23-102503-00City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: FISH
Project Address: 902 S 291ST ST
FILE
Electrical
Permit #:23-102503-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 515330 0170
Project Description: Electrical connection for gas to gas furnace change out and run electrical for 3-ton a/c
Owner
Applicant
Contractor
JAMES FISH
JAIMIE HOWBRENNAN HEATING & A/C
BRENNAN HEATING & A/C LLC
902 S 291ST ST
4601 S 134TH PL
(ELECTRICAL)
FEDERAL WAY WA
SEATTLE WA 98168
BRENNHA962DU (3/31/24)
98003-3700
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Is this an Online or O.T.C. application? ................. Yes
Electrical Fixtures
Circuits - Residential 2 Thermostat l
PERMIT EXPIRES Monday, 6 November, 2023
Permit Issued on Wednesday, May 10, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Wpsbin tan and the City of Federal Way.
ri
Owner or agent: N Date.
INE
CITY or
Federal Way
THIS CA.RD IS TO REA SIN ON -SITE
Construction Inspection Record
INSPECTION REQtESTS: (2_53) 835-30-50
Scheduled inspections mad- be failed if this card is not on -site- DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom)- Please schedule inspections as appropriate. Work must not be cap: Bred until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
0
UFER Ground (4295)
❑
Ditch cover (4030)
Q
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
BS
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
0
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
"]
Final - Electrical (4055)
Moved
..r
e__
B}
e
DatZ61
MECHANICAL
Q
liechanical Rough -in (4165)
❑
Gas Piping (4125)
0
-Final - ]lechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
El
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to corer
Approved
Approved
By
Date
By
Date
By
Date