Loading...
23-102159-00City of Federal Way FILE33325 Community Development Dept. 8t h Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TRINITY GLASS INTERNATIONAL Project Address: 33615 1ST WAY S Project Description: Moving 2 circuits in IT room Electrical Permit #:23-102159-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 926504 0190 Owner Applicant Contractor TRINITY GLASS INTERNATIONAL, INC DANA MERRITTINFINITY CONSULTING INFINITY CONSULTING INC (EL 01) 33615 1ST WAY S INC INFINC1998PP (10/19/23) FEDERAL WAY WA 98003 2915 184TH AVE E 2915 184TH AVE E LAKE TAPPS WA 98390 LAKE TAPPS WA 98390 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Commercial 2 PERMIT EXPIRES Wednesday, 18 October, 2023 Permit Issued on Friday, April 21, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W iiJ g fend I f. ril-7 a�deral Way. Owner or agent: -" f' Date: r ; VVA7 As� CITY or Federal Way THIS CARD IS TO REAUUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections may be failed if this card is not on -.site. DO NOT LO$E THIS CARD. I spections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if ,ou are unsure about any of the inspections or the inspection segttence_ On -going inspections are lowed on the back of this card. ELECTRICAL ❑ L-FER Ground (4295) 0 Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete BV Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Sen-ice (4235) Approved Approved Approved By Date B} Date By Date El Feeders/Sub-panels (4045) 0 Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date El Final - Electrical (4055) Approved By Date ✓/ �j� MECHANICAL ❑ -Alechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ -Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date BY Date RV Date