RE: File #12-100299-00-UP; PROCESS I `DIRECTOR'S APPROVAL'
Hometown Plaza, 33320 Pacific Hwy South, Federal Way
Dear Mr. Park:
The Community and Economic Development Department has received your Process I Master Land Use
(MLU) application to expand the breezeway connection between the existing front and rear parking lots.
The Process I MLU application is hereby approved pursuant to conclusions based on findings made by
the department's Planning Division. Please note - this approval is limited to the design review of the
addition and does not constitute building permit approval that is required prior to construction.
CONCLUSIONS
Various sections of the Zoning and Development Code indicate that certain developments, activities, or
uses are permitted only if approved using Process I — Director's Approval. Based on the findings below,
the proposed improvements to the developed site meet the following Process I approval criteria and land
use review thresholds of Federal Way Revised Code (FWRC) 19.15.030 and 19.55.020:
1. The proposed improvements are consistent with applicable chapters of FWRC Title 19 including, but
not limited to: Permits and Review Processes; Process I — Director's Approval; Community Design
Guidelines; and Community Business (BC).
2. The health, safety, and welfare of the citizens of the city are preserved;
3. There is no change of use;
4. There is no reduction in the amount of required landscaping, buffering, open space, or public areas;
5. There is no material change or reduction in the amount of required parking;
6. There is no material change in the location of utilities, easements, or pedestrian connections;
7. There is no material change to the approved architectural design; and
8. There are no additional adverse impacts to sensitive areas or significant trees.
FINDINGS OF FACT
1. Proposal — The applicant submitted a Process I MLU application on January 24, 2012, proposing to
expand the existing breezeway by 7'3" to improve passage from the front parking lot and buildings
to the rear parking lot. The northern side of the existing tenant space will be demolished and
replaced with hardy board siding to match the existing wall finish. The dimension of the new
breezeway passage will be 14' 6". No changes will be made to the existing parking stalls, walkways,
or roof.
2. Comprehensive Plan & Zoning Designation - The zoning and comprehensive plan designation for
the subject property is Community Business (BC) zoning district.
Mr. Park
February 13, 2012
Page 2
3. Community Design Guidelines Compliance — The expansion does not change the architectural
character of the existing buildings on site. The expansion of the breezeway will create better
pedestrian access to the rear parking lot by widening the passage area.
4. Environmental Review — The proposed expansion of existing breezeway is categorically exempt
from an environmental threshold determination pursuant to State Environmental Policy Act Rules
197-11-800(3).
BUILDING PERMIT ISSUANCE REQUIRED
The department's Building Division is currently reviewing the building permit (File #12-100300-00-CO)
associated with the expansion of the existing breezeway. No work may begin until the building permit is
issued. Please contact a Development Specialist at 253-835-2607 if you have any questions regarding the
building permit.
APPEALS
The effective date of this decision is February 16, 2012. Pursuant to FWRC 19.55.050, any person who
commented on the application or requests a copy of this administrative decision may appeal the decision
to the Federal Way Hearing Examiner by March 1, 2012. Any appeal must be in the form of a letter
delivered to the Department of Community and Economic Development with the established fee.
However, as you are the only party of record, you may waive your right to appeal this decision. If you
wish to waive your right to appeal, you must do so in writing to the Department of Community and
Economic Development. No work on the proposal may begin until the end of the appeal period or
February 16, 2012, provided you have requested waiver of the appeal period.
CLOSING
This land use decision does not waive compliance with future City of Federal Way codes, policies, and
standards relating to this development. This Process I approval does not constitute approval of a building
permit. If you have any questions regarding this decision, please contact Becky Chapin, Assistant Planner,
at 253-835-2641, or rebecca.chapin@cityoffederalway.com.
Sincerely,
Isaac Conlen
Planning Division Manager
for Patrick Doherty, Director
enc: Approved Site Plan
c: JoonPark,stranger5201@hotmail.com
Arthur & Shirley Inc., PO Box 3858, Federal Way, WA 98063
Scott Sproul, Plans Examiner
12-100299
DocI.D. 60339
I
I , ;
M I
a
RF
CELL
PLM
remit Nu��r-A�DV ,��1�' ��' 9 � � JA N 2 4
, C 3� ' dtG; �P; c � IMF>EDERAL NAY
• I Commem:�LrAfri1+ZLZA■!l
< W E5T 51P6 V16 W "
r,��j"� «✓.'r�w�' �ri'",w�"rY..+• s'f.r• .,n' r �, .. _ .. .�_ - , .`..,._.w_ _ _. ..... y_-.+.......ww�
r
Fx/s?r/Ncf POR
• . M � r,' l
■G-^ l _ r
vpc.NR�
A..<T .51.4r,116
ji to po
#xl.v-rl,vcr
Rowse 04�
•
CITY OF FEDERAL WAY
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: January 27, 2012
TO: Ann Dower, Senior Engineering Plans Reviewer
-Development Services
-Traffic
Scott Sproul, Plans Reviewer
Chris Ingham, South King Fire & Rescue
FROM: Becky Chapin
FOR DRC MTG. ON: No Meeting, Email any comments
FILE NUMBER(s):
12-100299-00-UP
RELATED FILE NOS.:
12-100300-00-CO
PROJECT NAME:
Hometown Plaza
PROJECT ADDRESS.
33320 Pacific Hwy South
ZONING DISTRICT:
BC
PROJECT DESCRIPTION:
Building improvement, to include demolition of a
portion of a building and construction/expansion of a
breezeway to connect east parking lot to main parking
lot.
LAND USE PERMITS:
Process I
PROJECT CONTACT:
Joon Park
2117 South lst
Tacoma, WA 98405
MATERIALS SUBMITTED:
Master Land Use Application
Project Narrative
Site Photos
Site Plan Drawing
Elevation Drawings
Hometown Plaza
Business Address:
33324 Pacific HWY S
Federal Way WA 98003
Project description:
The shop in above address (33324 Pacific HWY S Federal Way WA 98003) presently has a bridge
way to the parking lot.
We will demolish northern side wall and expand the existing bridge way by 7'3". We will
replace the exterior wall with hardy board sidings and paint in accordance with the existing wall.
This project is intended to facilitate passage from the building to the parking lot.
Joon Park
2117 S I St
Tacoma WA 98405
RECEIVED
J A N 2 4' .7
CITY OF FEDERAL WAN,/
CDS
LL,
UR
'imam
4
ti
��CEIVED
MASTER L ND USE APPLICATION
DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES
2 4 LJ 33325 8`h Avenue South
CITY OF Federal Way, WA 98003-6325
�F FEDERAL-WAY 253-835-2607;Fax 253-835-2609
Fe d e ra I Way_r�y - www.citvoffcdcrakyay.com
APPLICATION NO(S) I , - I We?(-rl -00
Project Name kyM-e LA" ,Al
Property Address/Location 3 3 ;2-# ~� C
Parcel Numbers) d
Project Description
PLEASE PRINT
Type of Permit Required
Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot ine Elimination
application Conference
Process I (Director's Approval)
Process II (Site Plan Review)
Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
SEPA Only
Shoreline: Variance/Conditional Use
Short Subdivision
Subdivision
Variance: Commercial/Residential
Required Information
Zoning Designation
CCA4 77't ft&mprehensive Plan Designation
Value of Existing Improvements
bu Value of Proposed Improvements
International Building Code (IBC):
Occupancy Type
Construction Type
Date
Applicant
Name:
Address: 21�� 1 Sr
City/State: 7- d A 4, 14
Zip: 7,9 cl- 0
Phone: P-66 — 393 17
Fax:
Email: St-kGi 07,4.eY ,1,� / � �/o , C o �
Signature:
Agent (if dl rent than Applicant)
Name:
Address:
City/State:
Zip:
Phone:
Fax:
Email:
Signature:
Owner
Name: h p--�11 Li Y
Address: ? o %� dX 6 C
r� _ - --
City/statc: r%,.eJ"2r
Zip: q 9 D 0
Phone: �� 6��0
Fax:
Email: (jc*- �� a�f ►r��� Go w
Signature:
Bulletin #003 — January 1, 2011 Page 1 of l k:\Handouts\Master Land Use Application