001 0.008 0.415 0.000 6.3000 0.001 0.008 0.477 0.000 6.3778 0.001 0.008 0.530 0.000 6.4556 0.001 0.008 0.577 0.000 6.5333 0.001 0.008 0.621 0.000 6.6111 0.001 0.008 0.662 0.000 6.6889 0.001 0.008 0.700 0.000 6.7667 0.001 0.008 0.736 0.000 6.8444 0.001 0.008 0.770 0.000 6.9222 0.001 0.009 0.803 0.000 7.0000 0.001 0.009 0.834 0.000 7.0778 0.001 0.009 0.864 0.000 7.1556 0.000 0.000 0.893 0.000 293rd 4/3/2017 9:33:23 AM Page 7 0 j IL 13 1 a & K, r 'I k' o: 15 9D 95 0 0995 + Predeveloped Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.22 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 Total Pervious Area: 015 Total Impervious Area: 0.07 Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped, POC #1 Return Period Flow(cfs) 2 year 0.026527 5 year 0.044519 10 year 0.058017 25 year 0.076613 50 year 0.091468 100 year 0.107105 Flow Frequency Return Periods for Mitigated. POC #1 Return P�6dod FlOw(cfs) 2 year 00114392 5 year 0.023923 10 year 0 .0324,41 25 yea�r 0.64.29 50 year 0.06k$4 100 year o.014867 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1949 0.053 0.014 1950 0.051 0.013 1951 0.027 0.028 1952 0.013 0.011 1953 0.010 0.009 1954 0.021 0.010 1955 0.020 0.023 1956 0.028 0.013 1957 0.031 0.014 1958 0.018 0.013 293rd 4/3/2017 9:38:23 AM Page 8 1959 0.015 0.010 1960 0.030 0.032 1961 0.020 0.012 1962 0.008 0.009 1963 0.026 0.011 1964 0.024 0.010 1965 0.034 0.012 1966 0.015 0.010 1967 0.052 0.015 1968 0.031 0.011 1969 0.033 0.013 1970 0.025 0.012 1971 0.030 0.011 1972 0.048 0.021 1973 0.011 0.011 1974 0.032 0.010 1975 0.035 0.015 1976 0.023 0.012 1977 0.021 0..008 1978 0.024 0..012 1979 0.010 & 009 1980 0.066 0.015 1981 0.022 0.011 1982 0.051 0.058 1983 0.031 0..013 1984 0.014 0.011 1985 0.021 0.011 1986 0.028 &034 1987 0.025 0,032 1988 0.010 0.010 1989 0.008 0.008 1990 0.098 0.058 1991 0.068 0.037 1992 0.021 0.012 1993 0.012 0.011 1994 0.007 0.007 1995 0.017 0.013 1996 0.051 0.039 1997 0.029 0.032 1998 0.025 0.011 1999 0.075 0.019 2000 0.028 0.013 2001 0.011 0.008 2002 0.043 0.026 2003 0.044 0.010 2004 0.060 0.053 2005 0.026 0.015 2006 0.026 0.014 2007 0.090 0.046 2008 0.066 0.062 2009 0.037 0.024 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Mitigated. POC #1 Rank Predeveloped Mitigated 1 0.0976 0.0623 2 0.0904 0.0578 3 0.0751 0.0576 293rd 4/3f2017 9:38:57 AM Page 9 4 0.0678 0.0526 5 0.0660 0.0462 6 0.0655 0.0389 7 0.0596 0.0374 8 0.0530 0.0339 9 0.0519 0.0325 10 0.0514 0.0324 11 0.0511 0.0318 12 0.0508 0.0279 13 0.0483 0.0257 14 0.0442 0.0237 15 0.0425 0.0230 16 0.0371 0.0213 17 0.0350 0.0189 18 0.0341 0.0153 19 0.0330 0.0153 20 0.0316 0.0153 21 0.0314 0.0149 22 0.0313 0.0141 23 0.0308 0.0138 24 0.0305 0.0136 25 0.0296 0.0135 26 0.0294 0.0132 27 0.0284 0.0129 28 0.0283 0.0128 29 0.0282 0.0127 30 0.0273 0.0125 31 0.0259 0.0125 32 0.0258 0.0121 33 0.0256 0.0117 34 0.0251 0.0116 35 0.0250 0.0116 36 0.0249 0.0115 37 0.0241 0.0115 38 0.0238 0.0114 39 0.0231 0.0113 40 0.0221 0.0112 41 0.0211 0.0112 42 0.0209 0.0112 43 0.0208 0.0110 44 0.0205 0.0110 45 0.0201 0.0107 46 0.0198 0.0106 47 0.0185 0.0105 48 0.0174 0.0105 49 0.0152 0.0104 50 0.0150 0.0104 51 0.0145 0.0103 52 0.0128 0.0103 53 0.0116 0.0099 54 0.0108 0.0095 55 0.0107 0.0092 56 0.0099 0.0090 57 0.0096 0.0089 58 0.0096 0.0084 59 0.0080 0.0081 60 0.0077 0.0079 61 0.0071 0.0073 293rd 4/3/2017 9:38:57 AM Page 10 293rd 4/3/2017 9:38:57 AM Page 11 Duration Flows The Facility PASSED Flow(cfs) Predev mit Percentage Pass/Fail 0.0133 1999 1999 100 Pass 0.0141 1695 1524 89 Pass 0.0148 1461 1116 76 Pass 0.0156 1239 601 48 Pass 0.0164 1053 500 47 Pass 0.0172 866 461 53 Pass 0.0180 712 424 59 Pass 0.0188 572 381 66 Pass 0.0196 473 349 73 Pass 0.0204 406 316 77 Pass 0.0212 346 291 84 Pass 0.0220 301 266 88 Pass 0.0227 277 237 85 Pass 0.0235 246 210 85 Pass 0.0243 219 186 84 Pass 0.0251 191 169 88 Pass 0.0259 170 152 89 Pass 0.0267 151 142 94 Pass 0.0275 138 130 94 Pass 0.0283 117 122 104 Pass 0.0291 109 113 103 Pass 0.0299 98 105 107 Pass 0.0306 91 99 108 Pass 0.0314 83 91 109 Pass 0.0322 80 79 98 Pass 0.0330 75 74 98 Pass 0.0338 68 71 104 Pass 0.0346 67 65 97 Pass 0.0354 65 55 84 Pass 0.0362 62 52 83 Pass 0.0370 59 48 81 Pass 0.0378 56 45 80 Pass 0.0385 52 40 76 Pass 0.0393 51 36 70 Pass 0.0401 50 31 62 Pass 0.0409 48 27 56 Pass 0.0417 43 26 60 Pass 0.0425 41 26 63 Pass 0.0433 40 26 65 Pass 0.0441 39 25 64 Pass 0.0449 36 24 66 Pass 0.0457 35 21 60 Pass 0.0464 33 20 60 Pass 0.0472 32 19 59 Pass 0.0480 31 17 54 Pass 0.0488 28 15 53 Pass 0.0496 25 11 44 Pass 0.0504 25 11 44 Pass 0.0512 23 11 47 Pass 0.0520 19 9 47 Pass 0.0528 18 8 44 Pass 0.0536 16 6 37 Pass 0.0543 16 5 31 Pass 293rd 4/3/2017 9:38:57 AM Page 12 0.0551 16 5 31 Pass 0.0559 16 5 31 Pass 0.0567 16 5 31 Pass 0.0575 16 4 25 Pass 0.0583 16 2 12 Pass 0.0591 16 1 6 Pass 0.0599 12 1 8 Pass 0.0607 12 1 8 Pass 0.0615 12 1 8 Pass 0.0622 12 1 8 Pass 0.0630 11 0 0 Pass 0.0638 11 0 0 Pass 0.0646 10 0 0 Pass 0.0654 9 0 0 Pass 0.0662 7 0 0 Pass 0.0670 7 0 0 Pass 0.0678 7 0 0 Pass 0.0686 5 0 0 Pass 0.0693 5 0 0 Pass 0.0701 5 0 0 Pass 0.0709 5 0 0 Pass 0.0717 5 0 0 Pass 0.0725 4 0 0 Pass 0.0733 4 0 0 Pass 0.0741 4 0 0 Pass 0.0749 4 0 0 Pass 0.0757 3 0 0 Pass 0.0765 3 0 0 Pass 0.0772 3 0 0 Pass 0.0780 2 0 0 Pass 0.0788 2 0 0 Pass 0.0796 2 0 0 Pass 0.0804 2 0 0 Pass 0.0812 2 0 0 Pass 0.0820 2 0 0 Pass 0.0828 2 0 0 Pass 0.0836 2 0 0 Pass 0.0844 2 0 0 Pass 0.0851 2 0 0 Pass 0.0859 2 0 0 Pass 0.0867 2 0 0 Pass 0.0875 2 0 0 Pass 0.0883 2 0 0 Pass 0.0891 2 0 0 Pass 0.0899 2 0 0 Pass 0.0907 1 0 0 Pass 0.0915 1 0 0 Pass 293rd 4/3/2017 9:38:57 AM Page 13 Water Quality 441 O�n-ljne facility volume'. 0 a�feei Op4ne facility target flow. 0 dft. Adjusted for 15 min'; 0 dfi OffAine facility target flow- 0 cts AOjusted for 15 min: 0 cf�. 293rd 4/3/2017 9:38:57 AM Page 14 UDTedinique Usedfor Treatment? 1 so Comment 131AY 293rd 4/3/2017 9:38:57 AM Page 15 11111111111 111111 p�ljll !j 111111 ll��11111�1111 ll��Ijll I F L Tff•- +f IMPLND Changes 293rd 4/3/2017 9:39:22 AM Page 16 WJO =0 Predeveloped Schematic 293rd 4/3/2017 9:39:22 AM Page 17 Predeveloped UCI File RUN GLOBAL WHM4 model simulation START 1948 10 01 END 2009 09 30 RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 UNIT SYSTEM 1 END GLOBAL FILES <File> <Un> <----------- File Name ------------------------------ >*** <-ID-> *** WDM 26 293rd.wdm MESSU 25 Pre293rd.MES 27 Pre293rd.L61 28 Pre293rd.L62 30 POC293rdl.dat 9ND FILES *PN SEQUENC3 INGRP INDELT 00:15 PERLND 18 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 - #< ---------- Title ----------- >***T PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND 1 Basin 1 MAX 1 2 30 9 END DISPLY-INFO1 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE PARM # # K *** END PARM END GENER PERLND GEN-INFO <PLS ><------- Name ------- >NBLS Unit -systems Printer *** # - # User t-series Engl Metr *** in out *** 18 C, Lawn, Steep 1 1 1 1 27 0 END GEN-INFO *** Section PWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *** 18 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ***************************** PIVL PYR - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ********* 18 0 0 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO 293rd 4f3l2017 9:39:22 AM Page 19 PWAT-PAR1 <PLS > PWATER variable monthly parameter value flags *** - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT *** 18 0 0 0 0 0 0 0 0 0 0 0 END PWAT-PARM1 PWAT-PARM2 <PLS > PWATER input info: Part 2 *** # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY 18 0 4.5 0.03 400 0.15 0.5 END PWAT-P 2 PWAT-PARM3 <PLS > PWATER input info: Part 3 - # ***PETMAX PETMIN INFEXP 18 0 0 2 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 # - # CEPSC UZSN NSUR 18 0.1 0.15 0.25 END PWAT-PARM4 *** IFILD DPFR BASETP AGWETP 2 0 0 0 *** INTFW IRC LZETP *** 6 0.3 0.25 PWAT-STATEI <PLS > *** Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *** CEPS SURS UZS IFS LZS AGS 18 0 0 0 0 2.5 1 END PWAT-STATEI FANAEUPORKEN IMPLND GEN-INFO <PLS ><------- Name ------- > Unit -systems Printer *** - # User t-series Engl Metr *** in out *** END GEN-INFO *** Section IWATER*** ACTIVITY <PLS > ************* Active Sections ***************************** - # ATMP SNOW IWAT SLD IWG IQAL *** END ACTIVITY PRINT -INFO <ILS > ******** Print -flags ******** PIVL PYR - # ATMP SNOW IWAT SLD IWG IQAL ********* END PRINT -INFO IWAT-PAR1 <PLS > IWATER variable monthly parameter value flags *** # - # CSO RTOP VRS VNN RTLI *** END IWAT-PARM1 IWAT-PARM2 <PLS > IWATER input info: Part 2 *** # - # *** LSUR SLSUR NSUR RETSC END IWAT-PARM2 IWAT-PARM3 <PLS > IWATER input info: Part 3 *** # - # ***PETMAX PETMIN END IWAT-PARM3 IWAT-STATEI <PLS > *** Initial conditions at start of simulation # - # *** RETS SURS END IWAT-STATEI 0 293rd 4l3f2017 9:39:22 AM Page 20 f - y ♦ y TbJH 0.22 COPY 501 12 0.22 COPY 501 13 i M NETWORK <-Volume-> <-Grp> <-e er-><--Mult-->Tran <-Target vols> <-Grp> <-e er-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # #*** COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TISR 1 <-Volume-> <-Grp> <-Me er-><--Mult-->Tran <-Target vols> <-Grp> <-Me er-> *** <Name> # <Name> # #<-factor->strg <Name> # # <Name> # #*** END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer *** ------------------ >< --- > User -series En 1 Metr LKFG *** in out *** END GEN-INFO *** Section RCHRES*** ACTIVITY <PLS > ************* Active Sections ***************************** ## - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG *** END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ******************* PIVL PYR ## - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* END PRINT -INFO HYDR-PR1 RCHRES Flags for each HYDR Section *** - VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** END HYDR-PAR1 HYDR-PARM2 ## - # FTABO LEN DELTH STCOR KS D50 *** <------ ><-------- ><--------><--------><--------><--------><--------> *** END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section *** - #*** VOL Initial value of COLIND Initial value of OUTDGT *** ac-ft for each possible exit for each possible exit <------><-------- > <---><---><---><---><---> *** <---><---><---><---><---> END HYDR-INIT END RCHRES i • O FTABLES FTABLES EXT SOURCES <-Volume-> <Member> SsysSgap<--ult-->Tran <-Target vols> <-Grp> <-Me er-> *** <Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # #*** WDM 2 PREC ENGL 1 PRLD 1 999 EXTNL PREC WDM 2 PREC ENGL 1 IMPLD 1 999 EXTNL PREC 293rd 4/3/2017 9:39:22 AM Page 21 WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-e er-><--Mu1t-->Tran <-Volume-> <Member> Tsys Tgap Ad *** <Name> # <Name> # 4<-factor->strg <Name> # <Name> tem strg strg*** COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL END EXT TARGETS SS -LINK <Volume> <-Grp> <- e er-><--Mult--> <Target> <-Grp> <- e er->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** SS -LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END SS -LINK 12 SS -LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END SS -LINK 13 END SS -LINK END RUN 293rd 4/3/2017 9:39:22 AM Page 22 Mitigated UGI File RUN GLOBAL WWHM4 model simulation START 1948 10 01 END 2009 09 30 RUN INTERP OUTPUT LEVEL 3 0 RESUME 0 RUN 1 UNIT SYSTEM 1 END GLOBAL FILES <File> <Un#> < ----------- File Name ------------------------------ >*** <-ID-> *** WDM 26 293rd.wdm MESSU 25 Mit293rd.ES 27 Mit293rd.L61 28 Mit293rd.L62 30 POC293rdi.dat i FILES OPN Q INGRP INDELT 00:15 PERLND 15 PERLND 18 IMPLND 4 IMPLND 5 RCRES 1 COPY 1 COPY 501 DISPLY 1 END INGRP END OPN SEQUENCE DISPLY DISPLY-INFO1 # - #<---------- Title ----------- >***T PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND 1 Vault 1 MAX 1 2 30 9 END DISPLY-INFO1 END DISPLY COPY TIMESERIES # - # NPT NMN *** 1 1 1 501 1 1 END TIMESERIES END COPY GENER OPCODE # # OPCD *** END OPCODE PARM # K *** END FARM END GENER PERLND GEN-INFO <PLS ><------- Name ------- >NBLKS Unit -systems Printer *** - # User t-series Engl Metr *** in out *** 15 C, Pasture, Steep 1 1 1 1 27 0 18 C, Lawn, Steep 1 1 1 1 27 0 END GEN-INFO *** Section PWATR*** ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *** 15 0 0 1 0 0 0 0 0 0 0 0 0 18 0 0 1 0 0 0 0 0 0 0 0 0 END ACTIVITY 293rd 4f3l2017 9:39:22 AM Page 23 PRINT -INFO <PLS > ***************** Print -flags ***************************** PIVL PYR # - # ATMP SNOW PWAT SED PST PG PQAL MSTL PEST NITR PHOS TRAC ********* 15 0 0 4 0 0 0 0 0 0 0 0 0 1 9 18 0 0 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO PWAT-PAR1 <PLS > PWATER variable monthly parameter value flags *** - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFO HWT *** 1s 0 0 0 0 0 0 0 0 0 0 0 18 0 0 0 0 0 0 0 0 0 0 0 END PWAT-P M1 PWAT-PARM2 <PLS > PWATER input info: Part 2 *** # - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC 15 0 4.5 0.06 400 0.15 05 0.996 18 0 4.5 0.03 400 0.15 0.5 0.996 END PWAT-PARM2 PWAT-PARM3 <PLS > PWATER input info: Part 3 # - # ***PETMA.X PETMIN IFEXP 15 0 0 2 18 0 0 2 END PWAT-PARM3 PWAT-PARM4 <PLS > PWATER input info: Part 4 - # CEPSC UZSN NSUR 15 0.15 0.25 0.3 18 0.1 0.15 0.25 END PWAT-PARM4 *** INFILD DEEPFR 2 0 2 0 INTFW IC 6 0.3 6 0.3 ASETP AGETP 0 0 0 0 *** LZTP *** 0.4 0.25 PWAT-STATEI <PLS > *** Initial conditions at start of simulation ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 *** # - # *** CEPS SURS UZS IFS LZS AGWS GWVS 15 0 0 0 0 2.5 1 0 18 0 0 0 0 2.5 1 0 END PWAT-STATEI IMPLND GEN-INFO <PLS ><------- Name ------- > 4 ROOF TOPS/FLAT DRIVEWAYS/FLAT r • Section , Unit -systems Printer *** User t-series Engl Metr *** in out *** 1 1 1 27 0 1 1 1 27 0 ACTIVITY <PLS > ************* Active Sections ***************************** # - # ATMP SNOW IWAT SLD IG IQAL *** 4 0 0 1 0 0 0 5 0 0 1 0 0 0 END ACTIVITY PRINT -INFO <ILS > ******** Print -flags ******** PIVL PYR # - # ATMP SNOW IWAT SLD IWG IQAL ********* 4 0 0 4 0 0 0 1 9 5 0 0 4 0 0 0 1 9 END PRINT -INFO 1 • 3 293rd 4/3/2017 9:39:22 AM Page 24 <PLS > IWATER variable monthly parameter value flags # - # CSNO RTOP VRS VNN RTLI 4 0 0 0 0 0 5 0 0 0 0 0 END IWAT-PART TWAT-PARM2 <PLS > IWATER input info: Part 2 # - # *** LSUR SLSUR NSUR RETSC 4 400 0.01 0.1 0.1 5 400 0.01 0.1 0.1 END IWAT-PA'M2 IWAT-PARM3 <PLS > IWATER input info: Part 3 # - # ***PET MAX PETMIN 4 0 0 5 0 0 END IWAT-PARM3 IWAT-STATE1 <PLS > Initial conditions at start of simulation # - # RETS SURS 4 0 0 5 0 0 END IWAT-STATEI END IMPLND SCHEMATIC <-Source-> <--Area--> <-Target-> MBLK <Name> # <-factor-> <Name> # Tbl# Basin 1*** PERLND 15 0.11 RCHRES 1 2 PERLND 15 0.11 RCHRES 1 3 PERLND 18 0.04 RCHRES 1 2 PERLND 18 0.04 RCHRES 1 3 IMPLND 4 0.06 RCHRES 1 5 IMPLND 5 0.01 RCHRES 1 5 ******Routing****** PERLND 15 0.11 COPY 1 12 PERLND 18 0.04 COPY 1 12 IMPLND 4 0.06 COPY 1 15 IMPLND 5 0.01 COPY 1 15 PERLND 15 0.11 COPY 1 13 PERLND 18 0.04 COPY 1 13 RCHRES 1 1 COPY 501 16 END SCHEMATIC NETWORK <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1 <-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> <Name> # <Name> # #<-factor->strg <Name> # # <Name> # # END NETWORK RCHRES GEN-INFO RCHRES Name Nexits Unit Systems Printer # #< ------------------ >< --- > User T-series En Metr LKFG in out 1 Vault 1 1 1 1 1 28 0 1 END GEN-INFO *** Section RCHRES*** 293rd 4/3/2017 9:39:22 AM Page 25 13 ACTIVITY <PLS > ************* Active Sections ***************************** # - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG *** 1 1 0 0 0 0 0 0 0 0 0 END ACTIVITY PRINT -INFO <PLS > ***************** Print -flags ******************* PIVL PYR # - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR ********* 1 4 0 0 0 0 0 0 0 0 0 1 9 END PRINT -INFO HYDR-PAR1 RCHRES Flags for each HYDR Section *** - VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each FG FG FG FG possible exit *** possible exit possible exit * * * * * * * * * * * * * * *** 1 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2 END HYDR-PARM1 HYDR-PARM2 - # FTABNO LEN DELTH STCOR KS DB50 *** <------><-------->< -------- ><-------- ><-------- ><-------- ><-------- > *** 1 1 0.01 0.0 0.0 0.5 0.0 END HYDR-PARM2 HYDR-INIT RCHRES Initial conditions for each HYDR section *** - *** VOL Initial value of COLIND Initial value of OUDGT *** ac-ft for each possible exit for each possible exit <------><-------- > <--- ><--- ><--- ><--- ><---> *** <--- ><--- ><--- ><--- ><---> 1 0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 END HYDR-INIT END RCHRES SPEC -ACTIONS I SPEC -ACTIONS FTABLES FTABLE 1 92 4 Depth Area Volume Outflowl Velocity Travel Time*** (ft) (acres) (acre-ft) (cfs) (ft/sec) (Minutes)*** 0.000000 0.001294 0.000000 0.000000 0.077778 0.001294 0.000101 0.001825 0.155556 0.001294 0.000201 0.002580 0.233333 0.001294 0.000302 0.003160 0.311111 0.001294 0.000403 0.003649 0.388889 0.001294 0.000503 0.004080 0.466667 0.001294 0.000604 0.004469 0.544444 0.001294 0.000704 0.004827 0.622222 0.001294 0.000805 0.005161 0.700000 0.001294 0.000906 0.005474 0.777778 0.001294 0.001006 0.005770 0.855556 0.001294 0.001107 0.006051 0.933333 0.001294 0.001208 0.006320 1.011111 0.001294 0.001308 0.006578 1.088889 0.001294 0.001409 0.006827 1.166667 0.001294 0.001509 0.007066 1.244444 0.001294 0.001610 0.007298 1.322222 0.001294 0.001711 0.007523 1.400000 0.001294 0.001811 0.007741 1.477778 0.001294 0.001912 0.007953 1.555556 0.001294 0.002013 0.008160 1.633333 0.001294 0.002113 0.008361 1.711111 0.001294 0.002214 0.008558 1.788889 0.001294 0.002314 0.008750 1.866667 0.001294 0.002415 0.008938 1.944444 0.001294 0.002516 0.009123 2.022222 0.001294 0.002616 0.009303 2.100000 0.001294 0.002717 0.009481 2.177778 0.001294 0.002818 0.009654 293rd 4/3/2017 9:39:22 AM Page 26 2.255556 0.001294 0.002918 0.00e825 2.333333 0.001294 0.003019 0.0099e3 2.e11111 0.001294 0.003120 0.010159 2.488889 0.001294 0.003220 0.010321 2.566667 0.001294 0.003321 0.010481 2.644444 0.00I294 0.003421 0.010639 2.722222 0.001294 0.003522 0.0107e4 2.800000 0.001294 0.003623 0.010947 2.877778 0.001294 0.003723 0.011098 2.955556 0.001284 0.003824 0.0112e7 3.033333 0.00I294 0.003925 0.0113e4 3.111111 0.001294 0.004025 0.01I53e 3.188889 0.00129* 0.004126 0.011683 3.266667 0.001294 0.004226 0.011824 3.344444 0.00129* 0.004327 0.011964 3.*22222 0.001294 0.004428 0.012103 3.500000 0.00I294 0.00*528 0.012239 3.577778 0.0012e4 0.004629 0.012375 3.655556 0.001294 0.004730 0.012508 3.733333 0.0012e4 0.004830 0.012641 3.8111I1 0.001294 0.004931 0.012772 3.888889 0.001294 0.005032 0.012901 3.966667 0.001294 0.005132 0.013030 4.044444 0.001284 0.005233 0.013157 4.122222 0.001294 0.005333 0.013283 4.200000 0.001294 0.005434 0.013*07 4.277778 0.001294 0.005535 0.013531 4.355556 0.001294 0.005635 0.013e53 4.433333 0.001294 0.005736 0.013775 4.5111I1 0.0012e4 0.005837 0.013e95 4.588e89 0.001294 0.005937 0.01e014 4.666857 0.00129e 0.006038 0.014133 4.7e4444 0.001294 0.006138 0.014250 4.822222 0.001294 0.005239 0.014366 4.900000 0.001294 0.005340 0.014482 e.977778 0.001294 0.006440 0.014596 5.055556 0.001294 0.0065*1 0.014710 5.133333 0.0012e4 0.006642 0.014822 5.211111 0.001294 0.006742 0.01493e 5.28888e 0.001294 0.006843 0.015045 5.366667 0.0012e4 0.006943 0.015156 5.44*444 0.0012e4 0.007044 0.015265 5.522222 0.001294 0.007145 0.015374 5.600000 0.001294 0.007245 0.0154e2 5.677778 0.001294 0.007346 0.015589 5.755556 0.001294 0.007447 0.015695 5.833333 0.00129e 0.007547 0.01e468 5.911111 0.001294 0.007548 0.02e820 5.988889 0.001294 0.007749 0.043544 6.066567 0.001294 0.007849 0.135901 6.14444e 0.001294 0.007950 0.301791 6.222222 0.001234 0.008050 0.415160 6.300000 0.001294 0.008151 0.477392 6.377778 0.001294 0.008252 0.530181 6.455556 0.001294 0.008352 0.577772 6.533333 0.001294 0.008453 0.621454 6.611111 0.001294 0.008554 0.562057 6.688889 0.001294 0.00e654 0.700153 6.766e67 0.001294 0.00e755 0.736159 e.844444 0.001294 0.008855 0.7703e4 6.922222 0.001294 0.008956 0.803069 7.000000 0.0012e4 0.009057 0.e34e07 7.077778 0.0012e4 0.009157 0.86e551 Emu FzABLE 1 END FTABLES EXz SOURCES <-Volume-> <menber> SsysSgan<--mnIt-->rzau <-Target voIs> <-erp> /-member-> **+ <Name> # <Name> # tem strg<-factor-,otrg <Name> # # <mame» # # *++ woM 2 PREo amGL 1 eERLNo 1 999 EXzNL gnEc WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP END EXT SOURCES EXT TARGETS <-Volume-> <-Grp> <-e er-><--ult-->Tran <-Volume-> <Member> Tsys Tgap Amd *** <Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg*** RCHRES 1 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL RCHRES 1 HYDR STAGE 1 1 1 WDM 1001 STAG ENGL REPL COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL END EXT TARGETS SS -LINK <Volue> <-Grp> <-e er-><--ult--> <Target> <-Grp> <-e er->*** <Name> <Name> # #<-factor-> <Name> <Name> # #*** SS -LINK 2 PERLND PWATER SURO 0.083333 RCHRES INFLOW IVOL END SS -LINK 2 SS -LINK 3 PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL END SS -LINK 3 SS -LINK 5 IMPLND IWATER SURD 0.083333 RCHRES INFLOW IVOL END SS -LINK 5 SS -LINK 12 PERLND PWATER SURO 0.083333 COPY INPUT MEAN END SS -LINK 12 SS -LINK 13 PERLND PWATER IFWO 0.083333 COPY INPUT MEAN END SS -LINK 13 SS -LINK 15 IMPLND IWATER SURO 0.083333 COPY INPUT MEAN END SS -LINK 15 SS -LINK 16 RCHRES ROFLOW COPY INPUT MEAN END SS -LINK 16 END SS -LINK END RUN 293rd 4/3/2017 9:39:22 AM Page 28 293rd 4/3/2017 9:39:22 AM Page 29 293rd 4/3/2017 9:39:22 AM Page 30 Legal Notice Ell Sam • business interruption, and the like) arising out of the use of, or inabili if Clear Creek Solutions Inc. or their authorized representatives have possibility of such damages. Software Copyright@ by: Clear Creek Rights Reserved. www,,clearcreeksolutions.com M ZUSTiVIIIIINOMOWN11; — I - 293rd 4/3/2017 9:39:22 AM Page 31 BeEt wx Chapin 1-p From: Law Offices <lawofficenow@gmail.corn> Sent: Tuesday, June 23, 2015 1:51 PM To: Becky Chapin Subject: Re: Redondo Bay Tranquility Stream,,Buffer We preparing for the new changes Alexy & Nos, I've been assigned review of the Redondo Bay Tranquility stream buffer intrusion - UP IV application (File # 15-102547-UP), I'm not sure if you are aware, but the city's Critical Area Code is being updated and new regulations will be in place at the end of the month. However, your application will actually vest to the current critical area codes as it will be deemed a complete application before the June 30th, effective date. I wanted to give you the option of utilizing the new codes if you choose. The benefit of the new code is that the proposed stream buffer intrusion would be an administrative review process and the Community Development Director makes the final decision - a public hearing/Hearing Examiner Decision is no longer required. The buffer intrusion would be decided using process III review instead of process IV and you would be refunded the difference of about $1,557.20. The submitted Critical Areas Assessment, prepared by Habitat Technologies, will need to be updated. The new code adopts a different stream classification system. The minor stream would need to be re-evaluated in accordance with Washington Department of Natural Resources water typing system. In addition, mitigation sequencing, demonstration that all reasonable efforts have been examined to avoid and minimize impacts to the critical area, and an enhancement plan must be included in the stream report. I've attached the proposed draft ordinance for review. If approved by council, it will become effective June 30, 2015. 1 recommend you discuss the updates with your stream biologist to see if it will be a benefit to wait for the new codes before proceeding with your project. Your options are: 1. Continue with review of the Process IV application. Staff will prepare a recommendation to the Hearing Examiner. A public hearing before the Hearing Examiner will be scheduled. Hearing Examiner will make final decision. 0 2. Put the applicant on hold and wait for the June 30th effective date for updated critical area codes. Revise Critical Areas Assessment and resubmit as a Process III application (City will refund the difference). Staff will review the project and a Decision will be made by the Director. In either,option, the city may choose!to utilize our third -,party -consultants to review the report at the applicant expense. I will let you know if we send it out for review and a scope of work/task authorization will be generated for your review. Please let me know how you wish to proceed. If you want to set up a meeting to ♦ your options let me know. Feel free to ♦' me if you have any questions. www.cityoffederalwU.com Bellc-kly Chapin From: Becky Chapin Sent: Wednesday, October 26ZOI69:28AK4 To: 'admin@urbandesigns.us';'|awnfOcenoW@gnnaiicum' Subject: Redondo Bay Tranquility Status Update , Attachments: Federa|VVay'5-01-091516-gpo|.pdt201602I2I53716.pdf Good Morning, 7. The City's stream consultant Gmtte Associates has fMhed review and signed Won the Buffet Enhancement Plan prepared by Habitat Technologies. control system regarding the roof and driveway runoff, The City sent out a letter back on January 8, 2016, which stated tollowfng A feasible flow control system for roof and driveway runoff must be shown on the plans. Roof downspouts are shown; however, no method of ton"lling the roof runoff or d(*" runoff has been propose& $toep slope and dticol area reWidons outlined in te neods to be addressed. If the runoff is intended to be directed towaraTme stream or aeLe[1UU11 IdIlK Qj lellfffft be show on the plans and reviewed prior to approving the stream buffer intrusion. As scon as I get this information I can proceed With the Process III approval. Also, when the revised geotechnical report is submitted I will need to send it out to GeoDesignJbr review and final approval. If you have any questions please feel free to contact me. Becky Chapin -wFe� ���w�� ~�w~"=l���� 333258`"Avenue South Federal Way, VVA980U3'632S LEGAL DESCRIPTION REDONDO BAY TRANQUILITY TGW UND TNT PRIVATE ROAD A �7 URBAN DESIGN GROUP 879 RAINIER AVE N, STE A-200 RENTON,WA, 90057 (206)838-8250 ATTN: ALEXEY ANCHEYEV r r�r .. �a ,., ..r ra r ►. GEORESOURCES, LLC 5007 PACIFIC HWY EAST SUITE 16 FIFE, WA 98424 (253) 896-1011 fax (253) 896-2633 CONSTRUCTION SEQUENCE 1. FLAG CLEARING LIMCfS AS SHOWN. 2. INSTALL TEMPORARY CONSTRUCTION ENTRANCE(EXIT. 3. INSTALL SILT FENCE. LOCATION OF SILT FENCE I5 SHOWN ON TESC PLAN. 4. INSTALL INLET PROTECTION IN ALL EXISTING CATCH BASINS WITHIN 100 FEET OF THE SITE. S. CLEAR AND GRUB SITE. ANY AREA STRIPPED OF VEGETATION, WHERE NO FURTHER WORK 15 ANTICIPATED FOR A PERIOD OF 2 DAYS IN THE WET SEASON (OCTOBER THROUGH MAY) AND 7 DAYS IN THE DRY SEASON (3UNE THROUGH SEPTEMBER), SHALL BE STABILIZED WITH THE APPROVED EROSION & SEDIMENT CONTROL METHODS, (E.G., SEEDING, MULCHING. NETTING, EROSION & SEDIMENT CONTROL METHODS.). 6. ROUGH GRADE SITE. 7. INSTALL FOUNDATIONS AND BACKFILL. B. CONSTRUCT BUILDINGS, DRIVEWAYS, DISPERSION SYSTEM, AND OTHER IMPROVEMENTS SHOWN ON THE PLANS, 9. SEED (OR HYDROSEED) AND MULCH ALL EXPOSED AREAS. SEE AMENDED SOILS SPECIFICATIONS. 10. REMOVE TEMPORARY EROSION CONTROL FACILITIES INCLUDING INLET FILTERS AFTER ENTIRE SCTE IS STABILIZED AND THE POTENTIAL FOR EROSION HAS PASSED. 11. CLEAN ANY SILT THAT HAS ACCUMULATED IN THE DISPERSION TRENCH CATCH BASIN. CONTRACTOR NOTE ALL EXISTING UTILITIES SHOWN ON PLANS ARE TO BE VERIFIED HORIZONTALLY AND VERTICALLY PRIOR TO ANY CONSTRUCTION, ALL EXISTING FEATURES INCLUDING BURIED UTILITIES ARE SHOWN AS INDICATED ON RECORD MAPS AND SURVEY FURNISHED BY OTHERS. WE ASSUME NO LIABILITY FOR THE ACCURACY OF THOSE RECORDS AND SURVEY, FOR THE FINAL LOCATION OF EXISTING UTILITIES IN AREAS CRITICAL TO CONSTRUCTION CONTACT THE UTILITY OWNER/AGENCY. SECTIONURBAN DESIGN GROUP wo SFR TOWNSHIP 21, RANGE 04 NW STORMWATER PIPES 4" STORM PIPE — 4" SO — 4' ROOF DRAIN — 4" RD — 4" FOOTING DRAIN — 4" FD — SURFACE WATER FLOW EXISTING CONTOUR LABELS PROPOSED CONTOUR LABELS ., I i I I L 7JJN, A PERMEABLE PAVEMENT,- m DISPERSION NIOWNSPOUT VICINIY MAP NOT TO SCALE COPYRIGHT GOGGLE 2016 i wl J J G) i 0 U) 0 i 19 0 us ' ® m z a s m a 0 q q Pz Scerd COVER SHEET... C-1 GRADING AND DRAINAGE PLAN,.,..: ..... .;.'C- DRAINAGE DETAILS.... ........................ ....... .........C-3 TESCPLAN ..... .............. ...... ................. ....................................... ..... .C-4 TESCDETAILS.. .... ........................................................ ............... ....... C-5 ■ . a 1 f:.. i■ o■LI Q Lyff-Amz I 25' SETBACK FROM STEEP SLOPES EXISTING CURB PAVED DRIVEWAY 409 SF UNDERGROUND POWER 54" 0 TYPE II CB (OR EQUIVALENT) W/ FLOW RESTRICTOR AND VANED GRATE «a% GRAPHIC SCALE A ® g, { 1N FELT y ! iuch ®30 ft DISPERSION PIPE �3 it z o W af z F- — a cn o -. oa<® DfO�o Ln zNF0 Know what's below. 0 z N Call before you dig. 0 0ovz i) W a- NOTES: z Q X U AREAS OF DISTURBED SOILS SHALL BE AMENDED PER m X of cr-X W THE SOIL AMENDMENTS NOTE, DETAIL 5 ON SHEET C-3. � CL 5 TYPE II CB OR EQUIVALENT MAY BE USED BASED ON TANK VOLUME, AND ORRIFICE SIZE AT RESTRICTOR IF A STRUCTURE IS SELECTED THAT IS NOT CONCRETE, GROUND ANCHORING SHOULD BE PROVIDED. n Sm um DETENTION TANK SPECIFICATIONS: DRAINAGE PLAN VOLUME: 2550 GAL ORIFICE: 0.49 INCHES RISER NOTCH TYPE: RECTANGLE SIZE: 0.22 INCH HEIGHT 0.09 INCH WIDTH ROOF DOWNSPOUT, FITTED CAP ACCEPTAStE, THREADED --NN POUT' C:2� PREFERRED FINISHED GRADE ------- ROOF GRAIN SYSTEM PER '-N CONNECT TO STORM DRAIN. USE'PAIR' OF 45' USE "Y" FOR ELBOWS FOR END OF CONTINUATION ON UNIONS. LINE, 90- SWEEP ALSO SUITABLE FOR END OF LINE. ROOF DRAIN CLEAN OUT t picail , ) 2 SCALE :NIS C FUSED Oft I'LANDED ONKc' SPECIFIED IN PROPILE/PtAN, HOPE MOADDO OR FAVRICAIM TEE SAME COKNCTER AND DIMENSION RADIO AS PIFL X TEE DIAM. 1.5 X nou 04AM. WIN SPACING J'sx vapLE 0 0 WAASTER DMI, 40LO 14 rftOM1 14AU CF f1VLE 01MWO" Ir"O"E's) ' NO HOLES "r DIAMETER wem) pt'VED 81 DIC" Its 1 1004 HOLES CppoSITF PIPE tB INCH Ttt ":f INCH 14DIS) DISPERSION PIPE DETAIL 3 SCALE : NIS TOP OF 1111JP1--,,\ BUTT FUSED HOPE CORRUGATED PIPE TIE BARS TOGETHER WITH so- #a EPDXY COATED REBAR SPACED ROOF DRAIN CLEANOUT GALV. FENCE WIRE N 0 C DRIVEN MIN 24* INTO GROUND BEHAR ANCHOR AT TOP--,,-" BOTTOM OF SLOPE ANCHOR RESAR ANCHOR 4'O.C.. _G=�OMW ' WAIT! (.1111M) EXISTING GRADE DISPERSION PIPE, PERFORATIONS UP LOCATED AT STREAM BUFFER EDGE STORM OUTFALL SCALE : NM TYPICAL SOIL AMENDMENT GUIDE, FOR SINGLE FAM10 gqt!�. Qe,"QN Amgxn*TING SOILS 1N PLAC. Landscape Areas: 1. Scarify or till existing subgr0de 4 - 6 Inches: (Do not scarify or till within drip line of existing trees to be retained). 1. Place and ratotill 3 Inches of composted material (10% organic content) Into 5 Inches of soil for a AnTshed depth Of 12 Inches (4-6 Inch scarification + 8 Inches compost/soli -12 Inches) of un-compacted soil. Rake and remove rocks larger than 2 Inches In diameter and mulch areas with 2 inches of organic mulch. Lawn Areas: t Scarify or IN existing subgr ade 4-6 Inches. (Do not scarify or till Within drip line of existing trees to be retained). 2. Place and rolatill 2 Inches of composted material (5% organic content) Into 6 Inches of soil for I finished depth of 12 Inches of un-compacted soil. Water or roll to compact soil 85% of maximum, Rake to level. and remove surface woody debris and rocks larger than 1 Inch In diameter. OPTI-Q, Landscape Areas, 1. Scarify or Ull existing subgrode In two d1toctlans, to 6 inch 00tha (Do not scarify within drip One of exisHrig trA-as to be retained). 2. Use imported top Aull mtX containing 10 % Organic m0ftisr (typically around 40% compost). SIA porldon must be sand of sandy Wnit Place 3 Inches of imported top sell mix on surface and DO Into 2 Inches Of sandy still. Place and K10"01 3 fnchea of Imported topsoll mix on the Surface, fake smooth and remove surface rocks over 2 Inches In diameter. Mulch landscape beds with 2 Inches of organic mulch. Lawn Areas: 1. Scarify or till existing subgrade In two directions to 6 Inch depth. (Do not scarify within drip line of existing trees to be retained). 2. Use imported top sell met Containing 5% organic matter ("kally around 25% compost). Scul portion must be send or sandy team. Place 3 inches of Imported topsoil mix on surface and till Into 2 Inches of sandy soil. Water or roll to compact soil to 85% maximum. Rake to level, and remove surface rocks larger than I Inch In diameter. AMENDED SOILS l� J 0 I SHUT TIME: DRAINAGE DETAILS C-3 CONSTRUCTION ENTJ' LEGEND cle SILT FENCE -fl� o-e TOPSOIL STOCKPILE 3 CONSTRUCTION ENTRANCE C-6 CLEARING LIMITS GRAPHIC SCALE % inch to M Know whars below. Call before you dig. NOTE: INLET PROTECTION SHOULD BE INSTALLED AT ALL EXISTING CATCH BASINS WITHIN 100 FEET DOWNGRADE OF THE SITE. A 9 7 4} R z r CL Z V)w� W 0 i Z fl V=r- O 121 Q O O Q (r) u-) Z F— 0 (t} F— :D LJ=)0 a p v Z Z 0 W 4 x U m x cr-, Q�xLLI giffT>ML, TESC PLAN - SEEDING NOTES 1. SEEDING MIXTURE SHALL BE GRASS SEED AND SHALL BE APPLIED AT A RATE OF ILB PER 1000SQFT. 2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT ROOT STRUCTURE. 3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL, 3L1, ARMORING OF SEED BEDS WILL BE NECESSARY: (E.G., GEOTEXTILES„)UTE MAT: CLEAR TICCOVERING). 4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL. MEASURES SUCH AS GRADIENT TERRACES. INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS, AND SEDIMENT BASINS. S. THE SEED BEDS SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE ROUGHENING. PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE. 6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS USED SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS. 1. MULCH MATERIALS USED SHALL BE STRAW AND SHALL BE APPLIED AT A RATE OF ]DOLES PER 1000SQFT. 2. MULCHING SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN 2:1. 3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED BECAUSE OFTHE SEASON. 4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1. STORMWATER 1. ALL WORKMANSHIP': AND MATERIALS SHALL BE IN ACCORDANCE WITH COUNTY STANDARDS AND THE MOST CURRENT COPY F THE STATE OF WASHINaGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION(WSDOT / APWA) AND ASAMENDED BY THE COUNTY OR STATE. 2. TEMPORARY E OSION)W+ATER POLLUTION P N'TION MEASURES SHALL BE REQUIRED 4N ACCORDANCE WITH:THE PIERCE. COUNTY STORMWATER MANAGEMENT MANUAL. AND THE DEPT. OF ECOLOGY'S CONSTRUCTION 5TORMWATERGENERAL PERMIT. " SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN ON THIS DRAWING NOT PROVE ADEQUATE TO CONTROL EROSION AND SEDIMENTATION, THE APPLICAN rXIONTRACTOR: SHALL INSTALL .ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES, AND/OR STORM DRAINAGE SYSTEMS. 3. CALL THE UNDERGROUND LOCATE LINE 1-800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATIONS. 4. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO APPROVED PLANS ON FILE WITH THE COUNTY. ANY SIGNIFICANT DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE COUNTY. 5. A COPY OF THE APPROVED STORMWATER PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6. ALL EROSION CONTROL AND STORMWATER FACILITIES SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE DESIGNATED CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) DURING CONSTRUCTION, 7. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND OTHER RELATED OR REQUIRED PRIOR TO ANY CONSTRUCTION ACTIVITY IN THE MUNICIPALITY'S RIGHT OF WAY. IT SHALL ALSO BE THE R ONSION-ITY OF THE CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ABIDE BY ALL REQUIREMENTS FOR TRAFFIC CONTROL AND SAFETY WHEN WORKING IN THE ROAD RIGHT OF WAY. I. THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN THE EVENT OR DISCOVERY OF POOR SOILS, STANDING GROUNDWATER, OR SEVERE DISCREPANCIES FROM SOIL LOG DESCRIPTIONS AS NOTED ON THE PLANS, I. FOR PUBLIC SYSTEMS, THE CONTRACTOR SHALL CALL FOR INSPECTION 48 HOURS PRIOR TO COVERING ANY DRAINAGE STRUCTURE. D WITHIN SILT FENCE NOTES 1. FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL AND CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, A MINIMUM 6' OVERLAP, AND SECURELY FASTENED ON BOTH ENDS TO POST, 2. POSTS SHALL BE A MAXIMUM OF W APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF III'). 3. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 8" WIDE AND 12" DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. THIS TRENCH SHALL BE BACKFILLED WITH WASHED GRAVEL. 4. WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE F45TENED SECURELY', TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1" LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4" AND SHALL NOT EXTEND MORE THAN 24' ABOVE THE ORIGINAL GROUND SURFACE. S. THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND 20" OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 24' ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. 6. WHEN EXTRA STRENGTH FILTER FABRIC AND CLOSER POST SPACING IS USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POST WITH ALL OTHER PROVISIONS OF ABOVE NOTES APPLYING. 7. FABRIC FILTER FA C FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILJZED. 8. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 9. SILT FENCES WILL BE INSTALLED PARALLEL TO ANY SLOPE CONTOURS. 10. CONTRIBUTING LENGTH TO FENCE WILL NOT BE GREATER THAN 100'. 11. DO NOT INSTALL BELOW AN OUTLET PIPE OR WEIR. 12. INSTALL DOWNSLOPE OF EXPOSED AREAS, 13. DO NOT DRIVE OVER OR FILL OVER SILT FENCES. i0. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS MANHOLES.,. NOT LOCATE A TRAVELED ROADWAY OR SIDEWALK, SHALL HAVE SOLID LOCKING.' LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY SHALL HAVE FILTERFABRIC MATERIAL IN SOLID LOCKING UDS. CONTINUOUS ROLLS USE STAPLES OR WRE RINGS TO ATTACH FABRIC TO PLASTIC COVERING WIRE PURPOSE 6" WIRE MESH SUPPORTnr FENCE FOR FILTER MIN:'. PLASTIC COVERING PROVIDES IMMEDIATE, SHORT-TERM EROSION PROTECTION TO SLOPES �C� r FABRIC AND DISTURBED AREAS. NON woven z' CONDITIONS OF USE „h' ( FILTER FABRIC j MIN, PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS, EXCEPT AS STATED BELOW. "� MIN' 8"X32" PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES. r ) (_. II_ �TRECH ` f NOTE: THE RELATIVELY RAPID BREAKDOWN OF MOST POLYETHYLENE SHEETING MAKES IT _ _ _ _ _ _ _ UNSUITABLE FOR LONG-TERM (GREATER THAN 6 MONTHS) APPLICATIONS. TIN ) 6' MAX.. BACKFILL TRENCH WITH {,TIN,. CLEAR PLASTIC SHEETING CAN BE USED OVER NE'dWLY»SEEDED AREAS TO CREATE A GROWTH. IF THE HYDROSEED WAS INSTALLED I I � 3 14"-3" WASHED GRAVEL � AND ON BOTH SIDES OF GREENHOUSE EFFECT AND ENCOURAGE GRASS TOO LATE IN THE SEASON TO ESTABLISH 75 PERCENT GRA55 COVER, OR IF THE WET SEASON u FILTER FENCE FABRIC STARTED EARLIER THAN NORMAL CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS BECAUSE THE RESULTING HIGH TEMPERATURES CAN KILL THE 2"XZ*:iS°;WOOD POSTS, GRASS. STANDARD, OR BETTER DUE TO RAPID RUNOFF CAUSED BY PLASTIC SHEETING, THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY CONCENTRATED RUNOFF. SUCH LINE FILTER MATERIAL IN WX12" AREAS INCLUDE STEEP AND/OR UNSTABLE SLOPES. TRENCH AND LEAVE MIN. 2" EXPOSED WHILE PLASTIC IS INEXPENSIVE TO PURCHASE, THE ADDED COST OF INSTALLATION, SILT FENCE MAINTENANCE, REMOVAL, AND DISPOSAL MAKE THIS AN EXPENSIVE MATERIAL, UP TO $1.50 -- I: TO$2 PER SQUARE YARD. - ' SCALE: NTS " WHENEVER PLASTIC 15 USED TO PROTECT SLOPES, WATER COLLECTION MEASURES MUST BE STOCKPILING SOIL NOTES INSTALLED AT THE BASE OF THE SLOPE. THESE MEASURES INCLUDE PLASTIC -COVERED BERMS, --- CHANNELS, AND PIPES USED TO COVEY CLEAN RAINWATER AWAY FROM BARE SOIL AND 1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DISTURBED AREAS. AT NO TIME 15 CLEAN RUNOFF FROM A PLASTIC COVERED SLOPE TO BE DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31. MIXED WITH DIRTY RUNOFF FROM A PROJECT. TEMPORARY EROSION AND SEDIMENTATION CONTROL NOTES. I.. APPROVAL~ OF THIS TEMPORARY EROSR)" AND IIEDIT4E14TATWN CONTROL (TESC).. PLAN DOES NOT CONSTSTIITE AND APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E,G, SIZE AND LOCATION OF ROARS, PIPES, RESTRICTORS,CHANNELS RE6 wnm FACRSL'IE'S„ UTILITIES, ETC.) 2. THE IMPLEMENTATION CIE THESE EROSION AND SEDIMENT CONTROL PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADIN6 OF THESE ESE:. FACILITIES IS THE RESPOW811 OF THE .APA'U ON OR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATIONILANDSCAPMG, 15 ESTABLISHED. 3. i IODATES OF THE RING LIMITS: SHOWN ON THE THIS PLAN SHA LL BE HEROU CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION, DURING THE CONSTRUCTION PERIOD, NO DISTURSANCE BEYOND THE CLEARING I.TMTTS $"AI,I,. BE. PERMITTED THE FLAGG1146 SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. 4. THE ESC FACIUTIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL,,CLEASUNCAND GRADING ACTIVITIES, AND IN SUCH A MANNER. AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM,. ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS. 5. THLE ESC FACILITIES SH04VN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR:.. ANTICIPATED SITE:CGNDITTONS- DURING THE CONSTRUCT ON PERIOD, THESE ESC PACTUTIES SHALL BE UPGRADED AS NEEDED FOR. UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT WAVE THE SITE',. 6. THE TESC: FACILITIES SHALL BE INSPECTED': DAILY BY THE APPUCANT/CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURETIIEIR CONTINUED FUNCTIONING. 7. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENT v, THAT WILL.. NOT BE DISTURBED FOR TWO DAYS DARING TOE WET SEASON OR SEVEN DAY DURING THE DRY SEASON SHALL BE IMMEDIATELY STABIU2ED WIT14 THE APPROVED TESC:METHODS (E.G. SEEDING, MULCHING, PLASTIC COVERING,, ETC,): B. THE ESC FACILITIES ON INACTIVE SITES SHALL. BE: INSPECTED AND :MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS: FOLLOWING A: STORM EVENT. 9. AT NO TIME SHALL: MORE THAN ONE (I) FOOT OF SEDIMENT BE ALLOWED TO. ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL, CATCH BASINS: AND CONVEYANCE LINES '.SHALL BE:CLEA1490 PRIOR TO PAVING, THE CLEANING OPERATION SHALL.. NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.. 10. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL, BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS WASH PADS, 14AY BE REQUIRED TO ENSURE THAT ALL. PAVED AREAS ARE XEPT CLEAN FOR THE DURATION OF THE PROJECT. CONSTRUCTION ENTRANCE NOTES 1. MATERIAL SHALL BE 4" TO 8" QUARRY SPALLS (4" TO 6" FOR RESIDENTIAL SINGLE FAMILY LOTS) AND MAY BE TOP DRESSED WITH I" TO 3" ROCK. 2. THE ROCK PAD SHALL. BE AT LEAST I2'THICKi6' MIN, FOR RESIDENTIAL SFR LOTS) :AND SD' LONG (20 MET FOIL SITES WITH LESS THAN I ACRE OF DISTURBED 510WS WIDTH SHALL BE THE FULL. LENGTH OF THE VEHICLE INGRESS AND EGRESS AREA, SMATTER PADS MAY BE APPROVED FOR SINGLE FAMILY;. RESIDENTIAL, AND SMALL:. COMMERCIAL SITES. 3. ADDITIONAL ROCK SHALL BE ADDED PERIODICALLY TO MAINTAIN PROPER FUNCTION OF THE PAD. 4. IF TH•••••E PAD DOES NOT ADEQUATELY REMOVETHE MUD.: FROM THE VEHICLE WHEELS, THE WHEELS THE VEHICLE SHALL BE HOSED OFF BEFORE THE VEHICLE ENTERS:A PAVED STREET, THE WASHING SHALL, BE DONE ON AN. AREA COVERED WITI CRUSHED ROCK A140 WASH WATER SHALL DRAIN TO ASEDIMENT RtTENTION FACILITY OR THROUGH A SILT FENCE. ' 2. IN3. i,, DRIVEWAYINSTALL OTHER USES FOR PLASTIC INCLUDE: IF THERE IS A ROADSIDE LINERa TEMPORARY DITCH LINER 3. TOPSOIL SHALL NOT BE PLACED WHILE INA FROZEN OR MUDDY CONDITION, WHEN DITCH PRESENT FOR BERMED TEMPORARY FUEL STORAGE AREA IF PLASTIC IS NOT REACTIVE TO OTHERWISE DETRIMEWALTO PROPER GRADING OR PROPOSED SODDING OR THE TYPE OF FUEL BEING STORED SEEDING. EMERGENCY SLOPE PROTECTION DURING HEAVY RAINS TEM PORARY DRAINPIPE (-ELEPHANT TRUNK') USED TO DIRECT PREVIOUSLY4. sGRADESON THE AREAS TO BE TOP SOIL-ED SHALL BE SLOPEDESIGN AND COVERATION SPECIFICATIONS INSTALLEDFOLLOWS:. APPROVEDINED ACCORDING TO THE PLASTIC ST BE RUN PLASTIC UP AND +SLOPE, iACROSS SLOPE . MAY BE INSTALLEDPERPENDICULAR TO SLOPE IF THE SLOPEI SANDBAG LF55 THAN 10 FEET WEIGHTS MINIMUM OF BANCH OVERLAP AT SEAMS ON LONG OR WTDE SLOPES, OR SLOPES SUBJECT TO WIND, ALL SEAMS SHOULD BE ROW SECURE TAPED PLACE PLASTIC INTO A SMALL (12-INCH WIDE BY 6-INCH DEEP) SLOT TRENCH AT THE TIRES AS A GRID TOP OF THE SLOPE AND BACKFILL WITH SOIL TO KEEP WATER FROM FLOWING UNDERNEATH 25' MIN LC vs, MIN, PROVIDE FULL WIDTH INGRESS/EGRESS AREA CONSTRUCTION ENTRANCE 3 w SCALE; NTS AND POUND A WOODEN STAKE THROUGH EACH TO HOLD THEM IN PLACE --" --- a INSPECT PLASTIC FOR IMPS, TEARS, AND OPEN SEAMS REGULARLY AND REPAIR IMMEDIATELY, THIS PREVENTS HIGH VELOCITY RUNOFF FROM COWTACTING BARE SOIL - "�'" """"6--• dP �� ""-iF'-�-" WHICH CAUSES EXTREME EROSION •-.- '"`. ',.,.- SANDBAGS MAY BE LOWERED INTO PLACE TIED TO ROPES. HOWEVER, ALL SANDBAGS - b MUST BE STAKED IN PLACE., • PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS. TRENCH TO CONVEY WATER TO'-- IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER APPROVED DISPOSAL POINT 99 SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE OF THE SLOPE IN ORDER TO ��- REDUCE THE VELOCITY OF RUNOFF. Know WhaVs below. MAINTENANCE STANDARDS PLASTIC COVERING DETAIL ''��+� 1� TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED 2 CcIll before you dig. • IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST NOTE: USE OLD TIRES, SANDBAGS OR SCALE: NTS BE COMPLETELY REMOVED AND REPLACED EQUIVALENT TO ANCHOR PLASTIC COVERING. WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED. [if z Cn L~ O LJ 1 0 I�z0 i = L- (� Q ¢ Q O z N 0 W O � 0 p U z zcnLIJ0- Q X U m X C�f cy-XLd D 0- SaT TITLE �TESC DETAILS m