23-102179-00City of Federal Way
Community Development Dept.
33325 8th Ave S '
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: MCCRACKEN
Project Address: 2610 SW 323RD ST
Electrical
Permit #:23-102179-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 873180 0980
Project Description: Installing 200-Amp UG meter,base and main breaker load center in place of existing.
Owner
Applicant
Contractor
RICHARD & MISTY MCCRACKEN
BRAD CROCCOELITE ELECTRIC INC
ELITE ELECTRIC INC (01)
2610 SW 323RD ST
2207 N INTER AVE SUITE D
ELITEEI055OF (9/6/23)
FEDERAL WAY WA 98023
PUYALLUP WA 98372
2207 INTER AVE UNIT D
PUYALLUP WA 98372
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Eledvw Fixtures
Alt. Serv./Feeder: 0 to 200 aml 1
PERMIT EXPIRES Saturday, 21 October, 2023
Permit Issued on Monday, April 24, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
WON nj thTN al Way.
Owner or agent: Date:
ciYr of '41�&
Federal Way
THIS CARD IS TO REALJI\ O\-SITE
Construction Inspection Record
I\SPECTION REQUESTS; (253) 83-5-3030
Scheduled inspections nta-: be failed if this card is not on -site. DO -NOT LOSE THE` CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work nnrst not be covered until it is approved. Check with your inspector if
you are tuisure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
UFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑ Temporary Power (4275)
❑ Service (4235)
By
Approved
Date
By
Approved
Date
BY
Approved
Date � �J
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
0
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
SS
Date
Final - Electrical (4055)
By
Approved
Date) '
Z
MECHANICAL
0
Mechanical Rough -in (4165)
0
Gas Piping (4125)
Q
Final -Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑ Plumbing Groundwork (4190)
❑ Rough Plumbing (4230)
❑ Final - Plumbing (4075)
Approved to cover
Approved
Approved
By Date
By Date
By Date