RE: File #17-101422-00-UP; PROCESS I `DIRECTOR'S APPROVAL'
LTCA Building, 30850, 30854 & 31000 Pac. Hwy. S./31000 & 30905 18t'' Ave. S., Federal Way
Dear Mr_ Cantrell:
The Community Development Department has completed an administrative review of the LTCA project to
remodel an existing two-story, 20,543 sq. ft. building (the former "New Lumber and Hardware") and change
the use to limited manufacturing /production and office at the above -mentioned location. The applicant
submitted a building pen -nit on July 25, 2016, and on August 5, 2016 and April 4, 2017, City departments
requested additional information in order to process the building permit including a Process I site plan
required by Federal Way Revised Code (FWRC) 19.15.030(1).
A Master Land Use application requesting a Director's decision (Process I) for tenant and land use approvals
was submitted on March 31, 2017. The City requested additional infonmation on May 18, 2017, regarding
design and structural issues. Additional land use information was required to complete the application review
and the applicant resubmitted on May 11, 2017, May 19, 2017, May 22, 2017, and May 29, 2017.
After review of the requested information your application is hereby approved with conditions pursuant to
the conclusions and findings noted below by the Department's Planning Division.
CONCLUSIONS
Various sections of the zoning and development code indicate that certain developments, activities, or uses
are permitted only if approved using Process I — Director's Approval. Based on the findings below, the
proposed improvements to the developed site meet the following Process I approval criteria and land use
review thresholds of Federal Way Revised Code (FWRC) 19.15:030 and 19.55.020:
The proposed improvements are consistent with applicable chapters of FWRC Title 19 including, but not
limited to: Permits and Review Processes; Process I — Director's Approval; Community Design
Guidelines; and the Community Business (BC) zoning district.
The health, safety, and welfare of the citizens of the city are preserved.
The proposal is `minor new construction' exempt from SEPA review per the City's flexible thresholds; no
new gross floor area is proposed and the total number of added parking spaces will not exceed the
threshold exemption of up to 40 spaces.
Mr. T. Cantrell
.lone 9. 2017
Page 2
FINDINGS OF FACT
1. Proposal — The applicant proposes exterior facade changes, expose the barrel vault roof line created by
the ox bow trusses, outdoor storage, additional parking stalls and site improvements. The applicant
requests a permanent change of use from retail to manufacturing and production, limited (see Item
#3).The subject property consists of six existing parcels including a key -lot accessing 18"' Avenue South.
The proposal includes recladding the exterior to modernize the building, add storefront windows along
Pacific Highway, a new entry, updated canopies, perimeter fencing, pedestrian plaza, modified perimeter
landscaping, and a solid waste and recycling storage area located on tax parcels 785360-0146 and
785360-0145.
Existing Conditions — The project is a "non -conforming development" pursuant to FWRC 19.05.140, not
limited to landscaping, site improvements, and multi -family parking requirements. Per the applicant the
existing building was constructed before city incorporation under the jurisdiction of King County in
approximately the late 1940's or early 1950's. The parcels abutting Pacific Highway South contain the
primary building, parking and accessory structure. Parcel 785360-0140 that takes access from 18"'
Avenue S. contains a multi -family structure.
Change of Use — On October 20, 2015, the city provided a zoning verification to the applicant. On
November 23, 2015, the city approved a temporary change of use request to use the building as -is, for
storage of metal studs. As such, the City was required to review the proposal for compliance with use -
specific zoning provisions including, but not limited to, parking, setbacks, site improvements and surface
water quality improvements. Zoning compliance was performed as part of prior and this use process
review and meets zoning regulations as noted below.
The site was previously used by New Lumber & Hardware for retail sales, which is a permitted use per
FWRC 19.220.010. Manufacturing and production, limited will be located on the I" floor and associated
office space on the 2" d floor. The City determines that limited steel assembly and storage is an allowed use
in the BC zone.
4. Comprehensive Plan & Zoning Designation — The zoning district and Federal Way Comprehensive
Plan designation is Community Business (BC). The property's proposed manufacturing and production,
limited and office uses are a permitted use pursuant to Federal Way Revised Code (FWRC) 19.230.010.
The change of use is approved on the grounds that the activities proposed by the applicant are limited
manufacturing and production as defined in FWRC 19.05.130(2), and not general manufacturing and
production, which is a more intensive use of the subject property.
5. Environmental Review — The proposed improvements are exempt from environmental review. No new
buildings, additional gross floor area or parking stalls exceeding 40 spaces are proposed. Therefore, the
improvements are consistent with the State Environmental Policy Act (SEPA) definition of "minor new
construction" as adopted in the city's flexible threshold exemptions in FWRC 14.15.030(1)(c).
6. Height and Setbacks — The finished grade on the subject property is relatively flat. The height of the
building is approximately 29.5 feet above average building elevation. The height of the structure is below
the 35-foot height maximum in the subject zone. Further, the proposal does not propose additional gross
floor area and therefore does not trigger FWRC 19.30.090, requiring any non -conforming side and rear
yard setbacks to be brought into conformance.
17-101422-00-UP Doc, LD. 75899
Mr. T. Cantrell
June 9. 2017
Page 3
7. Parking — FWRC 19.220.010 requires 1 parking stall for each 1,000 square feet of gross floor area of
manufacturing and production, limited. FWRC 19.220.010 requires 1 parking stall per 300 square feet of
office gross floor area. The proposed building is 20,543 square feet, and therefore 40 parking stalls are
required. The applicant depicts 44 parking stalls including 5 compact stalls (13%) and complies with
FWRC 19.130.170. The proposed parking meets the parking requirements needed for the proposed
change of use to limited steel stud manufacturing, production and assembly, and an office use.
As a condition of approval, the applicant shall remove 4 spaces. A SEPA threshold determination and
checklist would be required for proposals exceeding 40 spaces. Please see the redlined site plan enclosed.
8. Tenant Spaces — The plans depict vacant tenant spaces. The applicant states that their utilization is
undetermined at this time. The applicant must submit a change of use request if the land use changes from
one use category in the zoning chart to another use category (FWRC 19.15.025). Any new use shall
comply with those development standards of the use zoning chart that directly relate to the new use (i.e.
parking, solid waste requirements).
9. Landscaping — The applicant proposes Type III 5-ft landscape buffers on tax parcels 785360-0226 and
785360-0220 on the western and northern property lines. Type III landscaping requires a mixture of
evergreen and deciduous trees, large shrubs, and ground cover. Lauchlin R. Bethune Associates, Inc.
submitted a landscape modification per correspondence per FWRC 19.125.100 requesting to eliminate the
shrub layer and install only deciduous trees and ground cover due to site security issues including
trespass. The proposed modification will make the subject property more conforming, does not request a
width reduction and is necessary due to special site, circumstances including accommodating additional
required parking. The location and surroundings include a nonconforming O-ft setback of the subject
property (without windows/egresses) and therefore requires less intensive screening from parked vehicles
and head -lights.
The city hereby approves the requested landscape modification as it meets FWRC 19.125.100.2(a)-(e)
modification criteria. Please see South King Fire and Rescue's evaluation regarding proposed landscaping
under item #12.
As a condition of approval, the applicant shall remove the cobble rock proposed as ground cover and
replace with low -profile drought resistant living ground cover.
10. Community Design Guidelines — The proposed limited manufacturing and accessory office use
complies with the provisions of FWRC Chapter 19.115, "Community Design Guidelines" that are
reasonably related and applicable to the area of development as detailed below.
a. Building Design — The building primary entrance is located on the north fagade and clearly visible
from the right-of-way. Landscaping, a walkway, and a pedestrian plaza help define the main entry.
Methods of articulation and accessory elements are incorporated in the overall architectural design.
Windows along the north and east fagade and variation in materials (i.e. hardie reveal siding) and
color are used to articulate blank walls.
The building facades are both longer than 60 feet and visible from a right-of-way. The proposal
includes canopies, a pedestrian plaza and new entryways. The pedestrian plaza is clearly visible,
accessible from the adjacent right-of-way, and exceeds 200 sq. ft.
Doc, LD 75899
I7-101422-00-UP
Mr. T. Cantrell
.June 9. 2017
Page 4
As a condition of approval, the applicant shall apply for separate building permits for canopies
depicted on the southern and northern building fagades. The canopies shall cover at least 50% of the
fagade visible from the right-of-way and nearby residential use.
b. Pedestrian Circulation — A pedestrian connection is incorporated from the building entrance to public
sidewalk.
c. District Guidelines — The principal entrance fagade is clearly recognizable from Pacific Hwy South
and incorporates treatments including transparent glass, structural modulation, and roof variation.
11. Solid Waste and Recycling — The proposal contains a solid waste and recycling storage area of 1050
square feet and meets the general commercial storage requirements of FWRC 19.125.150(3) and (7).
12. Fire Protection — The applicant shall remove the proposed perimeter landscape buffer along the southern
property line for fire truck access. Please see enclosed memo from South King Fire & Rescue. These
comments are informational and need to be addressed at the time of building permit review.
As a condition of approval, the landscape buffer along the southern property line shall be removed for
emergency access; see redlined plans.
13. Stormwater Requirements — Please see the enclosed memo from the Public Works Development
Services Division. These comments are information and if triggered shall be addressed prior to building
permit issuance.
CONDITIONS
1. The building permit site plan shall be revised to remove the 5-foot landscape buffer on the southern
property line for the fire lane.
2. The applicant shall remove 4 parking spaces.
3. The applicant shall remove the cobble rock proposed as ground cover and replace with low -profile
drought resistant living ground cover.
4. The applicant shall apply for separate building permits for canopies depicted on the southern and northern
building fagades. The canopies shall cover at least 50% of the fagade visible from the right-of-way and
nearby residential use.
5. The applicant shall schedule a final planning inspection. To schedule an inspection please contact 253-
835-2644 or253-835-2643.
BUILDING PERMIT ISSUANCE REQUIRED
Project approval does not grant license to begin any type of site work. The city is reviewing the building
permit (File #16-103606-00-CO) associated with the exterior and interior work, parking lot striping,
landscaping, and fencing. Please contact the permit center at 253-835-2607 or
permitcenter@cityoffederalway.com, if you have any questions regarding your building permit.
17-101422-00-UP Doe. I,D 75899
Mr. T. Cantrell
June 9. 2017
Page 5
APPROVAL DURATION
Unless modified or appealed, the Process I decision is valid for one year from the date of issuance of the
decision. A one-year time extension to the decision may be requested before the lapse of approval following
the provisions listed in FWRC 19.15.110. The improvements must be substantially completed within the one-
year time period or the land use decision becomes void.
APPEALS
The effective date of this decision is June 12, 2017, or three days from the date of this letter. Pursuant to
FWRC 19.55.050, any person who received notice of the administrative decision may appeal this decision to
the Federal Way Hearing Examiner within 14 calendar days by June 26, 2017.
However, because you are the only party of record and the city is in receipt of a written request dated May 29,
2017, to waive the appeal period, your appeal period is waived. Waiver of the right to appeal does not affect
the effective date of this decision.
CLOSING
Any questions or concerns regarding this decision can be forwarded to Associate Planner Leila Willoughby -
Oakes at 253-835-2644, or Ieila.willou hbv-oakes c ilyoffederalwa .com.
Sincerely,
Brian Davis
Director of Community Development
enc: Approved Site Plan, Elevations and Details (Redlined) c: Leila Willoughby -Oakes, Associate Planner
Public Works Development Services Memo Robert `Doc' Hansen, Planning Manager
South King Fire Memo Kevin Peterson, Engineering Plans Reviewer
Change of Use Application Chris Cahan, South King Fire and Rescue
Brian Asbury, Lakehaven Water & Sewer District
Peter Lawrence, Plans Examiner
LaLlehl In Bethune, ASLA, Emailed: leuch tr±bethuneassociates.com
17-101422-00-UP Doc I D 75S99
May 29, 2017
Dear Leila —
As the only party of record, I hereby waive the required appeal period for Use
Process #17-101422.
Thank You,
❑m antr���
RECEIVED
Lakehaven ��Y
WATER & SEWER DISTRICT 0 9 2017
ITY
WATER CE R
CAMMMUNITY FEDERAL
DEVELOPMENT
Lakehaven Water & Sewer District - Development Engineering Section
31623 - 1st Ave S * PO Box 4249 * Federal Way, WA 98063-4249
Telephone: 253-945-1581 or 253-945-1580 * Email: DE@Lakehaven.org
This certificate is intended to provide the applicant, land use agencies &/or public health departments with
information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole
discretion, reserves the right to delay, or deny, water service based upon capacity &/or supply limitations
in Lakehaven's or Other Purveyor's system facilities.
Proposed Land Use: ❑ Building Permit-SFR ❑ Building Permit-MFR ® Building Permit -Other
❑ Subdivision ❑ Short Subdivision ❑ Binding Site Plan
❑ Rezone ® Boundary Line Adjustment
❑ Other (specify/describe)
Tax Parcel Number(s): 2 2104- G4 -9Q48, -9,053 Site Address: 52X Pacirig HwY_SLakehaven GIS Grid: 1-13
Ex. Bldg. Area to Remain: A sf New Bldg. Area Proposed: 108,476+/- sf
Applicant's Name: Yauncisprina LLC
WATER SYSTEM iNFORMATTtiiV
1. ❑ Water service can be provided by service connection to an existing " diameter water main that is approximately
feet from the site.
2. ® Water service for the site will require an improvement to Lakehaven's water distribution system of:
® a. 5+ - feet of 8" &/or 12" diameter water main to reach the site; and/or
® b. The construction of a water distribution system on the site; and/or
❑ c. A major portion of Lakehaven's comprehensive water system plan would need to be implemented and/or
constructed; and/or
® d. Other (describe): Lakehaven Developer Extel3sion Agreement mnuired. Extend to Far edge fNE corner
Lakehaven policy..
3. ® a. The existing water system is in conformance with Lakehaven's Comprehensive Water System Plan.
❑ b. The existing water system is not in conformance with Lakehaven's Comprehensive Water System Plan and an
Amendment to this Plan will be required. This may cause a delay in issuance of land use approvals or permits.
4. ® a. The subject property is within the corporate limits of Lakehaven Water & Sewer District, or has been granted
Boundary Review Board approval for extension of water service outside of Lakehaven's water service area.
❑ b. Annexation or Boundary Review Board approval will be necessary to provide service.
S. Water service is subject to:
® a. Payment of connection charges (to be determined by Lakehaven);
® b. Proof or reservation of easement(s) as required by Lakehaven;
® c. Other: Active CIA project(Pacificw Phasework Must accepted bLakehaven.ri r ❑commencingDE
Agreement indicated in #2 abQ .
Comments/special conditions: C a nue' 'or d w r sewer s s e
acilities r assoc!gted oa5ements.on -the site. ServiCe nressure_pLqLter_Jhan BO usl Indicated, Pressure Rgduclng V
indicated. contact local buildina official for reQuirements &lQr add itiona 'nfarma i n,
The nearest fire hydrant is approximately 5+ - feet from the Property (as shown on map on the back of this page).
System hydraulic model results (FF #139), at no less than 20 psi, indicate that Lakehaven's standard maximum allowable liquid
velocity of 10 ft/s is exceeded at a fire flow rate above 1.300 GPM (approximate). This flow figure depicts the theoretical
performance of the water distribution system under high demand conditions. Fire flow rates greater than this may be accommodated
through water distribution system improvements, contact Lakehaven for additional information.
450 Pressure Zone Est. Meter Elevations)-GIS: 236+/- Est. Pressure Range at Meter(s) (psi): Min. 90, Max. 93
I hereby certify that the above water system information is true. This certification shall be valid for one (1) year from the date of
signature.
Name: BRIAN ASBURY Title: DEVELOPMENT ENGINE G S P VI R
Signature: / Date:
I � 22 1(a
4 049053.docx 10 18 16 Page 1 of 2
Youngspring LLC wtr 2921049046 29210490 ��9 ( / / )
aTE: Lakehaven Water and sewer Water Certificate ofAvailability
tiistricf neither v�aoar guaranties parcels 2921049046, 2921048049, 2921049053
the aCCa��L']t Of any rry b faci{itjl Inforlrl3tiLtri 0 199 �A
provided. Facility locations and conditions
are suhgeettofiield verification. F"i 11/22/2016 BIA
Youngspring LLC wtr 2921049046 2921049048 2921049053.docx (10118/16) Page 2 of 2
RECEIVED
MAY 0 9 2017
Lakehaven CITY NIFY � EML WAy
WATER & SEWER DISTRICT EV> LOpMENT
SEWS
Lakehaven Water & Sewer District - Development Engineering Section
31623 - 1st Ave S * PO Box 4249 * Federal Way, WA 98063-4249
Telephone: 253-945-1581 or 253-945-1580 * Email: DE@Lakehaven.org
This certificate is intended to provide the applicant, land use agencies &/or public health departments with
information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole
discretion, reserves the right to delay, or deny, sewer service based upon capacity &/or supply limitations
in Lakehaven's or Other Purveyor's system facilities.
Proposed Land Use: ❑ Building Permit-SFR ❑ Building Permit-MFR ® Building Permit -Other
❑ Subdivision ❑ Short Subdivision ❑ Binding Site Plan
❑ Rezone ® Boundary Line Adjustment
❑ Other (specify/describe)
Tax Parcel Number(s): 292 04-9046 -9048 -9 3 Site Address: 352XX Pacific- S Lakehaven GIS Grid: 1-13
Ex. Bldg. Area to Remain: N/A sf New Bldg. Area Proposed: 108.476+1f
Applicant's Name: Youngsoring LLC
SEWER SYSTEM INFORMATION
1. ® Sewer service can be provided by service connection to an existing 8" or IQ' diameter sewer main that is on the site and
the sewer system has the capacity to serve the proposed land use.
2. ❑ If new buildings to remain as -proposed, sewer service for the site will require an improvement to Lakehaven's sanitary
sewer system of:
❑ a. feet of " diameter sewer main or trunk to reach the site; and/or
® b. The construction of a sanitary sewer collection system on the site; and/or
❑ c. A major portion of Lakehaven's comprehensive wastewater system plan would need to be implemented and/or
constructed; and/or
® d. Other (describe): Lakehaven Developer Extension ree a it d.
3. ® a. The existing sewer system is in conformance with Lakehaven's Comprehensive Wastewater System Plan.
❑ b. The existing sewer system is not In conformance with Lakehaven's Comprehensive Wastewater System Plan and an
Amendment to this Plan will be required. This may cause a delay in Issuance of land use approvals or :)crmits.
4. ® a. The proposed site land use is within the corporate limits of Lakehaven Water & Sewer District, or has been granted
Boundary Review Board approval for extension of sewer service outside of Lakehaven's sewer service area.
❑ b. Annexation or Boundary Review Board approval will be necessary to provide service.
S. Sewer service is subject to:
® a. Payment of connection charges (to be determined by Lakehaven);
® b. Proof or reservation of easement(s) as required by Lakehaven;
❑ c. Other
Comments/special conditions: CaCc shalle k n tg avoid encroachm?,nLupon exiosed water & r sewer system
facilities. &/or associated easements, on the site.
I hereby certify that the above sewer system information Is true. This certification shall be valid for one (1) year from the date of
signature.
Name: BRIANASNVIR Title: DEVELOPMENT ENGINEERING SUPERVISOO
Signature: LL Date: -
Youngspring LLC swr 2921049046 2921049048 2921049053.docx (10/18/16) Page 1 of 2
2021 49027
26
r
' 2021049148 2021049059
2021049047 35100 1351 202104911
35109 35053
oo
f
f
f
f
f
f
f
1853180010 0
N7
10
6" Service Stub
s
A.
2921049159
$' t 35210
r
2921049049
1220
r �
d �
a.
2921049125 2921049159
35400
356 TH T 2921049002
pC 1200
ti
292
454
TE, Lakehaven water and 5e+ner Sewer Certificate ofAvailabilitl
District; neither verrants nor guarantees Parcels 2921049046, 2921049049, 2921049053
She accuracy of any facility information a aVa 211fl
proAded. Facility locations and conc#tians
are subject tofield verificaton. Feel 11/22/2016 BIA
Youngspring LLC swr 2921049046 2921049048 2921049053.docx (10/18/16) Page 2 of 2
A�k
CITY OFF
Federal Way
DATE: April 10, 2017
TO: Leila Willoughby -Oakes
FROM: Kevin Peterson
SUBJECT: L T C A, LLC - (17-101422-00-UP)
30854 PACIFIC HWY S
Leila,
MEMORANDUM
Public Works Department
It doesn't appear this project will trigger any type of drainage review, however, I'd like to make sure that
the applicant is aware of the thresholds that would require drainage review, should the scope of the
project expand -
Per the 2016 King County Surface Water Design Manual (KCSWDM):
Drainage Review is required for any proposed project, including a redevelopment project, that meets one
or more of the following criteria:
➢ The project will result in 2,000 square feet or more of new impervious surface, replaced
impervious surface, or new plus replaced impervious surface..., OR
➢ The project will result in 7,000 square feet or more of land disturbing activity
Per Federal Way Revised Code (FWRC) Section 19.30.120:
➢ If the project adds or replaces 5,000 square feet or more of an impervious surface, then the
entire site would have to be brought into conformance with current water quality treatment
standards
"�kCITY OF
Federal Way
April 4, 2017
Mr. Michael Hovland
Hovland Architects
900 Meridian Avenue East, Suite 408
Milton, WA 98354
FILE
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www, cityoffederalway.com
Jim Ferrell, Mayor
Emailed: architect.snehnawl.com
Re: File #16-103606-00-CO; PLANNING & BUILDING LETTER #2
L.T.C.A, LLC Remodel; Parcels 785360-0220, 785360-0226 & 785360-0145
30850, 30854 & 31000 Pacific Hwy S/31000 & 30905 18"' Ave S, Federal Way
Dear Mr. Hovland:
The city is in receipt of your March 15, 2017, building permit resubmittal. Plans received for a proposal at the
above -mentioned address require a land use review pursuant to Federal YVay Revised Code (FWRC)
19.15.030 and City correspondence sent November 23, 2015 and August 5, 2016. A review of the materials
indicates the following items must be addressed before approval of the building permit.
TECHNICAL REVIEW
Planning Division — Leila Willoughby -Oakes, lcila.willot242liby-oakesna..citvoffederaii),ay.cont, 253-835-2644
• Use Process 1 Required - Please submit a Use Process I and Master Land Use Application and
associated submittal requirements. Staff previously forwarded a Use Process I guidance checklist;
another copy is enclosed for your use. The proposal is not exempt from land use review as the
proposal includes site work, building facade improvements, parking lot modifications, landscaping,
and a garbage enclosure.
Building Division — Peter Lawrence, Peter. Law rerice, r eitvoffederalii,.ty.com, 253-835-2621
The following comments are based on the 2°d resubmitted plans. I am unable to complete the plan review
of the above -referenced project until I receive additional information regarding, but not limited to, the
following:
I have classified the spaces within this building. The unheated shop area will be classified as "F-
2" occupancy. The unheated storage shall be classified as "S-2" occupancy and the business
portion of this will be classified as "B" occupancy. The required separation of S-2 and `'B"
occupancy shall be 2 hours for a non-sprinklered building per table 508.4. There is no separation
between the S-2 and the F-2 occupancies. Please revise your plans and provide the UL listed
assembly for the 2-hour fire barrier between the S-2 and B occupancy.
2. On page CS1.0 note number 8 states that firestopping details will be submitted to the building
inspector on site. This is unacceptable. All penetrations in all fire resistive assemblies shall be
included in the plan sets in their entirety. The penetrations shall be protected by UL Listed
Mr. Hovland
April 4. 2017
Page 2 ol'4
assemblies and all through penetrations and membrane penetrations must be identified as to the
type of material that is penetrating the assembly and how that material is protected. Please revise
your plans and show how all pipes, vents, cables, conduits, wires, and openings are protected by
the UL listed assembly.
When providing the UL listed assemblies please provide the entire listed assembly. When a
listing requires mineral fiber the designer cannot arbitrarily swap out mineral fiber for batt
insulation. The UL listed assemblies are specific in nature and some of them are proprietary in
nature. Mineral fiber is defined as slag wool or rock wool. Please revise your plans and provide
the UL listed assemblies as provided by either the GA manual, the UL Fire Resistive Design
manual or some other approved resources (see wall types # 13 on page A2.1).
4. Wall type #11 on page A2.1 lists GA -File NO. 1058. 1 cannot find a wall design listed as WP
1058.
It is important that the designer provide the listed assembly in its entirety. Fire resistive designs
must include all of the components of the listed assembly. On the drawings, provide details
showing all construction variations encountered at the top of fire rated walls, such as deflection
tracks, perpendicular joists or beams, parallel joists or beams, duct/pipe/conduit penetrations, etc.
Provide detailing showing each and every construction feature needed to maintain the fire rating
of the wall at each construction variation. Identify each approved fire -rated assembly by listing
agency and assembly number. Include written and pictographic representations of each fire -rated
assembly. Please provide the UL listed assemblies at the joints installed in or between fire -
resistive rated walls that are listed for that application (head of wall, bottom track to floor).
6. The resubmitted plans still show a separate tenant space and it is referred to on page P2.1 as
future tenant. This was addressed on the first comment letter dated 8/26/16. Will this be a
separate tenant space and if not what is this spaced used for? If this is for a future tenant is it your
intention to make this a white shell space? This will require a separate permit from the permit.
Please clarify this concern and if separate tenant spaces then apply for this space on a separate
permit.
7. Please revise your plans and provide complete framing and structural details for the new canopies
on the exterior of the building. Please have the FOR evaluate the connection methods.
On page A3.2 there is a detail showing a new parapet wall (see detail 3 on page A3.2), yet there is
not shown an_v attachment method of the parapet to structure. Please provide all attachment
methods for all framing members. There can be no guess work on the part of the contractor or the
inspectors.
9. Room 228 is listed as an unheated attic yet there's a unit heater installed in that space. Will this
space now become a semi -heated space? If the room is semi -heated then demonstrate compliance
with the 2015 WSEC for semi -heated spaces.
10. The building application states that mechanical system will be a deferred submittal. I will not
review the mechanical portion of this project unless the applicant states that the mechanical
system will be part of this submittal. The mechanical fees can be paid for prior to permit issuance.
I want to provide the designer with some information that will be helpful when the mechanical
portion is submitted for review as follows:
lo-103606-00-CO Doc I D 75o'_I
Mr. Hovland
April 4. 2017
Page 3 of4
a. Any mechanical equipment that utilizes the floor or the roof system for support shall be
evaluated by the FOR for the weight imposed on the structure.
b. The mechanical engineer is using the 2015 UPC chapter 12 for the gas piping. The State
of Washington has not adopted chapter 12 of the 2015 UPC, instead we have adopted the
2015 International Fuel and Gas code. Please have the mechanical engineer refer to that
code and provide a code compliant gas riser diagram. i have calculated the BTU's of the
unit heaters at a total of 525 MBH. The developed length of pipe is 117 ft. According to
table 402.4(1) a develop length of 1 17 ft. running 525 MBH would require at minimum a
2" schedule 40 metallic pipe. Please have the mechanical engineer use table 402.4(1) of
the 2015 IFGC.
c. If all thread and unistruts are used to support mechanical equipment please make sure that
the details are provided as to how all threads are attached to the existing wood conditions.
11. The special inspection forms were not included in this resubmittal. Please complete the special
inspection forms and return those with your next submittal.
12. On page S5.0 detail 6 needs some clarification from the EOR. The note on that detail states that if
the CMU blocks are solid grouted then please notify the engineer of record. The CMU blocks
would have to be fully grouted for the FOR to use an epoxied all thread for a connection method
of the new ledger. Please have the FOR verify that the blocks are fully grouted. The other
concern is the LTT19 tension tie requires either a'/2" —'/4" anchor bolt. I'm assuming that the
FOR was intending on using the 5/8" epoxied all thread to be used where the LTT19 were to be
installed. The flange of the U210 will not allow the LTTi 9 to be installed as shown. Can an
inverted hanger be used and if the all thread does not line up with the installation of the LTT19
then can a''/2" epoxied all thread be used in that position? Please clarify these concerns.
13. The specifications of the platform lift were included in the resubmitted materials. On page 18 of
the installation manual the base attachment must be installed on a level concrete surface rated at
3500 psi. is the floor rated at 3500 psi at that location? Please address this concern.
14. The lift manual that was part of the second resubmittal does not show detailed attachment
methods. The manufacturer's specifications must be on site for the inspector and must show in
detail the attachment methods and specifications. Please have the FOR evaluate the supporting
structure to make sure that it is adequate for the attachment of the mast to structure.
15. On page P3.2 the hot water piping from the water heater is only allowed a maximum length of 21
feet per table C404.3. I of the 2015 WSEC, unless another water heater is installed or a
recirculating pump is installed on the water heater. Please address this concern.
16. Will there be racks over 5'9" installed in this building? If racks over 5-9" are installed then a
separate permit with engineering is required.
17. There were no construction details for the trash enclosure included in this resubmittal. Is it the
designer's intention to apply for a separate permit for this enclosure? Please address this concern.
18. Will the new gate and fence installed in the parking lot be over 7ft tall?
19. The gypsum ceiling has no framing details as to how sheetrock will be attached. Please clarify
how the new gypsum ceilings will be built. This was an oversight on my part and not picked up
on the first comment letter.
16-I 03,606-00-CO Doe I D 75621
Mr. Hovland
April 4. 2017
Paae 4 of 4
20. South King Fire and Rescue is requiring a Knox box to be placed at the exterior of the building.
The minimum width of the new gate shall be 20ft in the open position.
The purpose of this plan review is to verify code compliance, to the extent possible and reasonable, given
the information provided on the plans and the city's plan review resources and capabilities. In no way
does any city approval constitute a guarantee of code compliance; authorize any work in violation of any
applicable codes; or relieve the owner of responsibility for complying with pertinent codes and
ordinances.
Provide 3 sets of the corrected drawings; and complete the enclosed resubmittal form. Revised or
resubmitted plans shall be provided in the same format, size, and amount as the originally submitted
plans. Revised/resubmitted drawings shall indicate by means of clouding or written response, what
changes have been made from the original drawings. Please include my comment letter with your written
responses with your resubmittal. Plans requiring engineering must be stamped by the engineer and be
accompanied by two copies of the engineer's calculations. Building will review the resubmittal as
expediently as possible.
CLOSING
Planning will conduct a comprehensive zoning and development code review on the receipt of a complete
Use Process I application. Should you have any questions regarding this letter, please contact me at 253-
835-2f44, or lei la.wiIloughbv-oakes rc.citveiflederalway.com.
Sincerely,
�f
Leila Willoughby -Oakes
Associate Planner
enc: Resubmittal Form
Master land Use Application
Submittal Requirements for Process i
Boundary Line Adjustment Checklist (Future Submittal)
Planning Letter (File No 15-105403-00-AD)
c: Peter Lawrence. Plans Examiner
Chris Cahan. South King Fire & Rescue
Brian Asburv. Lakehaven Water & SeN-ver District
Tom Cantrell. Metier Construction inc.. Emailed: look-rl nletieremnstrLiciJun.eom (Owner)
Lauchlin R. Bethune. ASLA- PO Box 1442. Maple Valley- WA 98038: Finailed: huich.-dbeihtizteassneiates.corn
16-I0',0 -00-CO Doe 1 U 7j621
1e
OU 7853600210
ry - 31008
LakehaMDIMICT
7853600240
7853600125
U
0
.
30800
G
1651
U
s" PVC
Q
7853600235
r
T8
3
0 15
30800
0
2
n
7853600130
"
30823
r
8" nr 4
Its nr
"
XT
S38HC
�
7853600230
�
30820
❑
Q
78310{I105I
Q
7853600215 7853600150 785 60 096
1626 1648 7853600151 9 6
30915
8"AC n
oa
7853 0[08
7853600212 7853600157 31 0
31000 7853600155 7853600156
1631 1639 31003 U
a
co
7853600200 7853600160 78 36
31014 31000 1
NOTE: Lakehaven Water and Sewer LTCA, LLC Remodel N
District neither warrants nor guarantees
the accuracy of any facility information 17-101422-00-UP
provided. Facility locations and conditions 0 100 200
are subject to field verification. Feet 4/6/2017 BIA
Id
41k
CITY 4�
OF
Federal Way
DEPARTMENTOFCommuNrrY DEVELOPMENT SERVICES
33325 8* Avenue South
Federal Way, WA 98003-6325
253-835-2607;Fax 253-835-2609
RECEIVED www.cilyoffcdcM1wa ,co
MAR 3 0 2017
WAy
Crime Prevefiffi t�` ro h Environmental
Design (OPTED) Checklist
Directions
Please fill out the checklist to indicate which strategies have been used to implement CPTED principles in
your proposed project. Please check all strategies that are applicable to your project for each of the
numbered guidelines. You may check more than one strategy for each guideline.
Your responses will be evaluated by City Staff, and will be integrated into the Site Plan and/or Building
Permit review process.
1.1 Blind Corners f4 i �x.
Avoid blind corners in pathways and parking lots. '
barriers
Pathways should be direct. All along pathways should
be permeable (see through) including landscaping, fencing etc.
Consider the installation of mirrors to allow users to see ahead13
u�a.;t:,;'•=`�;
of them and around comers. 6
Other strategy used-
Fig :k�, ••�.:
.err.' "fr'+�f •y„
r :,
1.2 Site and Building Layout^L
Allow natural observation from the street to the use, from the
, -- r ,� ; •. • : •. n
use to the street, and between uses
a�;iraaa.
Bulletin #022 — January 1, 2011 Page 1 of 9 k.-\Handouts\CP?ED Checklist
IF
B T ,#;.•,PBW1l,'Ci8Afa1�.'-�'1'if.,,,5' .,r: r :1sf#Alt.,ftl
TV4116 M.. IRC0. 'Mod
i w• �' yk'�+i.• �d.-;ram c�•V:
>. •,�� •vi ,,{{,y,,,bjlNalitl, ��l�i�t •`- �'';�.:r •i:r. aY: k.... � .
Orient the main entrance towards the street or both streets on
For Non -Single corners. ■ tti
Family
Development $,
... ;
Position habitable rooms with windows at the front of the ,
dwelling. ■
Access to dwellings or other uses above commercial/ retail
development should not be from the rear of the building. ■
Offset windows, doorways and balconies to allow for natural
pbservation while protecting privacy. ■
Locate main entrances/exits at the front of the site and in view
of the street. ■
For Commercial/
Retail/ Industrial If employee entrances must be separated from the main
and Community ❑ entrance, they should maximize opportunities for natural
Facilities surveillance from the street. ■
h/ In industrial developments, administration/offices should be
located at the front of the building. ■
/ Avoid large expanses of parking. Where large expanses of
For Surface [� parking are proposed, provide surveillance such as security
Parking and cameras. ■
Parking
Structures Access to elevators, stairwells and pedestrian pathways should
be clearly visible from an adjacent parking area. st
❑ Avoid hidden recesses. ■
�I.ocate parking areas in locations that can be observed by
adjoining uses, w
en spaces shall be clearly designated and situated at
For Common/ locations that are easily observed by people. Parks, plazas,
Open Space common areas, and playgrounds should be placed in the front
Areas of buildings. Shopping centers and other similar uses should
face streets. rt
Other strategy used:
13
Bulletin #022 —January 1, 2011 Page 2 of 9 kMandouts%CPTED Checklist
13
IA
1.5
31iti�f �` `dies L s.'' P..:.1 `. ��t': �t1}rt AtHuji iSQ =:}
fi,-. c•rT T r: i �' -:.r ; ': TY!,y'r
h: 1,..� f f .•'V". i6•�: _ y + 5i'}•�Y� it ,see ,� �• •,.' -.:-, `s' I ss 3. � 1 yl `• fff°' r •S=d1 . a•„ 1� ' 7 ?� •A{ r�Y"�y /..• .•,.
J�y�1 T.•k i�� if�� , }[�•'• ,� ,; 'r� � ry�y+f �yr.•��.� r. [}�f i' �y°=����' fa'•, +:ti.f ::. ::...��i i
J'r ^fir �S�a7 .S 1� i�T t: � E� � .� .>• •'�e. , i
�� L• f ,?if!'H . •�-�N, `�� ..'D. `CW! er�,Y�•1S: = � 17,,V�p '; � c'v: 1 v" i:� r 7•• y.,j
Common/Open Space Areas and Public On -Site Open
Space
Provide natural surveillance for commonlopen space areas. �► "' ' 's
Position active uses or habitable rooms with windows adjacent _ .- _, R•
to main common/open space areas, e.g. playgrounds,
swimming pools, etc., and public on -site open space. ■
r ,�rh�S�i`"t• �,_
M/Design and locate dumpster enclosures in a manner which
screens refuse containers but avoids providing opportunities to ; ;,•, .�.+- .:- ; :- .:,• y
hide. ■
Locate waiting areas and external entries to elevators/stairwells •�'s• �` = x;,•:'a f`,>'' k' '�'�`'
o`"�Fsf;�yY'
close to areas of active uses to make them visible from the
building entry. 9
❑ Locate seating in areas of active uses. A
C
Other strategy used:
Entrances
Provide entries that are clearly visible.
,,,( Design entrances to allow users to see into them before
I entering. ■
r•
Entrances should be clearly�identified (Signs must conform to
FWRC 19-140.060. Exempt Signs. (Applicable (luring
Certi,-care of gnmana Lwecdoni.
Other strategy used:
❑ i
Fencing f�f`
Fence design should maximize natural surveillance from the iF
street to the building and from the building to tyre street, 'and
minimize opportunities for intruders to hide.
• Tgyyg�:yy�:yS�' `
SL'QfiC '± 'tiv
A�1
Bulletin #022 —January 1, 2011 Page 3 of 9 UHandouts\CPTED Checklist
Front fences should be predorninantly open in design, e.g.
pickets or wrought iron, or low in height. e
Design high solid front fences in a manner that incorporates
❑ open elements to allow visibility above the height of five feet.
9
If noise insulation is required, install double -glazing at the
❑ front of the building rather than solid fences higher than five
feet. 9
Other strategy used:.
1.6 Landscaping
Avoid landscaping which obstructs natural surveillance and
allows intruders to hide.
Trees with dense low growth foliage should be spaced or their
crown should be raised to avoid a continuous barrier. n
Use low groundcover, shrubs a minimum of 24 inches in
height, or high -canopied trees (clean trimmed to a height of
eight feet) around children's play areas, parking areas, and
along pedestrian pathways. N
❑ Avoid vegetation that conceals the building entrance from the
street. ■
Other strategy used:
13
1.7 Exterior Lighting
Provide exterior lighting that enhances natural surveillance.
(Refer to FWRC 19.115.050(7)(a) for specific lighting
requirements.)
Prep
E
nare a lighting plan in accordance with Illuminating
gineering Society of America (IESA) Standards, which
addresses project lighting in a comprehensive manner. Select a
lighting approach that is consistent with local conditions and
crime problems. ■
Bulletin 0022 — January 1. 2011 Page 4 of 9 k:lHandouts\CPTED Checklist
Locate elevated light YZ �. .�' .J i.•.
fixtures (poles, light standards, etc.) in a �,. �•_�;,
coordinated manner that provides the desired coverage. The,';. ' w
useful ground coverage of an elevated light fixture is roughly
twice its height. 0��,'" ;"fir•
For areas intended to be used at night, ensure that lighting
supports visibility. Where lighting is placed at a lower height to
support visibility for pedestrians, ensure that it is vandal -
resistant. e
Ensure inset or modulated spaces on a building facade,
a slegress routes, and signage is well lit. e
In areas used by pedestrians, ensure that lighting shines on
pedestrian pathways and possible entrapment spaces. A
Place lighting to take into account vegetation, in its current and
mature. form, as well as any other element that may have the
potential for blocking light. B
Avoid lighting of areas not intended for nighttime use to avoid
giving a false impression of use or safety. If danger spots are
usually vacant at night, avoid lighting them and close them off
to pedestrians. e
13 Select and light "safe routes" so that these become the focus of
legitimate pedestrian activity after dark. ■
adl
Avoid climbing opportunities by locating light standards and
electrical equipment away from walls or low buildings. @
/Uphotoelectric rather than time switches for exterior
Ii;ting. e '
In projects that will be used primarily by older people
(retirement homes, congregate care facilities, senior and/ or
community centers, etc.) provide higher levels of brightness m
public%ommon areas. e
Other strategy used:
A
1.8 Mix of Uses
In mixed use buildings increase opportunities for natural
surveillance, while protecting privacy.
Bulletin N022 —January I, 2011 Page 5 of 9 k:Wandouts%CPTED Checklist
In residential uses, each individual unit should be clearly
numbered. In multiple building complexes, each building entry
❑ should clearly state the unit numbers accessed from than entry.
'' v-='
In addition, unit numbers should be provided on each level or
"'rh"> '"`F:;:=•,
floor. 9
S- 'fi:s ::r:•'a
❑ Street numbers should be made of durable materials, preferably
reflective or luminous, and unobstructed (e.g. by foliage). 9
For larger projects, provide location maps (fixed plaque
❑ format) and directional signage at public entry points and along
internal public routes of travel. A
Other strategy used:
❑
1
2.2 Entrances
�?
Avoid confusion in locating building entrances.
t.
Y
Entrances should be easily recognizable through design"
features andAirectional signage. (Signs must conform to
RCExempt Signs. ■
/WmC91.140.060.
inimthe number of entry points. a
Other strategy used:
~ 'x
6
2.3 Landscaping
Use vegetation as barriers to deter unauthorized access.h
❑ Consider using thorny plants as an effective barrier. 8
Other strategy used: '
13
2.4 Landscaping Location
Avoid placement of vegetation that would enable access to a
building or to neighboring buildings. .
Bulletin 4022 — January I, 2011 Page 7 of 9 kAHandouts%CP7•ED Checklist
5t�ci1�►b;: t7'n 1 ea u:i'o
Fir► Q ,: -r.�: r o]t Ance Sterttloi4 � { ' 4 - Y
�7RI:f�• � � ♦���. �S�t/" ����••3Y �• V .: •!C"::. �•;:"+ •: •l i�'••/+„L.�Sr �•: •f:�r.
'4' �• (f � ! rf�Y'C1fl.i':3y,. ems'.::.' .s; S'�:•y•.;:' = � '� "+ ;k•". .f...
1 o's.,s L+ it +f sF �:s+'ta yir .`'�„��•;��` i�%?�'. �•;tL' ;f��' i`�a* ' 9 r'..srs• <
Where exits are closed after hours ensure this information is
indicated at the parking area entrance.19 'o
Other strategy used
j i ;��rti`���•���-�
sir.•: _ . ��,i�:;y :•
13.1
3.2
Maintenance
Create a "cared for" image
Ensure that landscaping is well maintained, as per FWRC
19.125.090, in order to give an impression of ownership, care,
and security. (Ongoing).
Where possible, design multi -unit residential uses such that no
❑ more than six to eight units share a common building entrance.
■
Other strategy used:
13
Materials',
Use materials, which reduce the opportunityfor vandalism. , '''°i' • `
N
onsider using strong, wear resistant laminate, impervious
glazed ceramics, treated masonry products, stainless steel
materials, anti -graffiti paints, and clear over spraya to reduce
opportunities for vandalism. Avoid flat or porous finishes in k j ? !......
auras where graffiti is likely to be a problem
a.�
7
Where large walls are unavoidable, refer to FWRC: °� r
19.125.0.4(21) regarding the use of vegetative screens. e
f St` 4t.
/�o
on area and/or street furniture shall be made of longearing vandal resistant materials and secured by sturdy
anchor points, or removed after hours. e
Other strategy used: _ •ti',.'x!,f'i ;�
13
Bulletin #022 — January 1, 2011
Page 9 of 9
k:Wandouts\CPTED Checklist
MEMORANDUM
CITY OF _=
Federal Way
TO: Leila Willoughby -Oakes
FROM: Lindsey Sperry
SUBJECT: L T C A, LLC - (16-103606-00-CO)
30854 PACIFIC HWY S
Community Development Department
From:
Sent: Wednesday, October 19, 2016 1:44 PM
To: Leila Willoughby -Oakes
Subject: RE: E-Routing Land Use Routing - Drawings (30854 PACIFIC HWY S 98003)
Leila,
After reviewing the site plans for the revitalization project the Federal Way Police Department
have the following CPTED recommendations.
CPTED Recommendations-
* The building and parking lot need to maintain high levels of lighting. The minimum standard of
illuminances in public spaces are 20-30-50 LUX/2-3-5 Footcandles. It would be our suggestion
that the area surrounding the building and the parking lot meet this minimum standard.
• Fencing- There needs to be fencing which clearly acts as a barrier and visual representation of
the `area' of this property. The building in set on a parcel that is connected to other parcels and
allows easy access. Fencing needs to be placed around the intended area of use for this
business. This will help establish boundaries for the space.
• The windows on the building need to remain unobscured and act as natural surveillance for the
employees and any emergency persons responding to the property.
The police department would strongly suggest installing security camera's at the entrance to the
building and property if possible.
It is suggested that the property owner sign a "No Trespass" letter to have on file with the police
department to ensure that our officers can legally remove unwanted person(s) such as
transients from the property.
All landscaping should be kept below 3 feet or cutup to 7 feet as to minimize areas of
concealment around the property. If there are areas where activity is not wanted, we suggest
planting hostile vegetation there.
(_Lvwdsei sperri
Crwv-e AwaLUst awd PrevevwtLov. specLaLLst
federal WnU PDLLae Departmewt
LLv,,dse .s rr cit ed ralwa .� �
253-g3� ��o�-+�howe
253-8s� 6898- Fax
Federal Way Police Department is on Facebook and Twitter @FedWayPD
AfchitecturalIntent
L TCA LLC Building
30854 Pacific Highway South
Federal Way, Washington
RECEIVED
MAR 3 0 2017
Cf1Y OF FEDERAL MY
COMMUNfTY DEVELOPMENT
The L TCA LLC Building is an old lumber and hardware store that began its life in late 1940s or
early 1950's Over the ensuing years the original building was remodeled and added onto
bringing it to its current 'look' The building is need of upgrading and modernization.
The new Owner has proposed to remodel the interior to accommodate his company (a portion
of his company is currently working there) and re -clad the exterior to modernize the building.
The intent is to remove the facade that now covers a part of the North & South Elevations as
well as the West Elevation to expose the existing barrel vaulted roof - restoring part of the
original concept of the building.
The building will be re clad with James Hardie siding including the Hardie 'reveal system'and
Hardie plank to bring the structure into the present. The West Elevation will be opened up with
a storefront glazing system - again restoring a part of the one the original buildings history.
Landscaping as depicted on the landscape plans will be added as well. The current galvanized
chain link fence will be replaced with a black plastic coated chain link fence and a wrought iron
fence at public side of the site (see the Site Plan for the extent of each).
It is the intent to re -introduce the unique original features that present themselves such as.
Exposing the interior bx--bow trusses'(barrel vault trusses) at the Second Floor office
area that is proposed
Retaining the exposed wood decking and wood beam roof structures at the First Floor
• Exposing the barrel vault roof line created by the oxbow trusses at the exterior.
The end result is a modernized, usable and unique building that both the Owner and the City
can be proud of.
4��)7 Michael E. Hovland, Architect
New Lumber and Hardware
(original)
RECEIVED
AFAR 3 0 20V
CITY dF FEDERAL. WAY
COMMUNITY DEyEU�PM:
From: Lindsey Sperry
Sent: Wednesday, October 19, 2016 1:44 PM
To: Leila Willoughby -Oakes
Subject: RE: E-Routing Land Use Routing - Drawings (30854 PACIFIC HWY S 98003)
Leila,
After reviewing the site plans for the revitalization project the Federal Way Police Department have the
following CPTED recommendations.
CPTED Recommendations -
a The building and parking lot need to maintain high levels of lighting. The minimum standard of
illuminances in public spaces are 20-30-50 LUX/2-3-5 Footcandles. It would be our suggestion that
the area surrounding the building and the parking lot meet this minimum standard.
Fencing- There needs to be fencing which clearly acts as a barrier and visual representation of the
`area' of this property. The building in set on a parcel that is connected to other parcels and allows easy
access. Fencing needs to be placed around the intended area of use for this business. Tlus will help
establish boundaries for the space.
■ The windows on the building need to remain unobscured and act as natural surveillance for the
employees and any emergency persons responding to the propery.
• The police department would strongly suggest installing security camera's at the entrance to the
building and property if possible.
• It is suggested that the property owner sign a "No Trespass" letter to have on file with the police
department to ensure that our officers can legally remove unwanted person(s) such as transients from
the property.
■ All landscaping should be kept below 3 feet or cut up to 7 feet as to minimize areas of concealment
around the property. If there are areas where activity is not wanted, we suggest planting hostile
vegetation there.
L_%wdselU. sperm
Grime Avval,Ust avwd Prevewtiow Specialist
Federal wad T>oLl re Depavtmewt
L%vLdse�..5p� cit o dera✓.wa1� CDVu.
253-83.�r-6�Oi-�l� o we
253-835-�898- �aX
�IECEIVED
MAR 3 0 2017
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT
41k
FederalOF
Way
/ `>z - / 0 LIAA — c,tto
APPLICATION NO(S) & - 01;1 - G 0
Project Name �Tc-A 1_1 C--
MASTER LAND USE APPLICATION
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
33325 Wh Avenue South
Federal Way, WA 98003-6325
253-835-2607;Fax 253-835-2609
ww w.c ityo � federal wzv.com
Property Address/Location ?J 0 5 G f r l f-1 C- !-Yt 4 f4WA
Parcel Numbers) __C5 53 6y- o 2 2 o G 2 2 G, C, i
Date 3—_ (D `"/,;Z-
Project Description -- {A 11`'kVe_Me1,T fL�o g?vrf_p" oVAC: 1rW sto/ J y
PLEASE PRINT
Type of Permit Required
Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot Line Elimination
Preapplication Conference
Process I (Director's Approval)
Process II (Site Plan Review)
Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
SEPA Only
Shoreline: Variance/Conditional Use
Short Subdivision
Subdivision
Variance: Commercial/Residential
Required I�ndformation
�! Zoning Designation
Comprehensive Plan Designation
Value of Existing Improvements
Value of Proposed Improvements
International Building Code (IBC):
13 S • Z. I r-- 2 Occupancy Type
�L5 Construction Type
Applicant
Name: • -M I G4A£1-- +k5- (lr- AX-0
Address: I M M felt ? 1 AV") JEAS—I
City/State: Mll:Ta+vJ C '�
Zip: iv 354
Phone: 2 15 3 -
Fax:
Email: Mf_t},_ /1 Y�B,G
Signature: � / / i�i'
Agent (if different than Applicant)
Name:
Address:
City/State:
Zip:
Phone:
Fax:
Email:
Signature:
Owner
Name:1-
Address: 2 `r' % 2 �q �(� 5`""'ft}
City/State: /�o6ve-fj
Zip: q Upc> I
Phone: 2.J5,3 - gZ5
Fax:
Email: -roMC_ c 74�Ti !`Co►�STI-ocT��N.ccF<j
Signature. -
Bulletin #003 -January 1, 2011 Page I of 1 k:\Handouts\Master Land Use Application
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: April 3, 2017
TO: Cole Elliott, Development Services Manager
Rick Perez, City Traffic Engineer
Brian Asbury, Lakehaven Water & Sewer District
Chris Cahan, South King Fire & Rescue
FROM: Leila Willoughby -Oakes, Planning
FOR DRC MTG. ON: Please send comments via email. Thanks!
FILE NUMBER (s): 17-101422-00-UP
RELATED FILE NOS.: 16-1036036-00-CO (building permit in since 07/2016;
pending Use Process I)
PROJECT NAME: LTCA, LLC
PROJECT ADDRESS: 30854 Pacific Highway South; Parcels: 785360-0140,-
0141,-0145,-0146,-0220 & -0226)
ZONING DISTRICT: BC
PROJECT DESCRIPTION: Remodel including tenant improvements, exterior siding
replacement, additional parking, new garbage
enclosure, perimeter landscaping, plaza, and perimeter
fencing. The applicant added limited manufacturing and
production and office uses to the existing
development.
LAND USE PERMITS: Use Process I- Site Plan Review
PROJECT CONTACT: Mr. Michael Hovland
Hovland Architects
900 Meridian Avenue East, Suite 408
Milton, WA 98354
Email: architect.meh@aol.com
Tom Cantrell (Owner)
Metier Construction Inc.
29727 49th Ave. S., Auburn WA 98011
Email: tomc@metierconstruction.com
MATERIALS SUBMITTED: Plan -Set
Narrative
CPTED Checklist
Landscape Modification Request
Fencing Photos
door- s e-r,
T
to -A Co c-oL
EAST ELEVATION
.cf-*s-M-)
t,4 I
r
13