23-100817City or Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: RILEY
Project Address: 36910 4TH AVE SW
Electrical
Permit #:23-100817-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 218820 1950
Project Description: BLUEBEAM - Installation of 10.44 kW roof mounted PV solar system. 3 circuits.
Owner
Applicant
Contractor
MICHAEL RILEY
SOLGEN POWER LLC
SOLGEN POWER LLC
369104TH AVE SW
5715 BEDFORD ST
SOLGEPL830RJ (1/24/24)
FEDERAL WAY WA 98023
PASCO WA 99301
5715 BEDFORD ST
PASCO WA 99301
Additional Permit Information
Is this an Online or O.T.C. application? ................. No
Circuits - Residential
Electrical Fixtures
CONDITIONS:
Upon completion of installation, the following photographs shall be emailed to
planreview@southkingfire.org and alarms@southkingfire.org
- Finished installation showing 36" access from the ground and 18" clearance at roof peak.
- Location of shutoff switch with signage.
- Photo of the front of the house showing the address or street side view.
Email the photographs at least 2 business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending.
You will receive a response back from SKFR once the permit has been approved by SKFR so you can
schedule your electrical final inspection.
If no response from SKFR within 2 business days, call 253-946-7348 to check status.
PERMIT EXPIRES Sunday, 8 October, 2023
Permit Issued on Tuesday, April 11, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Was on and the City of Federal Way.
!911
Owner or agent: Date:
CITY OF
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 23 100817 00 Address: 36910 4TH AVE SW
Project: MICHAEL RILEY FEDERAL WAY WA 98023-7337
Scheduled inspections maybe failed if this card is not on -site. DO NOT LOSI•: -1-I115 CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0 UFER Ground (4295) 0 Ditch cover (4030) 0 Slab/Concrete Floor (4255)
Approved Approved Approved to place concrete
By Date By Date By Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
®
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
❑
❑
Feeders/Sub-panels (4045)
Rough Electrical (4225)
Final - S K F & R (4060)
Approved
Approved
Approved
By Date
By Date
By Date
10 't Ceiling Cover (4020) /'-Electrical (4055)
Approved Approved
By Date By Dafe���
❑
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
JBy
Date