Loading...
23-1020621 Mechanical City of Federal Way Permit #:23-102062-00-ME Community Development Dept. FILF 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CASTILLO Project Address: 811 SW 347TH PL Parcel Number: 132173 0080 Project Description: Heat Pump Installation Owner JOSEPH & LAUREN CASTILLO 811 SW 347TH PL FEDERAL WAY WA 98023 Applicant JULIE YUKHNONORTHWEST EXPERT HEATING LLC 1020 S 344TH ST SUITE 209 FEDERAL WAY WA 98003 NORTHWEST EXPERT HEATING LLC NORTHEH833DF (3/15/25) 1020 S 344TH ST SUITE 209 FEDERAL WAY WA 98003 Additional Permit Information Mechanical Work Valuation? .................................. 5000 - Is this an Online or O.T.C. application?.................. Yes Wg*xaical Fixtures Compressors / Heat Pumps 1 Furnaces PERMIT EXPIRES Sunday,15 October, 2023 Permit Issued on Tuesday, April 18, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ,Ma II1 t andth Ci 4 FFederal Way- 93g ijrf;� 1; t Owner or agent: Date: _�k - - -_ - curt OF Federal Way THIS C-RD IS TO REAL -UN O\-SITE Construction Inspection Record I\SPEC'TION REQUESTS: (253) 535-30-50 Scheduled inspections nii be failed if this card is not on -site. DO NOT LOSE THIS C''.iiD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work niust not be covered until it is approved. Check with your inspector if you are unsure about an-y- of the inspections or the inspection sequence. On -going inspections are logged on the back: of this card. ELECTRICAL El LEER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) Q Service (4235) Approved Approved Approved Bv Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cotter (4020) Approved Approved Approved Bv Date By Date 'By Date El Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test /��%%� Approved Bv Date B- Date . /Cj/ Date �v�7' PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date BV Date By Date CITY OF Building Division 33325 Eighth Avenue South Federal Wa Federal Way, Fax 98003-6325 4:�k�y Phone 253-835-2607 Fax 253-35-609 CORRECTION NOTICE ADDRESS: 0 A'71 / ""Jq � 01 ?�- PERMIT#: 2 )-�020(51 " a® �a,,,/LA r tum � m k otatA c �\\ �-n &-e ec!�% cfy4 IF YOU HAVE QUESTIONS CALL �) elt (253) 835- 7i WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) $ -3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DATE INSPECTOR DO NOT REMOVE THIS NOTICE Page of