Loading...
20-100455CITY OF Federal 'Way Centered on Opportunity FILE Mr. James Cox Light of Christ Church 2400 SW 344th Street Federal Way, WA 98023 Iim e_c x c mcast. CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Jim Ferrell, Mayor February 27, 2020 Re: File #20-100455-00-UP; PROCESS I DIRECTOR'S APPROVAL Light of Christ Church Community Garden Storage Shed; 34249 21s, Avenue SW, Federal Way Dear Mr. Cox: The Community Development Department has reviewed the Process I Master Land Use Application for a proposed storage container at the Light of Christ Church Community Garden. The application was determined complete on February A 2020, and is hereby approved per the enclosed Endings of fact and conclusions of law. BUILDING PERMIT As the storage container is approximately 160 square feet in size, no building permit is required. APPEALS The effective date of this decision is March 1, 2020, or three days from the date of this letter. Pursuant to Federal Way Revised Code (FWRC) 19.55.050, any person who received notice of the administrative decision may appeal this decision to the Federal Way Hearing Examiner by March 16, 2020. Any appeal must be in the form of a letter delivered to the Department of Community Development with the established fee. The appeal letter must contain a clear reference to the matter being appealed and a statement of the alleged errors in the director's decision, including the identification of specific findings and conclusions made by the director disputed by the person filing. In that you are the only party of record, you may waive your right to appeal, if desired, by submitting a letter to this effect to the City of Federal Way, Department of Community Development. Waiver of the right to appeal does not affect the effective date of this decision. CLOSING This land use decision does not waive compliance with future City, of Federal Way codes, policies, and standards relating to this development. This Process I approval is valid for one year from the effective date of this decision. If no further action is taken within one year, this decision will expire. If you have any questions regarding this decision, please contact Senior Planner Jim Harris at 253-835-2652, or jim.harris@cityoffederalway.com. Sincerely, x6ty 0' L". � �� - Brian Davis Community Development Director enc: Exhibit A —Findings of Fact and Conclusions of Law, 20-100455-LIP Approved Site Ulan --- Light of Christ Church Community Garden, Received February 4, 2020 c: Jim Harris, Senior Planner Doa LD. 80167 20-100455-00-UP - Community Development Department CITY OF Federal Way EXHIBIT A Findings of Fact & Conclusions of Law for Process I Directors Approval Light of Christ Church — Community Garden Storage Shed Accessory Storage Shipping Container File #20-100455-UP The Director of Community Development hereby makes the following findings pursuant to content requirements of the Process I written decision as set forth in Federal Way Revised Code (FWRC) 19.55.020. These findings are based on review of existing city documents and submitted items by the applicant received February 4, 2020, and February 13, 2020. FINDINGS 1. Proposal — The applicant proposes to place a 20-foot by 8-foot, 160 square foot metal storage shipping container as an accessory to the existing Light of Christ Church Community Garden. The community garden was approved by the city on June 30, 2011, under file number 11-102373 UP. 2. Existing Conditions —The subject site is an 8.5-acre parcel developed with a church use and community garden. the community garden portion of the property is bordered by a vacant residential property to the north; SW 344t' Street to the south; 21" Avenue SW to the east; and the church building and associated improvements to the west. 3. Comprehensive Plan & Zoning Designation — The subject property is zoned Residential Single - Family (RS) 7.2 and is within the High -Density Single -Family comprehensive plan designation. The primary use of the subject property is a church, which is permitted in the RS zone pursuant to FWRC 19.200.050. A secondary use of the subject property is the existing community garden associated with the church, which was approved by the city on June 30, 2011, under file number 11-102373-UP. 4. Use & Review Process — According to FWRC 19.125.180, outdoor storage containers for permanent accessory storage are allowed subject to Process I in the RS zone only in conjunction with institutional or quasi -public uses. As proposed, the container will be used for the church community garden purposes. 5. Design Criteria — The proposed storage container meets the design criteria in FWRC 19.125.180 for a storage container in conjunction with an institutional use in an RS zone, as discussed in the applicant's written responses submitted to the city on February 13, 2020. The applicant's response to the design criteria are hereby incorporated by reference. In summary, the proposed storage container will meet the following: minimally visible from a public right -of way; screened from the view of adjacent right-of- ways and residences by existing and supplemental landscaping and vegetation; painted in gray or gray - green to match adjacent buildings; and not stacked or refrigerated. Findings of Fact & Conclusions of Law for Process I Directors Approval Page 1 of 2 Light of Christ Church — Community Garden Storage Shed Accessory Storage Shipping Container 20-100455-UP / Doc ID 80168 6. Environmental Review —The proposed improvements are exempt from environmental review. The new building will be less than 12,000 square feet and the improvements are consistent with the State Environmental Policy Act (SEPA) definition of "minor new construction," as set forth in WAC 197- 11-800(2)(e). 7. Height —The height of the structure is below the 30-foot height maximum limitation for a church use, as stated in FWRC 19.200.050. 8. Setbacks — The required minimum yard setbacks for the proposed container is 30 feet from all property lines, which is met by the proposed location on the site plan. 9. Nonconforming Development —As proposed, the project is exempt from the requirements of FWRC 19.30.090(1), to bring all nonconforming aspects of a development into conformance. Additions of less than 2,500 square feet are exempt. 10. Transportation — Based on the submitted materials for the construction of a 160 square foot storage shed, the proposed project is estimated to generate no new weekday PM peak hour trips. 11. Stormwater — The project as designed with a new 160 square foot storage shed is exempt from stormwater review under the 2016 King County Surface Water Design Manual. 12. Building Permit — A building permit is not required as the building size is less than 200 square feet in size. 13. Decision Criteria — Staff finds the proposal is consistent with applicable site plan approval criteria required for Process I, as set forth in FWRC 19.55.020. The proposal is consistent with the city's comprehensive plan; applicable provisions of FWRC Title 19 "Zoning and Development Code" (including FWRC 19.125.180); public health, safety, and welfare; and streets and utilities in the area are adequate to serve the anticipated demand from the proposal. CONCLUSIONS Various sections of the zoning and development code indicate that certain developments, activities, or uses are permitted only if approved using Process I — Director's Approval. Based on the findings above, the proposed improvements to the developed site meet the Process I approval criteria and land use review standards of FWRC 19.125.180 and 19.55.020: 1. The proposed improvements are consistent with applicable chapters of FWRC Title 19, including, but not limited to: Chapter 19.125, Article IV, "Outdoor Activities and Storage"; Chapter 19.55, "Process I — Director's Approval"; and FWRC Zone Use Chart 19.200.050, "Church Use in the RS Zone." 2. The proposal is a minor improvement, modification, or addition to a site that is exempt from State Environmental Policy Act (SEPA) review. 3. The health, safety, and welfare of the citizens of the city are preserved. The approved site plan complies with specific FWRC regulations These findings shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. Prepared by: Senior Planner Jim Harris Date: February 27, 2020 Findings of Fact & Conclusions of Law for Process I Directors Approval Page 2 of 2 Light of Christ Church — Community Garden Storage Shed Accessory Storage Shipping Container 20-100455-UP / Doc ID 80168 3c, BUILDINGAND PARKJNG SETBACK Ns9- T-v os°' E, EXISFING PKOFE-MY LINE p ti' �o � (_Ye Pwt) C66L Y) I �J 34+TH AVr- L-39- i " R-23.00' s9" 37't,' o l!� E z P E s PAS AND �-.. 0 3ooT D 350, a— Li Lmj V fl s r J S L aLK W � C n� V � - s 00422020 s E a l ® CM=W AL WAY Lj —i F'DEVELOPMENT n Ell I Community harden Storage g ontalner �R�EEivE�D ?urpose FEB 0 4 2020 This request is to place an 8' x 20' metal shipping container to 1 c o ��c��a war `�MMUNifY f1EVE�Qa�r,��,; storage at the Light of Christ Community Garden. The Light of Christ or tool and equipment located on the east side of the eight -acre property on the northwestquadrant fCommunity Garden is intersection of 21St Avenue Southwest and Southwest 344th street in Federalof the The Process I Director's Approval, File #11-102373-00-U Way, WA. Construction of the garden area was completed in 2013. On #� granted an June 30, 2011. small cottage and a workshop. Since 2013 two wooden sheds were added.Property were two buildings, a used for storing power equipment and flammables was added in JanuaryoA 10 x 20' shed 8' x 18' wooden activity shed was added in 2019 to store materials such f tents, A second games, etc. has tents, signs, The proposed metal shipping container would be placed five feet from 16' activity shed. The front of the container would be parallel to the activity west side of the h x onto to gravel driveway area. The west side of the shed faces a wooded shed facing south three perennial shrubs such as rhododendrons, forsythia, etc. to Providerea. We will place from SW 344th Street. The north part of the container faces a heavil w additional screening not require screening. Y additional area and would The container will be placed on a five -inch bed of ground (recycled) as will be removed. There is no effect on ground water flow, phalt. No dirt or trees �olor Scheme The cottage is painted grey with white trim. The workshop is painted grey. storage sheds are painted yellow with yellow metal rolling doors. The con .The two wooden tam a dark color -either grey or grey -green to coordinate with existing structureer will be painted s. tackground The Light of Christ Church property is approximately 8.5 acres, composed Parcel 2421039115 has the main church building, while parcel 24210390of two land parcels. containing a 100' x 100' garden a small cottage, sheds and a greenhouse 5 is the Power area eight acres is forested. About 50 /o of the 1k Federalay RESU BM ITTE WASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT FEB 0 4 2020 33325 V Avenue South Federal Way, WA 98003-6325 CITY OF FEDEi:iALT WAY 253-835-2607, Fax 253-935-2609 C01MF1r1UNfiY DEVELCRME`._ www.ci offedera]wa .cam APPLICATION NO(S) 0?0 - 160 415 5 _ J ' Project Name k i s-,/Nr v ,F Property Address/Location Parcel Number(s) ` � .;a / b Project Description ,U " PLEASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director's Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: COmmercial/Residential Date c:> ,srGi��ac/d /Gnr�r�caJ fRequired Information ' ' Zoning _ - n 8 Designation I - Comprehensive Plan Designation Value xisting Improvements alue of Proposed Improvements 1 ternati al Building Code (IBC); Occupancy Type Construction Type 4 5e-oa a 1:11.. Applicant Name:�r� k Address: + x 4,, " d-aae- e,#wot.,_f. CitylState: F e,� Zip: �� t"a ,q yo , UJ A- �� Phone: °y o Fax: 6A53) Email: -T;km , F Gu X CDme' AsT. ,,t/e% Signature: Agent (if different than Applicant) ~ Name: Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: L / Si./ 7- Address: a Zr Lvr/4 U sa Sw _1Nu-t2 ST City/State: td ^ L 1�., Zip: I� L1, 3 y' 1 L-4- Phone: [� S3 Fax: Email: Signature letin #003 — January 1, 2011 Page 1 of 1 k-WandoutslMaster Land Use Application