18-104600CITY OF .. Federal Way Centered on Opportunity October 15, 2018 Your Girl Friday Attn: Teresa Fortino 4001 NW 35`h Avenue Gig Harbor, WA 98335 RE. Multicare Off -Campus Emergency Center; Folder # 18-104600-000-00-SM; Response to Request for Soil Nails within Right -of -Way Dear Ms. Fortino: CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Jim Ferrell, Mayor The City of Federal Way has reviewed your request to allow Soil Nail within the right-of-way dated September 27, 2018. After evaluating the existing conditions along 16`h Avenue S, review of the Federal Way Revised Code (FWRC) provisions (Section 19.135.040 thru 19.135.070) and the direction provided by the City Council, the Public Works Department provides the following response to your request: Request to allow soil nails within the 16th Avenue S. right-of-way Staff requested right-of-way sections along with an estimate of the total number of soil nails proposed to be installed along 10 Avenue S. GeoEngineers estimated that between 40 and 60 soil nail would intrude into the right-of-way. Section A -A indicated that at the edge of the right of --way they highest soil nail would be approximately 15-feet below ground surface. Staff also reviewed both previous requests for soil nails which included the Wal-Mart on 161h Avenue and Sound Transit's Federal Way Light Rail Extension. The Public Works Department hereby denies this request to allow soil nails within a City right-of-way. The conditions of this decision will be applicable for one year from the date of the letter. If you have any questions or concerns, please contact Cole Elliott, P.E., Development Services Manager, at (253) 835-2730. Sincerely, EJ Walsh, P.E. Public Works Director CE:mt oc: Brett Larabee, P.E., GeoEngineers, Inc., 1101 Fawcett Ave #200, Tacoma, WA 98402 Costa Philippides P.E., Barghausen Consulting Engineers, 18215 72Id Avenue S, Kent, WA 98032 Project File (ce) Day File \\cfwfile 1 \applications\csdc\prod\docs\save\ 154112_78332_05133014.doc CITY OF Federal Way PUBLIC WORKS DEPARTMENT STREET MODIFICATION REQUEST / ACTION Project Name MultiCare Off -Campus Emergency Clinic Permit # 18-104600-SM Location 29805 Pacific Highway S Request The Applicant proposes to construct a 9,800 square feet emergency clinic on a 1.7 acre of land. Part of the design includes a retaining wall along the western portion of the land. The retaining wall will vary in height from 1-foot to over 20-feet. The current design proposes to use a retaining wall design which requires soil nails. Staff Analysis To understand the potential impact of the request, staff requested sections to show some of the proposed soil nails, the distance into the existing/future right-of-way and an estimate of the total number of soil nails which may be installed into the right-of-way. If allow, GeoResources estimate between 40 and 60 soil nails will extend into the City's right-of-way. Section A -A shows the most intrusive situation where a group of three soil nails extend approximately 3-feet into the right-of-way with the closest to ground level located approximately 15-feet down. A review of previous requests to use soil nails within the right-of-way indicates that all previous requests (Sound Transit and Marketplace Center) have been denied. Requirements / Conditions of Approval Development Services staff recommend that Public Works Director deny the request to allow soil nails into the 16t" Avenue S right-of-way. Staff Recommendation: Development Services Reviewer Development Services Manager Traffic Division Reviewer Traffic Division Manager lirrricrl Date 1 fJ 0 I fi 1 Oar 2or Sl Approve Deputy Director ze�dA r� �(_[ ❑ Director Decision zkl 4 lot1> ` I P ❑ K:\DEVELOPMENT SERVICES\STAFF IOLDERSI OL 15lreel Mod\MHS Off -Campus Em Clinic SM.docx Scan completed form into Amanda folder l 8 - to y(po o - 5m RECEIVED SEP 2 8 2018 CITY OF FEDERAL WAY G EO E N G I N E E RS-.�g COMMUNITY DEVELOPMENT 1101 South Fawcett Avenue, Suite 200 Tacoma, Washington 98402 253.383.4940 September 27, 2018 City of Federal Way - Department of Community Development 33325 8t" Avenue South Federal Way, Washington 98003 Attention: Cole Elliot, Development Services Manager Subject: Modification Request Building Permit Number 18 102604 00 MultiCare Health Systems Off -Campus Emergency Clinic Federal Way, Washington File No. 2868-017-02 This letter presents a Modification Request for a permanent retaining wall along the west site boundary of King County Parcel 0421049033, located at approximately 29805 Pacific Highway South in Federal Way, Washington. A vicinity map is provided as Figure 1. On behalf of MultiCare Health Systems, we are requesting a modification to allow construction of a soil nail wall where some of the soil nails may extend beyond the property boundary into the City of Federal Way right-of-way. The west side of the existing site is bounded by a steep slope (between approximately 1.5H:1V [horizontal:vertical] and 1H:1V) that leads up to 16th Avenue South. To accommodate the proposed improvements, a retaining wall is planned near the west site boundary to support the slope and roadway. A site plan showingthe proposed location of the wall is provided as Figure 2. The face of the proposed wall will be located within the parcel boundary. The free height of the wall will be about 19 feet near the south end of the wall and will decrease to less than 5 feet at the north end. The project team is proposingto construct portions of the wall greater than about 10 feet in height as a soil nail wall system. For wall heights less than about 10 feet, the design will likely involve either a cantilever or gravity wall system that will lie entirely within the property boundaries. No tiebacks or nails will be used for this portion of the wall. A soil nail wall consists of drilling and grouting rows of steel bars or "nails" behind the excavation face as it is excavated and then covering the face with reinforced shotcrete. The placement of soil nails reinforces the soils located behind the excavation face and increases the soil's ability to inhibit a mass of soil from sliding into the excavation. Soil nail walls are a "passive" earth retention system meaningthat the nails are not tensioned after installation. Soil nails are different than tiebacks; tiebacks are typically longer than soil nails and are tensioned after installation. City of Federal Way — Department of Community Development September 27, 2018 Page 2 Conceptual wall cross sections are provided as Figures 3 through 5. Figures 3 and 4 show conceptual soil nail wall configurations and Figure 5 shows a conceptual cantilever soldier pile wall configuration. At the location of the maximum wall highest (Cross Section A -A', Figure 3) we expect that the soil nails will be around 15 feet long and will be installed as a declination of around 20 degrees from horizontal. As shown on Figure 3, we anticipate the soils nails would extend a maximum of around 3 feet beyond the property line. At the location of the property line we expect that the soil nails will be around 15 feet below ground surface. The nails would not extend below the 16th Avenue South roadway. As the retained height of the wall decreases, we expect that the length of the soil nails will also decrease and by the time the wall height is around 11 feet (Cross Section B-B', Figure 4) the soil nails would not extend beyond the property boundary. In areas where the wall is constructed as a cantilever or gravity wall (Cross Section C-C', Figure 5), the wall would be located within the property boundary. We understand that current City of Federal Way Policy does not allow "tiebacks" to extend into City right-of- way. We are requesting a modification to allow construction of a soil nail wall where some of the soil nails will extend beyond the property boundary. As shown in the figures and described above, the soil nails would be located a significant distance below ground surface at the property line and would not extend below 16th Avenue South. In our opinion, the existing slope on the west property boundary within and outside of the property boundary is over -steepened and likely does not meet generally accepted factor of safety requirements with regards to seismic slope stability. The proposed retaining wall will be designed to withstand a design earthquake in accordance with the 2015 International Building Code (IBC). In our opinion the wall will reinforce the slope that supports the 16th Avenue South roadway and will likely improve the global seismic stability of the slope and roadway during the design earthquake event. We appreciate you taking the time to review this Modification Request. We are available to discuss the conceptual layout further or answer any questions you may have. Our contact information is provided below. Respectfully submitted, GeoEngineers, Inc. Brett E. Larabee, PE Geotechnical Engineer biarab e@ eoen ineers.cam 253.722.2436 BEL:MM:tt Attachments: Figures 1 through 5 M F n ur, E Associate eological Engineer mo-rthur@ e e iners.com 253.722.2431 Disclaimer: Any electronic form, facsimile or hard copy ofthe original document (email, text, table, and/orfigure), if provided, and any attachments are only a copy ofthe original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record. GEOENGINEER, File No. 2868-017-02 . S 276th St I` s a {�® 9 5 277th PI y a 5 Star take Rd N by a S 279th St �M1r� n Y� e Y 5 2801h St 77 • - Y 5282nd St n N S282nd St s ~ ' a` s S 284th St j S 284th St S 284th PI S 264th S 285th St y, a y iiil k S,� ^_ A S 286M St N � 2b _ N N 11.4 N v N S:81 r $ i 5288th St 5 288th St i� J NM-6m Deramlary Qt 1 ¢' 'St r S 2900 N — r S,?g "' �,Lo rst St- ry SW 292nd St S292nd 3• t L SW 293rd St a cJ 5 293rd S[ i ? c , v a '•' h a m 1 • m' :. 297[h.$ S1 �F S 296th St AfRRI�iH: HILLS J ! i S296thN '- SW 298th PI a ' • S 2981h St S 298th S[ SZ98th 5[ n St 52�^s5t SZ• °" ''""""„"` SITE Il' MAR CHERI — PUGET SOUND s a 3p i !'ijl S299t'St Palnr Rd L HILLS m — y m 5300th S[- IJJI Sf00 Dash '• 5'N t a n YBldwooe eementary o i • M1 S Dash PYint Rd ^ S 302nd 5[ r+iz L 5302nd 5f rs 5303rd St N �fll �S302nd1 � . "�Sw l041h H L 5 304th S['^ o ; S 304[h St S 3041h Sr- I+ S 304th St 5W 32I§tt15l. 5 304th PI W ' S 304th St n 53051h St .. Sd.W lh St S 308[h St -- N ¢' N � 5 308[h S[ S 308th St 1 4 = � trie Grace eemennry m m t s v, PAS 310th St r + MIRROR LAKE . �� s t l Sr i O `r I; 5 3121h St S 312th St 5 312th 0-1N. • S 312th 5t w y a 5313th St 'I •� K ", w • 4i A a n Q �5314th St x Q S 314th Sr a' y t;vn%Wrerel a 16mr141e Ekrn ury c 5315th St D ` o` N N �16thSt St 8 I.. k.•+. fI+ S 316[h PI Sdnd H a S316th St ® 5 316th St m RST—R[8h S 31"t,St S e i n. w,rm S 311th PI ,3170,St � Y SOW o e' . 5 317[h St 5 316th PI k � Sea tie Rtmton Kent Tacoma Notes: 1. The locations of all features shown are approximate. 2. This drawing is for information purposes_ It is intended to assist in showingfeatures discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. Data Source: Mapbox Open Street Map, 2015 Projection: NAD 1983 StatePlane Washington North FIPS 4601 Feet N W E S 2,000 0 2,000 Feet Vicinity Map Federal Way Free Standing Emergency Center Federal Way, Washington GMENGINEER Figure I S— l0q(000 .ie•.;�s< !X FYI 1L Mfl [ l•ff l IVrw ,l T••+�i +" k'wcli a -I •�' 432' { f I 3�2� .. W,.uiN�rlJ f4linnrf• a'J� I` , ; �� � b , 435i - __•1 -.- 4 AIL �i.U�,•' ._'. �II li, 438 ' I _• 4'37 __._ I ! 439 438 + ¢ j _ 439r-- C r i•J --- 443 AAI� .. J 4+4.4 _ p$3 m" II� wnpA�a=u�wm� 44A el'y� 1 AA5 �AAT i� ' I '-• B. C a ii i5l i !ryI 448 1 r45� •4��7 . 449 I. 0 , 450 , l 43 A .111 fa riuwK+�» a_cnciEs.n��na� r s�wln.l F rpASH uN stop n cminaa NIA='clxi I Fs-f rav .n it r.fus FIM•tl PIVF •wCIL�'=41-16 Y — — rn;i c•rrr,. Legend +� Site Boundary B-1+ Baring by GeoEngineers, 2017 Notes: 1. The locations of all features shown are approximate. 2. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. Data Source: Background or Aerial from XXXX dated xx/xx/xx. Projection: XX State Plane, XX Zone, NAD83, US Foot RGIr_FivFn N SEP 2 8 20% WI#E Cr Y OF FaiERiu-My S COMMUNITY a 50 Feet Site Plan Federal Way Free Standing Emergency Center Federal Way, Washington GMENGINEERS� Figure 2 A A� to soil nail at (East) (west) it R � � property line = 15 460 - _ _ - - — - — --feet 460 0 Existing Grade 450 m / -IT--- LL 440 -�� hE"�r►� till' l Soil Nails will extend l5 approximately 3 W W 430 feet past property - — --0 line 1S' U 420 - -- - - _ - — - - — 420 Proposed Grade G a H 410 0 10 20 i 30 40 50 60 70 so 90 410 100 a r M 0 Distance (Feet) 00 m 00 W i ti ppab n a Cross -Section A -A' 5 Federal Way Free Standing Emergency Center 10 0 10 Federal Way, Washington g w Horizontal Scale In Feet 1❑ ❑ 1❑ G M E N G I N E E R5� Figure 3 Vertical Scale in Feet Vertical Exaggeration: 1X C C1 (west) cam) 460 --- -- - - - - ---- - - 460 Existing Grade ! 1 450 - - ... I - - - ---- 450 II � I � l 1 - -- — 440 0 440 w C � r ' w 430� 1C -- - LU 430 e; 420 420 - - -- — 9 of P posed Grade U 410 410 0 10 20 30 40 50 60 70 80 90 100 110 120 o Distance (Feet) r n 0 1 .a O O ti w Cross -Section C-C' a Federal Way Free Standing Emergency Center 10 0 10 Federal Way, Washington Horizontal Scale in Feet 10 Vertical Scale in Feet �� G M E N G I N E E RS Figure 5 °' Vertical Exaggeration: I-X