Loading...
05-103922David Hoek 14 I Qtk Seattle, WA 98133 # This letter is in response to your inquiry about a modification request for the previously approved "North Shore Village" shopping center (Permit #00-103093-00-UP). At this time we understand that you wish to ilristryet the see*rti Wildint, *A -the site, as well zs reA*vate tke new building. (The entitlements were previously handled by a different applicant.) of Ir W so got Kr_ [164'. November 1, 2005 Page 2 On February 26, 200 1, a Use Process I approval was granted for the "North Shore Drive-Thru' Espresso" stand at this site. The Code requires 136 parking spaces for the project. The original approved plan provided 158 parking spaces. The espresso stand displaced 14 stalls, leaving 144 parking stalls for the existing and proposed buildings; this would meet the requirement of one stall per 300 square feet of gross floor area. Therefore, in regard to parking supply, the approval of the espresso stand does not impact the Use F11'rocess III approval and your current modification request. The Technical Inforination Report (TIR) and Transportation Impact Analysis (TIA) that were approved are still valid for the Use Process III modification, since you are simply proposing fagade changes. However, you may wish to check with Public Works Department staff about their subsequent review and the collection of fees. For questions on the TIR and civil drawings, you many contact Ann Dower at 253-835-2732 or ann.dower@cityoffederalway.com. If you have questions about the previously approved TIA, you may contact Sarady Long at 253-835-2743 or sarady.long@cltyoffederalway.com. - - - - I Y"171,71*11711, 0 T 0 517 Process III modification, we will need the following items to determine if the modification should be approved. (The number of required copies is in parentheses.) (1) Resubmittal Form a (2) Statement of the new architectural design intent, finish materials, and colors. 0 (1) A color board that shows the finish materials. 0 (2) Color renderings (either elevations, perspective, or three-dimensional drawing that shows the colors). 0 (8) Bound sets of drawings, to include a site plan, floor plans, and building elevations. Fold the plans to 8 V2by 11 inches. The maximum plan sheet size shall be 24 x 36 inches (but may be smaller). 0 Since the project has a value of more than $75,000 the architectural plans must be prepared by a certified ert ied architect or engineer. 0 Color site photographs from each compass point. (8Y2by 11 inch paper is acceptable.) it is not necessary to submit mailing labels and such for public notice since we are using the modification process. Also, for this Process III review it is not necessary to submit all of the technical sheets that would be required for building pen -nit, such as structural diagrams. Those will be required as part of the subsequent building permit. It is highly recommended that you get your Use Process Modification Approval prior to submitting the plans for a building permit. Sincerely, A lyt Andy Bergsagel Associate Planner enc: Resubmittal Form c: Grace Skidmore, Development Specialist Ann Dower, Public Works Development Engineering Sarady Long, Public Works Traffic Engineering 05-103922 DocI D 33840 LAKEHAVEN UTILITY DISTRICT 31627 1" Ave South - P.O. Box 4249 - Federal Way, Washington 98063-4249 Federal Way: 253-941-1516 - Tacoma: 253-927-2922 www.lakehaven.org lavid Hoek NSV Retail Management, LLC PO Box 77735 Seattle, Washington 98117 RE: Worthshore ®- Relocation WW gTW- Pr8I�I4•. 6106020 E 9 - Lakehaven has received all closing documentation satisfactory inspection of the referenced project Lakehaven Utility District standards for matedals water distribution system. Lakehaven hereby project for ownership, operation and maintenance. 0 4 Id 7nd has completed a for compliance with and construction of ally accepts this Leonard A Englund Charles I. Gibson Donald L.P. Miller Ronald E. Nowicki Commissioner Commissioner Commissioner Commissioner David Hoek NSV Retail Management, LLC. September 82010 Page 2 a positive b.lance, Lakehaven will authorize release of the Maintena Bond. In the event that the account has surplus funds, the surplus be refunded. 1 Please do not hesitate to contact John Jensen, if you have any ,Auestions. John may be reached by phone at (253) 946-5406, by electronic mail at jjensen@Lakehaven.org, or by fax at (253) 529-4081. Sinceroly,/\ John Bowman, P.E. Engineering Manager C. SKF&R it of Federal Way ec: Inspection Finance FieldOps SpecialServices RECEIVED CH Y OF FEDERAL WAY BUILDING DEPT City of Federal 1?ay 33325 8th Avenue S. PO Box 9718 Federal Way, WA 98063-971* This modification request is for permit # 00-103093-00, regarding parcel # 252103-9002. The permit was approved in 6/02 for the remodel of the exterior front signage fayade of the existing retail building and the construction of a new 11,776 sq. ft retail building. l'his modification request is to update the look of the merchant signage areas over the exterior front walkway of both the existing and the new building's previously approvoi design. Please find the enclosed 3-D renderings of the proposed new look over the old. so= Thank You Sincerely, David A. Hoe 3 k North Shore Village Shopping PL)�j SI'RICKER CA'FO MURNNT w ARCHITEC'FS, P.S. A Federal Way, Washington RECEIVED CITY OF FEDERAL WAY' BULDING DEPT. From: Ann Dower To: AndyBergoege| Date: 10/28/2005 1:41:57PM Subject: NorthmhmeVillage Up Andy, Since the preliminary T|Rfor NorthshoreVillage was reviewed and approved under the 1QS8KJngCounty Su�omeVVoterDesign yWanub|.they don�have hneubnnitanew one fora revsedland use approval. However, they will need to provide a complete, current TIR and engineered plans along with their permit application for the new building. They are required to bring the site up to current standards for water quality. Resource Stream Protection requirements outlined in the 1998 King County Surface Water Design Manual will apply.