15-105750 (2)CITY OF L Federal Way August 18, 2016 Mayfair, LLC Leon & Sophia Xu 31704 53rd Ave SW Federal Way, WA 98023 CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Jim Ferrell, Mayor Re; Clearing, Grading, Erosion Control, Storm Sewer, and Frontage Improvements, File #ZS-105750-000-00-EN, Xu Short Plat; 1909 SW 356th St AUTHORIZATION TO PROCEED Dear Mr. and Mrs. Xu, The project referenced above has been reviewed for consistency with the Federal Way Revised Code (FWRC) and other standards, policies and regulations of the Department of Public Works. All applicable fees must be paid and a performance bond submitted to guarantee the performance of required civil -related work. The amount due for fees and deposits is $7,867.00 (see the attached invoice for an itemized list). A Certificate of Insurance from the contractor, naming the City of Federal Way as an additional insured must be submitted as well. The plans for the improvements referenced above are hereby conditionally approved. Construction of the improvements may commence when the conditions of this letter have been fulfilled. Prior to starting work, a pre -construction conference with Public Works must be held. To schedule a pre -construction conference, call Kevin Peterson at (253) 835-2734. Please call a minimum of three working days in advance of scheduling the pre -construction meeting. The developer's on -site construction superintendent must attend this meeting in order to receive the approved plans. Additional items that may be required prior to starting construction or final project approval are as follows: 1. All utility agencies have been notified at least two working days prior to any excavation (Call Before You Dig: 1-800-424-5555). 2. All materials and construction shall conform to the current edition of the City of Federal Way Public Works Development Standards, Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge and Municipal Construction, King County Road Standards, and the King County Surface Water Design Manual. 3. The applicant must contact Lakehaven Utility District or Tacoma Public Utilities for water and sewer requirements and/or permits. 4. All temporary traffic diversions shall be signed in compliance with the current edition of the Manual on Uniform Traffic Control Devices. A traffic control plan shall be submitted to the Public Works Department .for review and approval. The plan shall be delivered at least seven days prior to the actual diversion. 5. Three sets of catalog cuts for the following street light system components, conforming to the City of Federal Way Street Light Guidelines, shall be submitted to the Public Works Department for review and authorization: 1. Pole, 2. Service Panel, 3. Luminaire, 4. Photoelectric Control, 6. Lamp. 6. Installation of improvements shall not interfere with any work being performed under a City of Federal Way contract. Rather, it shall be scheduled to prevent any delay or extra cost to a City project. 7. Final Review: Following construction approval of the improvements, and prior to receiving final approval, an "as -built" mylar original (free of stick -on notes and shading), two sets of paper copies, and one CD with CAD file shall be submitted by the applicant's engineer along with any necessary easement or other legal documents. These documents shall be submitted to the Public Works Department and reviewed by the Law Department prior to final approval. 8. The short plat documents cannot be recorded prior to the completion of the engineering improvements authorized for this project and the acceptance of the as -built submittal by the Public Works Department. If you have any questions or concerns regarding this letter, please call Kevin Peterson, Engineering Plans Reviewer at (253) 835-2734. Sincerely, Cole Ellio , P.E. Development Services Manager KP/CE: mt cc: Beyler Consulting, Attn: Landon Beyler, 7602 Bridgeport Way W, #3D, Lakewood, WA 98499 Leila Willoughby -Oakes, Associate Planner Project File Day File 1: \csdc\dots\save\22438622072. doc CITY OF � Federal Way September 25, 2019 Mayfair, LLC Attn: Leon & Sophia Xu 31704 53rd Ave SW Federal Way, WA 98023 CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cltyoffederalway.. com Jim Ferrell, Mayor RE: Permit #15-105750-00-EN; XU SHORT PLAT,1909 SW 356TH ST Wet Weather Construction Requirements Dear Mr. Xu: The wet weather season officially begins on October 11. Any site with exposed soils is subject to the `Wet Season Requirements' per the King County Surface Water Design Manual, Appendix D, page D-113. Specifically, please note that the allowed time that a disturbed area may remain unworked without cover is reduced to two (2) consecutive work days and that stockpiles and steep cut/fill slopes are to be protected if unworked for more than twelve (12) hours. Additionally, all areas that are to be unworked during the wet season shall be seeded within one (1) week of the start of the wet season. Please review any site -specific requirements, instructions, notes, and details that are included on your approved plans. Some sites have wet weather restrictions that prohibit certain construction activities. These also will be noted on the plans. Also, as a reminder, the approved City of Federal Way work hours are listed below. Work outside of the approved hours requires prior approval. Monday through Friday: • Outside Right of Way: 7:00 AM through 8:00 PM • Inside Right of Way: 8:30 AM through 3:00 PM Saturday: • Outside Right of Way: 9:00 AM through 8:00 PM • Inside Right of Way: No work is permitted Sunday: 0 No work is permitted City Observed Holidays: • No work is permitted. The upcoming City -observed Holiday schedule is as follows: o November 11, Veteran's Day; o November 28 & 29, Thanksgiving; o December 25, Christmas Day; o January 1, New Year's Day; o January 20, Martin Luther King, Jr. Day o February 17, President's Day If you have any questions, please do not hesitate to contact either George Hauser at 253-835- 2741 or myself at 253-835-2734. Sincerely, Kevin Peterson Sr. Engineering Plans Reviewer KP:ss cc: George Hauser, Public Works Construction Inspector Project Filet kp ) Day File CITY OF CITY HALL • 33325 8th Avenue South Federal Way Federal Way, WA 53) 8335-7000 Centered on Opportunity www.cityoffederalway.com Jim Ferrell, Mayor June 3, 2019 Mayfair, LLC Sophia Xu 31704 53rd Ave SW Federal Way, WA 98023 RE: Permit #15-105750-00-EN; Xu Short Plat Dust Control Construction Requirements Dear Mrs. Xu: The dry weather season has begun. Any site with exposed soils is subject to the Erosion and Sediment Control requirements per the King County Surface Water Design Appendix D. Specifically, please note that in accordance with KCSWDM Appendix D Section 2.1, the allowed time that a disturbed area may remain unworked without cover cannot exceed seven (7) consecutive work days and that stockpiles and steep cut/fill slopes are to be protected if unworked for more than twelve (12) hours. Additionally, all areas that are prone to dust must be controlled using an approved BMP method (Chemical, structural or mechanical). Please review any site specific requirements, instructions, notes, and details that are included on your approved plans. Also as a reminder, the approved City of Federal Way work hours are listed below. Work outside of the approved hours requires prior approval. Monday through Friday: • Outside Right of Way: 7:00 AM through 8:00 PM • Inside Right of Way: 8:30 AM through 3:00 PM Saturday: • Outside Right of Way: 9:00 AM through 8:00 PM • Inside Right of Way: No work is permitted Sunday: * No work is permitted City Observed Holidays: * No work is permitted \\CFWFILEI\Applications\CSDC\PROD\dots\save\136330_79213_28133749 DOC If you have any questions, please do not hesitate to contact either George Hauser at 253-261-5257 or myself at 253-835-2730. Sincerely, Cole Elliott, PE Development Services Manager cc: George Hauser, Public Works Construction Inspector Project File Day File t\CFWFILE 1\Applications\CSDC\PROD\docs\save\ 135330_79213_28133749.DOC CITY OF Federal Way Centered or Opportunity May 16, 2018 Tacoma Power Attn: Dan Reed 3628 S 35 h St Tacoma, WA 98409-3192 RE. XU Short Plat, Tacoma Power Project # U1925P01 Dear Mr. Reed: CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Jim Ferrell, Mayor The City of Federal Way Public Works Department is in receipt of your May 7, 2018 letter, requesting identification of all City -owned underground facilities located in the vicinity of the above -referenced project. Please find enclosed two (2) mark-ups of your plan. One showing the location and bury depth of the City - owned storm drainage system, and the other showing the approximate location of the electrical conduits and junction boxes for the City -owned street light system that are within or near your proposed project limits. The information provided is the best available, based on as -built and/or approved construction drawings of the systems shown. To the best of our knowledge, no other City -owned underground facilities are known to exist within the project limits. As you know, it's the responsibility of the developer/contractor to call (811) for all underground utility locations prior to any exaction activities. If you have any questions, please do not hesitate to contact me at (253) 835-2734. Sincerely, Kevin Peterson Engineering Plans Reviewer Enclosure: Markup copies Tacoma Power project plans cc: Project File (kp) \\CFWFILEI\Applications\CSDC\PROD\docs\save\136330_77728. t5093726.DOC 3628 --uth 35th Street TACOMA POWER May 7, 2018 Tacoma, Washington 98409-3192 TACOMA PUBLIC UTILITIES Planning & Development Services 2 50% City of Federal Way Public Works 2 100% PSE 2 100% Comcast Cable 2 100% CenturyLink 2 100% Lakehaven Water and Sewer District 2 50% Beyler Consulting 2 50% Gentlemen: GL ED Tacoma Power is currently conducting an engineering study of the interferences that may be encountered in connection with a proposed underground electric power installation. We want to take all possible precautions in the design to eliminate, or at the least reduce to a minimum, interferences or unnecessary relocation of other structures. Your advising of any interferences that may exist will reduce the possibility of accidental damage to your facilities or possible contact with our high voltage cable during any future construction. Enclosed are plans for Xu Short Plat, U1925P01 Please mark on one set of plans the location, elevation and other pertinent information for your underground facilities within the limits of this project, and return them to me at your earliest convenience. Sigcer ly, Dan L. Reed (253) 502-8292 New Services Engineering Power Division Cover Letter:Report Enc. CITY OF CITY HALL Federal WayFederal Way, , Avenue South -O;k Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Jim Ferrell, Mayor September 13, 2017 Leon & Sophia Xu 31704 53rd Ave SW Federal Way, WA 98023 Re: Xu Short Plat Folder # 15-105750-000-00-En, Wet Weather Construction Requirements Dear Mr. and Mrs. Xu: The wet weather season officially begins on October I". Any site with exposed soils is subject to the `Wet Season Requirements' per the King County Surface Water Design Manual, Appendix D, page D-113. Specifically, please note that the allowed time that a disturbed area may remain unworked without cover is reduced to two (2) consecutive work days, and that stockpiles and steep cut/fill slopes are to be protected if unworked for more than twelve (12) hours. Additionally, all areas that are to be unworked during the wet season shall be seeded within one (1) week of the start of the wet season. Please review any site specific requirements, instructions, notes and details that are included on your approved plans. Some sites have wet weather restrictions that prohibit certain construction activities; these also will be noted on the plans. Also as a reminder, the approved City of Federal Way work hours are listed below; work outside of the approved hours requires prior approval. Monday through Friday: • Outside Right of Way: 7:00 AM through 8:00 PM • Inside Right of Way: 8:30 AM through 3:00 PM Saturday: • Outside Right of Way: 9:00 AM through 8:00 PM • Inside Right of Way: No work is permitted Sunday: • No work is permitted City Observed Holidays: • No work is permitted \\C FW F[LE 1\Applications\CS DC\PROD\docs\save\ 136330_76531_12141107.doe If you have any questions, please do not hesitate to contact either Bill McCollum at 253-835-2741 or myself at 253-835-2730. Sincerely, Cole Eli , P.E. Development Services Manager CE:av cc: Bill McCollum, Public Works Construction Inspector Project File Day File \\CFWFILE 1\Applications\CSDC\PROD\docs\save\136330_76531_12141107.doc CITY OF Federal Way RECEIVED NO22015 PERMIT APPLICATION CITY OF FEDERAL WAY c CDS PERMIT NUMBER ' S rr _ TARGET DATE SITE ADDRESS SUITE/UNIT # 1909 SW 356th STREET PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL # $ RS9.6 _2 5 2 1 0 3 -- 9 0 0 4 TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION X ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT X U SHORT PLAT SHORT PLAT PLAT EXISTING PARCEL INTO 5 SINGLE FAMILY LOTS. PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME MAYFAIR, LLC PRIMARY PHONE II PROPERTY OWNER 253.666.4985 MAILING ADDRESS 31704 53rd Ave SW E-MAIL shiwy166@hotmail.com CITY STATE ZIP FEDERAL WAY WA 98023 - -.. NAME - - PHONE f TO BE DETERMINED MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # PRIMARY PHONE NAME MAYFAIR, LLC. APPLICANT MAILING ADDRESS 31704 53rd Ave SW E-M ATT' shiwy166@hotmail.com CITY f STATE I ZIP FAX FEDERAL WAY I WA 98023 PROJECT CONTACT NAME BEYLER CONSULTING LLC (LAND �o ,V 5 Y PHONE )1-4157 (The individual to receive and to MAILING ADDRESS 7602 BRIDGEPORT WAY W, STE 31 �BEYLERCONSULTING.COM respond all correspondence CITY STA7 concerning this application) LAKEWOOD WP 6-3950 _ NAME �'jiG NER-FINANCED PROJECT FINANCING 1• Required value of $5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or autharized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. - SIGNATURE: -- ,e DATE PRINT NAME: LL v% V Bulletin #100 — January 1, 2013 Page 1 of 3 k:\Handouts\Pernut Application CITY OF t Federal Way August 18, 2016 Mayfair, LLC Leon & Sophia Xu 31704 53rd Ave SW Federal Way, WA 98023 CITY HALL 33325 8th Avenue South Federal Way, WA 98003-6325 (253) 835-7000 www. cityoffederalway.. com Jim Ferrell, Mayor Re: Clearing, Grading, Erosion Control, Storm Sewer, and Frontage Improvement File #15-105750-000-00-EN, Xu Short Plat, 1909 SW 356th St AUTHORIZATION TO PROCEED Dear Mr. and Mrs. Xu, The project referenced above has been reviewed for consistency with the Federal Way Revised Code (FWRC) and other standards, policies and regulations of the Department of Public Works. All applicable fees must be paid and a performance bond submitted to guarantee the performance of required civil -related work. The amount due for fees and deposits is $7,867.00 (see the attached invoice for an itemized list). A Certificate of Insurance from the contractor, naming the City of Federal Way as an additional insured must be submitted as well. The plans for the improvements referenced above are hereby conditionally approved. Construction of the improvements may commence when the conditions of this letter have been fulfilled. Prior to starting work, a pre -construction conference with Public Works must be held. To schedule a pre -construction conference, call Kevin Peterson at (253) 835-2734. Please call a minimum of three working days in advance of scheduling the pre -construction meeting. The developer's on -site construction superintendent must attend this meeting in order to receive the approved plans. Additional items that may be required prior to starting construction or final project approval are as follows: 1. All utility agencies have been notified at least two working days prior to any excavation (Call Before You Dig: 1-800-424-5555). 2. All materials and construction shall conform to the current edition of the City of Federal Way Public Works Development Standards, Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge and Municipal Construction, King County Road Standards, and the King County Surface Water Design Manual. 3. The applicant must contact Lakehaven Utility District or Tacoma Public Utilities for water and sewer requirements and/or permits. 4. All temporary traffic diversions shall be signed in compliance with the current edition of the Manual on Uniform Traffic Control Devices. A traffic control plan shall be submitted to the Public Works Department .for review and approval. The plan shall be delivered at least seven days prior to the actual diversion. 5. Three sets of catalog cuts for the following street light system components, conforming to the City of Federal Way Street Light Guidelines, shall be submitted to the Public Works Department for review and authorization: 1. Pole, 2. Service Panel, 3. Luminaire, 4. Photoelectric Control, 6. Lamp. 6. Installation of improvements shall not interfere with any work being performed under a City of Federal Way contract. Rather, it shall be scheduled to prevent any delay or extra cost to a City project. 7. Final Review: Following construction approval of the improvements, and prior to receiving final approval, an "as -built" mylar original (free of stick -on notes and shading), two sets of paper copies, and one CD with CAD file shall be submitted by the applicant's engineer along with any necessary easement or other legal documents. These documents shall be submitted to the Public Works Department- and reviewed by the Law Department prior to final approval. 8. The short plat documents cannot be recorded prior to the completion of the engineering improvements authorized for this project and the acceptance of the as -built submittal by the Public Works Department. If you have any questions or concerns regarding this letter, please call Kevin Peterson, Engineering Plans Reviewer at (253) 835-2734. Sincerely, Cole Ellio , P.E. Development Services Manager KP/CE: mt cc: Beyler Consulting, Attn: Landon Beyler, 7602 Bridgeport Way W, #313, Lakewood, WA 98499 Leila Willoughby -Oakes, Associate Planner Project File Day File 1: \csdc\docs\save\22438622072.doc ��� ersary February 9, 2016 Jim Ferrell, Mayor Brandon Loucks Emailed: brandon(7beylerconsulting.cam 7602 Bridgeport Way West Lakewood, WA 98499 RE: File No. 15-105750-00-EN; PLANNING REVIEW LETTER (11T & 2"D REVIEW) Xu Short Plat, 1909 SW 3561h Street, Federal Way (Parcel No. 252103 9004) Dear Mr. Loucks: The Community Development Department, Planning Division, has reviewed the engineering and landscaping plans submitted for the above -referenced project (15-105750-EN). Staff members reviewed an engineering plan set received November 12, 2015, and revised plans resubm itted on January 7,' 2016. The applicant submitted a landscaping plan separately on December 3, 2015. Planning met with the applicant on December 8, 2015, and a comment memo on January 25, 2016. PLANNING DIVISION (Leila W-Oakes, 253-835-2644, Leila. Willousthbv-Oakcs(a_:citv ol'fideralway.com) l . Depict an additional tree unit (either planted or retained) of 1" to 6" diameter breast height or mature canopy 450-1,250 sf, a total of 34 tree units (FWRC 19.120.130(3)). 2. Sheet C1.0 shows a 1-3 foot retaining wall. Retaining walls should comply with FWRC 19.120.120 requirements and include: Sheets show differing wall heights (1-3 i-t. and 1-5 ft.) a. A composition of brick, rockery, textured or patterned concrete complementing buildings/site development. b. The retaining wall on Tract A and Lot 1 can locate in the required yard. 3. On the final recorded document list the true sizes of Lot 3 and 4. For SFR lots, lot areas do not include access easements (FWRC 19.05.120). 4. Pursuant to FWRC 18. 60.070 `Subdivision improvements -Sewage disposal,' the applicant must either provide a sanitary sewer (Lakehaven) or on -site septic sewage disposal systems for all lots approved by the King County Public Health. Currently, a survey error/boundary line hiatus prevents the creation of a utility easement for sewer hook-up from Lot 5 to Hampstead Green Division II for Lots 4 and 5. If accessing a gravity sewer from Lot 5, the boundary line must be resolved before recording. A letter is enclosed from LUD on the options related to sanitary sewer system connections. 5. Prior to recording, the applicant shall pay 13 percent of the most recent assessed land value of the subject property as the fee -in -lieu of open space. 6. Prior to recording, all existing structures proposed for removal shall be removed preventing nonconformances. 7. Before recording, plant a 10-foot landscape buffer of Type III landscaping on `Tract A' to the satisfaction of the Planning Division. 33325 8th Avenue South, Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Mr. Loucks February 8.2016 Page 2 of 2 8. Prior to record ing/dttring construction permitting, the applicant shall place a note on the short plat drawing identifying the total tree units required for each lot as identified in the Xu Short Plat `Findings of Fact,' at a rate of 25 tree traits per acre. Final Drawing. 9. Prior to recording, the applicant shall provide a note on the plat that the stormwater facility containing the landscaping buffer strip (Tract A) shall be equally owned and maintained by the owners of the Xu Short Plat. Final Drawing. 10. Prior to recording, the applicant shall provide a note on the plat that the private road and utility easement shall be the responsibility, equally owned, and maintained by the owners of Lots 4 and 5 of the Xu Short Plat. Final Drawing. 11. Prior to recording, the applicant shall place a note on the plat restricting vehicle access for Lot 3 off of 20t1i Avenue SW only (cannot use the shared access and utility easement). 12. In the title report, after filing the short plat, Lot 5 shall disclose the plat boundary survey discrepancy per RCW 58.17.255 if not resolved. Resubmit title excerpt. 13. Prior to recording, the applicant shall provide a note on the plat stating administrative approvals are required by the Director of Community Development in order to remove or modify vegetation in the landscape strip known as Tract `A.' Final Drawing. 14. Per conversations with the applicant, the Planning Division approves the removal of existing trees to accommodate new Lakehaven servicing arrangements, as long as each lot maintains a minimum of 25 tree [.[nits/per acre. Please revise the Sheet TR 1.0 with changes and related tables. CLOSING When resubmitting requested information, please provide a written response to each of the above - referenced items and three (3) copies of corrected full size plans with the enclosed resubmittal form. PROJECT CANCELLATION Pursuant to FWRC 19.15.050, if an applicant fails to provide additional information to the city within 180 days of being notified that such information is requested, the application shall be deemed void. If you have any questions regarding this letter or your development project, please contact Leila Willoughby -Oakes at 253-835-2644, or lei la.%villoughby-oakesacitvoffederalway.cam. Sincerely Leila Willot.lghby-Oakes Associate Planner enc; Resubmittal Form Final Plat Submittal Requirements (Information Only) Lakehaven Utility District Letter (Servicing Options) Redlined Plans c: Leon and Sophia Xu, Mayfair LLC, 31704 53rd Avenue SW, Federal Way, WA 98023 Kevin Petersen, Engineering Plans Reviewer 15-1057 i0-00-EN Doc. I. D. 72072 SUBDIVISION Issued By: *, CHICAGO TITLE INSURANCE COMPANY Guarantee/Certificate Number: 0014432-06 Revision Second Guarantee CHICAGO TITLE INSURANCE COMPANY P..7-SUBMITTED a corporation, herein called the Company GUARANTEES Beyler Consulting MAR 0 7 2016 CITY OF FEDERAL WAY CDS herein called the Assured, against actual loss not exceeding the liability amount stated in Schedule A which the Assured shall sustain by reason of any incorrectness in the assurances set forth in Schedule A. LIABILITY EXCLUSIONS AND LIMITATIONS 1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A or with respect to the validity, legal effect or priority of any matter shown therein. 2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount set forth in Schedule A. Please note carefully the liability exclusions and limitations and the specific assurances afforded by this guarantee. If you wish additional liability, or assurances other than as contained herein, please contact the Company for further information as to the availability and cost. Chicago Title Company of Washington 701 5th Avenue, Suite 2300 Seattle, WA 98104 .�r Countersigned By:� • r •- SQAZ Authorized Officer or Agent Chicago Title Insurance Company By: Attest: PWP4-' President Secretary Subdivision Guarantee/Certificate Printed: 02.16.16 @ 04:16 PM Page 1 WA-CT-FNSE-02150.622476-SPS-1-16-0014432-06 CHICAGO TITLE INSURANCE COMPANY Liability $1,000.00 GUARANTEE/CERTIFICATE NO. 0014432-06 REVISION Second Guarantee ISSUING OFFICE: Title Officer: Commercial / Unit 6 :hicago Title Company of Washington 701 5th Avenue, Suite 2300 Seattle, WA 98104 Main Phone: (206)628-5610 Email: CTISeaTitieUnit6@ctt.com SCHEDULE A Effective Date: February 11, 2016 at 08:00 AM The assurances referred to on the face page are: Premium $350.00 Tax $33.25 That, according to those public records which, under the recording laws, impart constructive notice of matter relative to the following described property: SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF Title to said real property is vested in: Mayfair LLC, a Washington Limited Liability Company subject to the matters shown below under Exceptions, which Exceptions are not necessarily shown in the order of their priority. END OF SCHEDULE A Subdivision Guarantee/Certificate Printed: 02.16.16 @ 04:16 PM Page 2 WA-CT-FNSE-02150.622476-SPS-1-16-0014432-06 EXHIBIT "A" Legal Description That portion of Government Lot 2, Section 25, Township 21 North, Range 3 East, W.M., in King County, Washington, described as follows: Beginning at a point 200 feet South and 330 feet East of the Northwest corner of Government Lot 2; Thence South 180 feet; Thence East 330 feet to the west line of the plat of Hampstead Green Division 2, recorded in Volume 159 of Plats, pages 51 and 52; Thence, along said west line, North 125 feet; Thence West 165 feet to the west line of the east 825 feet of said Government Lot 2;; Thence North 55 feet; Thence West 165 feet to the Point of Beginning; Except the West 30 feet thereof for road; Together with that portion of Government Lot 2, Section 25, Township 21 North, Range 3 East, W.M., in King County, Washington, described as follows: Beginning at a point lying 30 feet South and 330 feet east of the Northwest corner of said Government Lot 2, Thence South 170 feet; Thence East 165 feet to the west line of the east 825 feet of said Government Lot 2; Thence, along said west line, North 170 feet; Thence West 165 feet to the Point of Beginning; Except the West 30 feet of road; And Except that portion thereof conveyed to the City of Federal Way for S.W. 356th Street by deed recorded under recording no. 9112061614. Subdwisian Guarantee/Certificate Printed: 02.16.16 @ 04:16 PM Page 3 WA-CT-FNSE-02150.622476-SPS-1-16-0014432-06 CHICAGO TITLE INSURANCE COMPANY 2 3. 4. 5 SCHEDULE B SPECIAL EXCEPTIONS GUARAN-i EEXERTIFICATE NO. 0014432-06 REVISION Second Guarantee Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Granted to: City of Tacoma Purpose: Poles and wires Recording Date: May 1, 1936 Recording No.: 2895737 Affects: Portion of said premises and other property Easement(s) for the purpose(s) shown below and rights incidental thereto as condemned in, Court: King County Superior Court Case No.: 89-2-25115-9 In favor of: City of Federal Way Purpose: Slopes and fills and right to enter Affects: A Northerly portion of said premises abutting Southwest 356th Street Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Purpose: Landscape and greenbelt Recording Date: November 1, 1994 Recording No.: 9411010672 Affects: The South 10 feet of the West 175 feet of said premises Agreement Between: Earl and Mary Chambers, husband and wife And: Allan and Vicki Veldman, husband and wife Recording Date: October 20, 1994 Recording No.: 9410200666 Regarding; Common boundary Right to make necessary slopes for cuts or fills upon property herein described as granted or reserved in deed In favor of: King County Recording Date: May 10, 1943 Recording No.: 3308563 General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties): Year: 2016 Tax Account No.: 252103-9004-00 Levy Code: 1205 Assessed Value -Land: $129,000.00 Assessed Value -Improvements: $88,000.00 General and Special Taxes: Billed: $3,257.93 Paid: $0.00 Unpaid: $3,257.93 Subdivision Guarantee/Certificate Printed: 02.16.16 @ 04:17 PM Page 4 WA-CT-FNSE-02150.622476-SPS-1-16-0014432-06 CHICAGO TITLE INSURANCE COMPANY �l GUARAN`1 itE/CERTIFICATE NO. 0014432-06 REVISION Second Guarantee SCHEDULE B (continued) 7. Please be advised that our search did not disclose any open mortgages/deeds of trust of record. If you should have knowledge of any outstanding obligation, please contact the Title Department immediately for further review prior to closing. 8. Terms and conditions of the limited liability company agreement for Mayfair LLC. 9. Your application for title insurance was placed by reference to only a street address or tax identification number. Based on our records, we believe that the legal description in this report covers the parcel(s) of Land that you requested. If the legal description is incorrect, the seller/borrower must notify the Company and/or the settlement company in order to prevent errors and to be certain that the correct parcel(s) of Land will appear on any documents to be recorded in connection with this transaction and on the policy of title insurance. Note: FOR INFORMATIONAL PURPOSES ONLY: The following may be used as an abbreviated legal description on the documents to be recorded, per Amended RCW 65.04.045. Said abbreviated legal description is not a substitute for a complete legal description within the body of the document: Portion of Government Lot 2 of Section 25-21-3. Tax Account No.: 252103-9004-00 Note: Any map furnished with this Commitment is for convenience in locating the land indicated herein with reference to streets and other land. No liability is assumed by reason of reliance thereon. END OF SCHEDULE B Subdivision Guarantee/Certificate Printed: 02.16.16 @ 04:17 PM Page 5 WA-CT-FNSE-02150.622476-SPS-1-16-0014432-06 RESUBMITTED JAN 21 2015 CHICAGO Tffff CDSRAL WAY COMPANY OF WASHINGTON *C' SUPPLEMENT NO. 1 Sophia Title Officer: Commercial / Unit 6 Mayfair LLC, a Washington Limited Liability Company Property: APN/Parcel ID: 252103-9004-00 Borrower(s): Mayfair LLC, a Washington Limited Liability Company Seller(s): Order No.: 0014432-06 The above numbered report with an Effective Date of December 29, 2014 including any supplements or amendments thereto, is hereby modified and/or supplemented in order to reflect the following: The effective date is amended as follows: The Effective Date of May 16, 2014 is hereby amended to be: December 29, 2014 at 08:OOAM The following items/notes have been changed on your report: ITEMS: 6. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties): Year: 2014 Tax Account No.: 252103-9004-00 Levy Code: 1205 Assessed Value -Land: $101,000.00 Assessed Value -Improvements: $84,000.00 General and Special Taxes: Billed: $3,000.76 Paid: $3,000.76 Unpaid: $0.00 For title inquiries, please contact the issuing office: Chicago Title Company of Washington 701 5th Avenue, Suite 2300 Seattle, WA 98104 Supplemental Date: January 7, 2015 Countersigned By: Authorized Officer or Agent Phone: (206)628-5610 Fax: (206)628-9717 Email: CTISEATitleUnit6@ctt.com Supplemental Printed: 01.07.15 @ 09:03AM by MH SSCORPD5190.doc / Updated: 10.30.14 Page 1—0014432-06 SUBDIVISION Guarantee/Certificate Number: Issued By: CHICAGO TITLE INSURANCE COMPANY 0014432-06 CHICAGO TITLE INSURANCE COMPANY a corporation, herein called the Company GUARANTEES Beyler Consulting herein called the Assured, against actual loss not exceeding the liability amount stated in Schedule A which the Assured shall sustain by reason of any incorrectness in the assurances set forth in Schedule A. LIABILITY EXCLUSIONS AND LIMITATIONS 1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A or with respect to the validity, legal effect or priority of any matter shown therein. 2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount set forth in Schedule A. Please note carefully the liability exclusions and limitations and the specific assurances afforded by this guarantee. If you wish additional liability, or assurances other than as contained herein, please contact the Company for further information as to the availability and cost. Chicago Title Company of Washington 701 5th Avenue, Suite 2300 Seattle, WA 98104 Countersigned By:'ero Authorized Officer or Agent Chicago Title Insurance Company By: Attest: President Z--� Secretary Subdivision GuarantWCeMflcale Ptinted: 05.28.14 @ 10:14AM Page 1 WA-CT-FNSE-02150.622476-SPS-1-14-0014432-06 CHICAGO TITLE INSURANCE COMPANY GUARANTEE/CERTIFICATE NO.0014432-06 ISSUING OFFICE Title Officer: Commercial / Unit 6 Chicago Title Company of Washington 701 5th Avenue, Suite 2300 Seattle, WA 98104 Main Phone: (206)628-5610 Email- CTISeaTitleUnit6 ctt.cam SCHEDULE A Liability Premium Tax $1,000.00 $350.00 $33.25 Effective Date: May 16, 2014 at 08:OOAM The assurances referred to on the face page are: That, according to those public records which, under the recording laws, impart constructive notice of matter relative to the following described property: SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF Title to said real property is vested in: Mayfair LLC, a Washington Limited Liability Company subject to the matters shown below under Exceptions, which Exceptions are not necessarily shown in the order of their priority. END OF SCHEDULE A Subdivision Guarantee/Certificate Printed: 05.28.14 @ 10:14AM Page 2 WA-CT-FNSE-02150.622476-SPS-1-14-0014432-06 EXHIBIT "A" Legal Description Beginning 200 feet South, 330 feet East of the Northwest corner of Government Lot No. 2, Thence South 180 feet; Thence East 330 feet; Thence North 125 feet; Thence West 165 feet; Thence North 55 feet; Thence West 165 feet to Point of Beginning, Except the West 30 feet for road all located within the Northwest Quarter of the Southeast Quarter of the Northeast Quarter of Section 25, Township 21 North, Range 3 East, Willamette Meridian, in King County, Washington, and Beginning 30 feet South, 330 feet East of the Northwest corner of Government Lot No. 2, Thence South 170 feet; Thence East 165 feet; Thence North 170 feet; Thence West 165 feet to Point of Beginning, Except the West 30 feet of road, all located within the Northwest Quarter of the Southeast Quarter of the Northeast Quarter of Section 25, Township 21 North, Range 3 East, Willamette Meridian, in King County, Washington; and Except that portion thereof conveyed to the City of Federal Way by deed recording no. 9112061614. Guarantee/Cerlirrcale Printed: 05.28.14 @ 10:14AM Page 3 WA-CT-FNSE-02150.622476-SPS-1-14-0014432-06 CHICAGO TITLE INSURANCE COMPANY GUARANTEE/CERTIFICATE NO.0014432-06 SCHEDULE B SPECIAL EXCEPTIONS Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Granted to: City of Tacoma Purpose: Poles and wires Recording Date: May 1, 1936 Recording No.: 2895737 Affects: Portion of said premises and other property 2. Easement(s) for the purpose(s) shown below and rights incidental thereto as condemned in, Court: King County Superior Court Case No.: 89-2-25115-9 In favor of: City of Federal Way Purpose: Slopes and fills and right to enter Affects: A Northerly portion of said premises abutting Southwest 356th Street 3. Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document: Purpose: Landscape and greenbelt Recording Date: November 1, 1994 Recording No.: 9411010672 Affects: The South 10 feet of the West 175 feet of said premises 4. Agreement Between: Earl and Mary Chambers, husband and wife And: Allan and Vicki Veldman, husband and wife Recording Date: October 20, 1994 Recording No.: 9410200666 Regarding; Common boundary 5. Right to make necessary slopes for cuts or fills upon property herein described as granted or reserved in deed In favor of: King County Recording Date: May 10, 1943 Recording No.: 3308563 6. General and special taxes and charges, payable February 15, delinquent if first half unpaid on May 1, second half delinquent if unpaid on November 1 of the tax year (amounts do not include interest and penalties): Year: 2014 Tax Account No.: 252103-9004-00 Levy Code: 1205 Assessed Value -Land: $101,000.00 Assessed Value -Improvements: $84,000.00 General and Special Taxes: Billed: $3,000.76 Paid: $1,500.38 Unpaid: $1,500.38 Printed: 05.28.14 @ 10:14AM Subdivision Guarantee/Certificate Page 4 WA-CT-FNSS-02150.62247�SPS•1-14-0014432-06 CHICAGO TITLE INSURANCE COMPANY GUARANTEE/CERTIFICATE NO.0014432-06 SCHEDULE B (continued) 7. Please be advised that our search did not disclose any open mortgages/deeds of trust of record. If you should have knowledge of any outstanding obligation, please contact the Title Department immediately for further review prior to closing. 8. Any unrecorded leaseholds, right of vendors and holders of security interests on personal property installed upon the Land and rights of tenants to remove trade fixtures at the expiration of the terms. Terms and conditions of the limited liability company agreement for Mayfair LLC. 10. Your application for title insurance was placed by reference to only a street address or tax identification number. Based on our records, we believe that the legal description in this report covers the parcel(s) of Land that you requested. If the legal description is incorrect; the selleriborrower must notify the Company and/or the settlement company in order to prevent errors and to be certain that the correct parcels) of Land will appear on any documents to be recorded in connection with this transaction and on the policy of title insurance. Note: FOR INFORMATIONAL PURPOSES ONLY: The following may be used as an abbreviated legal description on the documents to be recorded, per Amended RCW 65,04.045. Said abbreviated legal description is not a substitute for a complete legal description within the body of the document: Portion of the Southeast quarter of the Northeast quarter of Section 25-21-3. Tax Account No.: 252103-9004-00 Note: Any map furnished with this Commitment is for convenience in locating the land indicated herein with reference to streets and other land. No liability is assumed by reason of reliance thereon. END OF SCHEDULE B Subdivision Guarantee/Certificate Printed: 05.28.14 @ 10:14AM Page 5 WA-CT-FNSE-02150.622476-SPS-1 -14-0014432-05 Assessor -Map Page 1 of 1 e i a0 i 26 1iM 720D30 D24 sas-19-42e 100 2.75 N 0260 50 0Z 3 8 AN 37,i9 42.41 ;; V Nsv eNIi �5-3°1 09 s S.SW 3SSth PI 355TH P9031. SW 355TH PL to ' 03.10 ' a 961H04 2.1041 2 2.21 AC 9050 i @ 901G { (1' 154_58 30096-10' aat 7t °t o IYCL:rL tw 640105 0510-12' v v 21 707 5-12• — 15 30 30 a• 4 T LA 243324 = 9020 N 26250E y 9027 « O N Y h ti 4' e 32 .,, 33 I 38 ¢ 97731 a •" 0 34 35 36 37 7"11 M « F 0320 �+ 6940/ 33J 'GISM 6c'OOf ofi0CIO 66004 ! 0-00 0 '.�id= f 97.44 a Q340 0350 0350 DIL70 yk 2s GO GP 45.95C $ iJ flfil), to K.c. FOR RDS. 4 rP.l ng - _ h St R" SW 356TH ST =112061614 Q 0 S.W. 356TH ST Fb'ial 35145E 9015 1G5 68'717 9 !10t14 [I j T 9052 �rt s 81-23-30 e L i 103551 • 0010 p� Q 83.85 alt..• IZ 2 sw ' ` 71961 Z 30030 65991 90 r1 W 6576R M 4 ° li �1i340 ma• '� ~ 1 a. 5 87-23- 55 3: r' aas rLLI. i ru 5 a=, r Q=73Y W 6933fJa.++59304 y 00S0 ti 81 s z> =Fp 1;2 �Q c .JwJ., r1 a 87-23-29 E 10 9 _ H .. � r c:" Zz160f 7188# SB71f �, N uit 90ag 0100 ss 0090 3 1.51 AC 9011 = 2 70831 T q 9, 48 9054 14. $ 67-23-30 E �' 125.07 fi ,, i5611' • N 87-23-3o I S 94-2 -39 E 177.1 (P.) ,�•. 72 0120 6S . 3 W 54751 2 r 3Jn:-r` 4 ti arr..s 6 Q, g r frt 83571 •a - a I]f�iin 5150i 51681 w0030 It 6928E :> 0440 01570 yti 5 0130 gz' 9 • 0020 ,lq, • 76 ci . s°r '*,�" 24 O 14,;.� ^, N This map has been copied from the public records and is provided d solely for the purpose of assisting In locating the premises. No liabilities are assumed for Inaccuracies contained herein or for lor A variations, If any, In dimensions, area or location of the premises the location of Improvements ascertained by actual survey. http://geo.sentrydynamics.netANA_King/assrmaplarge.aspx?parcelid=2521039004 5/23/2014 J to 20140418001459.001 When recorded return to: IntrGroup S >�W 815 S We11er Street, Suite 101 A 20140418001 3 Seattle, WA 98104 INTWIO UW a oen 73.ea GAGE-esi OF 0e2 o Kirk cotlrtxr, 1aF1 E2663238 04/18/2914 15: 22 TAX SALE =1141 ie.M PAGE-Nt OF NI QUIT CLAIM DEED Grantor. JIE ZiLAO, a married man as his gala and repuFu property Grantec: ~*FMR-t ve, a Wasbittirm Limited f iabiiity ComWy *MA`IFAtiLr1. V - AssesWs Tax Parcel NumWa(s): 2521039M AbbreviwA Ugal: BEG 30 FT S & 330 FT E OF N W COR GL 2 TH S 350 Fr TH E 330 Fr TH N 125 FP TH W 165 PT TH N 225 FT TH W 165 Fr TO BEG LESS STS 11JE aILANTOR(S) J1E Z AO, a married man as his sale and scparsec property, for no considemdon, tortvays and quh claims W hjARiFAJR bE0A.a Washington Limited Liability Company the follow! ngdescribed real estate, simtw in the County of King, State of Washington: T]r C— SEE ATTACHED Datod: Z-f 19 I Z O 1 y AE. ZHAO YAM ` W It IN �- I certify that I know or have salisrapary evldcnce that J14 ZHAO is the PmOn who appeorrd before me, and said paean acknowledged that ha sigrtcd this instrurnotandacknowlcslgad it la bo his f- and voluntary act for the mea rand porrposes mentInedd!In this histmM nt. Dorod: ,/ ! :? /,?& t I Notary Pebk Soft of Nhsklivoo J C ERCAMBRACK My APPoiMment Expl s Mar Z1. 2010 LPB 12-050)rev 12/2006 Pegg 1 or2 Order: Non -Order Search Doc: KC:2014 20140418001459 Page 1 of 2 Created By: bloedel Printed: 5/23/2014 10:23:46 AM PST 11 20140418001459.002 EXHIBIT A COMMENCING 200 FEET SOUTH, 330 FEET EAST OF THE NORTHWEST CORNER OF GOVERNMENT LOT NO 2, THENCE SOUTH ISO FEET; THENCE EAST 330 FEET; THENCE NORTH 125 FEET; THENCE WEST 165 FEET; THENCE NORTH 55 FEET; THENCE WEST 165 FEET TO POINT OF BEGINNING, EXCEPT THE WEST 30 FEET FOR ROAD ALL LOCATED WITHIN THE NORTH WEST QUARTER OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 25, TOWNSHIP 21 NORTH. RANGE 3 EAST. W.M., IN KING COUNTY, WASHIGNTON, AND COMMENCING 30 FEET SOUTH, 330 FEET EAST OF THE NORTHWEST CORNER OF GOVERNMENT LOT NO 2, THENCE SOUTH 170 FEET; THENCE EAST 165 FEET; THENCE NORTH 170 FEET; THENCE WEST 165 FEET TO POINT OF BEGINNING. EXCEPT THE WEST 30 FEET OF ROAD, ALL LOCATED WITHIN THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 25, TOWNSHIP 21 NORTI€, RANGE 3 EAST, W.M., IN KING COUNTY WASGHWGTON; PORTION OF GOVERNMENT, LOT 2, SECTION 25, TOWNSHIP 21 NROTH, RANGE 3 EAST LPB 12.05(1)tev I2=N Page 2 of 2 Order: Non -Order Search Doc: KC:2014 20140418001459 Page 2 of 2 Created By: bloedel Printed: 5/23/201410:23:46 AM PST ChicagoTitle Insurance Company FILED FOR RECORD AT AEOUEET OF IGINAL ............... ,........................ 0 THIS SPACE MOYIOEo too IECOWII'S ust r a 0 O O a 0 R 8 5 WHEN RECORDED RETURN TO Nwn... �a,rrell, MiCsun.�9�..,,_............ . REE6 MCCT,URE Aaa,a..�01 .Fifth Ave.,, Suite „3600 ctn.stx.,:ro Seatt.ie,.. WA 98104„ Quit Claim Deed THE GRANTOR Earl L. Chambers and Mary J. Chambers, husband and wife, and the marital community composed thereof, for and in consideration of ten dollars (610.00) the receipt of which is hereby acknowledged, conveyR and quit claims to the city of Federal Way, a municipal corporation the following described real estate, situated in the County of King together with all after acquired title of the grantor(s) therein: State of Washington, That real estate described in Exhibit A which is attached hereto and incorporated by reference herein. f]'rlcd November 1, lg 91 earl L. Chamberbida.rl, ary Il�ei„fu.,l• . lit 11'lrHJcnl I W H� - tie:rrb,rTl M~ g��� 6 STATE (IF L\',%S11l\GTfI?7 FTATF. OF \1'ASIIItiCTOt•1 w g t ot'\TY OF King COUNTY OF } � �$f iin Ihi+dav lwr•+,nally anprared lrfnry me On thin day of 10 hrfnre me. the unA,•nixmd, a NraUofry Public in and for the Stare et N'acli• ? Earl L. Chambers and Mary Jo Chambersingenn, duly cvmmilrionsdand sworn, prr+unlllly appratrd Ir, m,• Liu wn Iu b,• the Inahlidual described in and 1a w h„ rt,yuted the wirhm anti fnrrFuing instrument, and ' anel achnnwfedo-d that they signed the Heine In me mown In he the President and Serretarv. ac their fn•e and +,duntan- art and Bred. mrntinnetl respeNireiv.ot _ the r+-alu ary S fi-r III'- u+r+ and Inlrpu+r+ Ihnein tihie said in+I umrntto be diefrerandlrd to a0 sndtd"4 of said rorm,r r aimm fnr ihr uses and partiaus thrrem mrnttarir4. and an nath i,lalid that a authnnxrd tanecutrthe *.Rid InsltunWnl and that the seal rn'I•:ti uodri riy handasd vlErial seal thin affixed i+ the rnrporaleseal ofsaid roninretion. %%'itmws my hand and al&ial real hereto affixed the day and Year first ,� 1d / calf. j/ ............. ahnve wniten ... ..., ... ... 11"Mir in a��.,jR! the ' le of %wash• Nolary Public in and for the State of Washio+lan. Il inFe..ri e,.,, ne at T` - resi,lingat .... ... .. ... .. rI" J Do 40 _« LU. J & ASSOCIATES BURN HORS 2220 90UTH agTN wear FEDERAL WAY, WA. @8003 42001439.7744 I REVISED SW 356TH ST. R/W DESCRIPTIONS EARL CHAMBERS - PARCEL 13 DESCRIBED TOWNSHIP 21 NORTH, LCOUNTYSECTION RTHAT ANGEP3RTION EAST,OW.Mp1, KINGERNMENT WASHINGTON, FOLLOWS: :.' 8£GIHHING AT A $DINT ON THE CENTEFI.FNB OF SOUTHWEST 356TH STREET a AS SURVEYED BY RING COUNTY AND THE WEST LINE OF THE EAST 660 FEET OF SAID SECTION 25; THENCE 50UN ALONG SAID WEST LINE 24.34 OF COUNTY ROAD 90. PER SURVEY FEET TO THE SOUTHERN RIGHT -Or -HAY OF SAID izzovpNHENT RXT 2+ BY L.A. NICI(OLSON & SONS AND THE TRUE �- z POINT OF BEGINNING; 'THENCE CONTINUIHQ SOUTH 17.66 FEET ALONG SAID WEST LINE TO A LINE 42 FEET SOUTH AND PARALLEL WITH SAID CENTERLINP• OF SOUTHWEST 356TH STR99TI THENCE WEST 164.95 FEET a ALONG SAID FARALLEL LINE TO THE WEST LINE OF THE EAST 825 FEET LINE OF THE OF SAID S>rC'j10N 25; THENCE HORTd ALONG SAID WEST SOUTHERN RIGHT-OF-WAY OF COUNTY a EAST 825 FEET 19.18 FEET TO THE ROAD 907 PER SURVEY OF SAID GOVERNMENT LOT 2, BY L.A. NICKpLSOH J o i SONS; TIIEHCE EAST 165 FEET ALONG SAID SOUTHERN RIGHT-OF-WAY TO THE TRUE POINT OF BEGINNING. " = CONTAININQ 3036 SQ. FT. W 1- IL r; .d. EARL CHAMBERS - PARCEL 6 CL THAT PORTION OF GOVERNMENT LOT 2, SECTION 25, TOWNSHIP 21 NORTH, AS =� RANGE 3 EAST, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED Ito : FOLLOWS k'o N BEGINNING AT A POINT ON THE CENTERLINE OF SOUTHWEST 356TH STREET o Cr AS SURVEYED BY KING COUNTY AND THE WEST LINE OF THE EAST $25 SOUTFj ALONG SAID WEST LINE 22.82 W 0 c FEET OF SAID SECTION 25; THENCE FEET TO THE SOUTHER14 RIGHT -OF -HAY OF COUNTY ROAD 9ff7 PER SURVEY Lam' OF SAID GOVERNMENT LOT 2, BY L.A. NICKOLSON F SONS AND THE TRUE i- -. POINT OF BEGINNING: THENCE COHT'lniiiHfi 5OU'i8 19.I6 FEET ALvt+ <<�.. ^-' SAID WEST LINE TO A LINE 42 FEET SOVM ANDPARALLELSAID EST CENTERLINF, OF SOUTHWEST 356TH STREETtTHENCE L3WITH TO THE WEST I,INE OF THE EAST 960 FEEL' ALONG SAID pARAI.LEL LINE OF SAID SECTION 25; THENCE NORTH ALONG SAID WEST LINE OF THE EAST 460 PXijiT 20.+32 FEET TO THE SOUTHM RIGHT-OF-WAY OF COUNTY NICKOiSON ROAD 907 PEp SURVEY OF SAID GOVERNaENT JOT 2, BY L.A. i SONST THENCE FAST 135 FEET ALONG SAID SOUTHERN RIGHT -OF -HAY TO THE TRUE POINT OF BEGINNING. CONTAINING 2670 SR. FT - AUGUST 7, 1991 EXHIBIT -�L_._ D kd►f Apr 60 1446 As-r'no - at u, 4%ab 11UP% H ' Elmer L itnbbinti ,.:.:: for ;m ran .at Ri PA*t4a I f1d Vy. . sp rou:;a box 41 oiry 736. t09573'1 . Uge hoot WAY 1 1938 � j - �tey 6&f ter dais 13 1935 The underalmaj, Ownors of the _ to City ot'Rtia"Ma :.;• , tp grant to sp the right and prirl .�u s�� poled,: or�'.'�na, etxin�. �iv�sa►� ••°:;>:f. over and auroras the Old in kdwi°' :,` - :,: ' • �• :,'. s t% of jAuid coo at a pt 30 ft •sa. and 3d4 ft - eavt of i�he ixv . am af'.'_r lot 2 sea 23 t W 21 a r 3 eaa t it a r►� th- .ao 360f t . on & -LIM4 : 'll with the West IL ofsd lot S. th. dteat. 6bout. 300 ft to a p't wgh +a. 840 ft vast of the east 1i o�'•jd iot'12, �•1and ad lias tv bapll with north line ofsd lot; th no350 f�•.�a` a. A-ine p L:.•oiti} :the as or ed lay 8 to the ao 1 iue of t' Libo 00 r lad; co roes 11n3 t tb�a . q3. 4r bra; o1ed' etnd vrizoo to be as ,t 1 Opt 150' t't so of John,1ibo Co rued; sd.:iv�pd ° t reabl aax'e', to3eth with the. ppli'1.a1ao; +t4dus;�p►. _•. ; •• fr t .to tm to otga, rsialr.=tfAs,'ed pules tnd •irld alto tdlep and wires are to 'wi�pto in,su�h aitio�x :ed wil not interfere With stay ezi�stirig bldg -or: �t:svr' bldge 'ate Pl.s,gried�. . that can not to definitely loaajdd- on -the' Bove• des lend .. .,. Xierce oo uu :a gay 13 1955 by 14114red a Barg a p for va r-ab at Taeoma IS (FOR) 9 ORIGINAL }�r r �' •:. c.# 311 between Xer l and 11ary ' Agr,ewa,�t made an 1901 a'W, ��•=„•�chaMiDiire`hu�ancl uru! Mile, j hwrsinatter The CheebrYe l of Adoi and apt sxI"il�t,' �►ederai Mey, xi�nq County, Washington and Ph ouahard■ °•:,,:y,..,,., 4rttr�l�'n F'ia�i�t►erd�r.;,husbNnd and +ri�+w. [ heretnatter Thr Pl Btata v� of :b�Da ::Oh.►r►enu; 8.M ..,,axa1 way r county of Kin4. Tk1 Gh4 ratrex r'#s�r►1 ,or** convoy, dealars, and isPasa for the bet it it; of:,..P'lO4ft!�rd.. ,:'"ama { At::- for landaoaPe am greenbelt purposes th.roughj ;ti "', r ,;"°�,�onq�.,. �rvsa and under the following described rda:l D'tY= to' grit x =` THE WFE3T 17S Funor VH 6 * 0ST OF' T" 1�1.1• NI11G Df'RIaXD PROPEM = LOT r THE som 3l�p F11XT �F TNT,`1 t OF.- �y{ Y BSCTIQII aSr T �1rr ;l'-. �RI *AN 'Y's ZH �Z� �R WAMINGTON 1 ` EXCEPT TIDE WART 660 PUT OF `gQQV1C0 k*mT W EXCEPT THE :MSbT 360 PUT Of GOVRORM...1AW 2 t ' C7 LrXCEPT '1'l1iT VMTIGH DElD=D TD TKt,-CITY bt PE4 1' w..wilx. l 1T MI>iST 356TH Set.: D11f1jo QJjIV CLAIM DEED 911 a.5X 1+1 ••�,,.. ,:_ a` r � :. tar the Y ree - 1m*fAV­Of the.."loiior+inq � T1'tii �iaso�nt is # t • P a � ',�� � Witt V4 l oared in cgs by : pi ari s:ti 1k4 feet a! the following: eilgfrin Rq ■:'Paint 330 Thai n47cth;�' goverrownt f e� 64,1t find -3N1 list south o! the narthWsst avir°vt.:' l ti 2 i � Heoti + Z5, j a+4nsh�ip 21 north, range 3 NRt :. +M M. ■ in King Cauh�y, Wao,�i[i9t.0h t; tiffs said line south to be parallel With the West, ln�;�vt isid ge�ra'n�at. lot 2: thence south alb �toet cn ■ line Pavel le] With the .; errt: iina v= said governmant lot 28 thar'ae "at to a point 7 's lait brit qt ., the mast 1 tno of acid gaysrnmmt lot 3, on ■ l ids parallel , -4t4, 6o�rth', line vt said gavarnrrsnt lot 2 t a J"t, .=`on d:..;ij j'ha;: parallel With the gait Lino of .. tkr.rnee north �.-��• l.nninq r ex+Qept tAo wae�. raid lot 21 thence wirtst. to the. Point: clt bell 30 toot thsrrar oonkayd'': i ,ty:, !or xoird by dead, undor auditor's file no. 3�6sb�r The portion hereto sgkss ' --thsv' U;l r Psrtx- way aausa this agreement or ■ 10e100r4nduv of::. thif agrwto"�at 110i for record in the of t iceo at um M n4 County .:Repo�arl• t hilt be oanittj . pOt'+ the parties lilts agtCsemall s hereof and *hall not run with the 1 arid.. At }' 9222 Lake pity M4Y.'*.j'.. 41 y i Seattle,$l, 5- Z{$l� CHAMSB�tS/P;ADCHIlAD .' A jaY,.rl� it � ■ � :'�t. 40 7A Our COMA Nary Cha%bers 44: l? S /V k 4 664 Cathelyn Plow"" Adolph ow &r4 e STATR or "Sit .All COWM or KING stir a'l—�dhof Y.jh Zeared before.ng kn*6n %B LeATidual d.- ft Ow who 4 d the VS hth w r describe 4 it a &w,h or roe And 1 went, vQlta►that WIN" gig t&�j lot ;d4"d for parr Printed No amAmy Puar C In Orul fb `ram of WAshingtont r sid ng appointment expires COUNTY of RING V4 .'A991 peroonall-Y xpp"re4 On this T4 In, thq individual v4 before we to Y." who and foregoing instrumORt* wi demoribed in and a Jiama'-'** ' A �Jqfied th his/her free Ar and acknowl"gad that he/*" a A tO 3�wmtw, d voluntary &ct. vA 49", for the OrPOO -OrO • Printed Haas: ww"Y PUBLIC in 4nd Oor of Washingtono my appointment expire CHAxbMS/PLQUCVWW ? AA3RSEMT 2 40 Subt, OF."WMHiNGTON OF =Mfg" n before Ana.: , and acknowl"ged voluntary &A,:,and. Aor �the 1994, personally appeared wn to be the individual and foregoing instru"nto, sane as his/her free and therein mentioned. Pr ik" I ' r the State state i'shthgiom-, r4aWing at: Notary 4: seal so. COUNTY." Or;( nx(; :5 X on -this:, '"T"Pt 1994, per6o0 *red kf.9, re to W—knivwn to be .itdividual * , ddk36Vib*d in j.04 tod the within arA fo a free and voluntity—Act d9od Nr e and i6knowledgOd :6tat bieeshe signed the 6&� a h s r •....... tj4p purposes therein Immtickmde JI. 10411 Vvin W4 for the state of com Notary seal JI CMAKURS/pLOUCE"m 40 to ■ M • c ORIGINAL Agreement made on �� 3 between Ear] And Mary Chambers, husband and wife, [hereinafter The Chambers] of 1901 S.W. 356th Street, Federal Way, King County, Washington and Allan and d Vickie Veldman, husband and wife, [hereinafter The Veldmans] of g 35704 20th Avenue S.W., Federal Wily, County of King, State of M Washington. O RECITALS ` A. The Chambers are the owners in fee of that certain lot of land in King County, Washington described as follows: 3 THE SOUTH 350 FEET OF THE NORTH 380 FEET OF GOVERNMENT LOT 2, SECTION 25, TOWNSHIP 21 NORTH, RANGE 3 EAST W.M. IN KING COUNTY, WASHINGTON: EXCEPT THE EAST 660 FEET OF GOVERNMENT LOT 2; EXCEPT THE WEST 360 FEET OF GOVERNMENT LOT 2,- EXCEPT THAT PORTION DEEDED TO THE CITY OF FEDERAL WAY FOR SOUTHWEST i 356TH ST. UNDER QUIT CLAIM DEED 9112061614. $ ; H. The Veldmens are the owners in fee of that certain lot of land in King County, Washington that adjoins the abova-described (Q property of The chambers to the north, and which is described as W follows: 0 THE SOUTH 176 FEET OF THE NORTH 556 FEET OF THE EAST 125 FEET OF 21 NORTH, ,� a CQ THAT PORTION OF GOVERNMENT LOT 2, SECTION 25, TowNSMIP RANGE 3 EAST, WILLAMETTE MERIDIAN, IH KING COUNTY, WASHINGTON, e C LYING WEST OF THE EAST 660.00 FEET; t TOGETHER WITH AN EASEMENT FOR INGRESS, EGRESS, AND UTILITIES OVER OF AND ACROSS THE SOUTH 20.0o FEET OF THE NORTH 400.00 FEET 21 NORTH, RANGE 3 FAST, GOVERNMENT LOT 2, SECTION 25, TOWNSHIP WILLASETTE MERIDIAN, IN KING COUNTY, WASHINGTON; EXCEPT THE EAST 785 FRET; AND EXCEPT THE WEST 360 FEET. C. The parties agree that the common boundary between their in the survey completed by Dennis .�. properties is properly described Lund and recorded on August 24, 1992 under King County Recording number 9208249004. D. The parties hereto agree that either party may cause this this agreement to be filed for record agreement or a memorandun of in the offices of the King county Recorder. F. This agreement shall not be construed as personal to the parties hereof but shall run with the land. RECORDED RT TH6 1tEQUEST Q: CHMERS/VELD ri11N AGREEMENT MICHM L. OLVER P.S. 1 MERRICX 6 DIVER, . 9222 Lake City Way N.S. Seattle, WA 981I5-3268 1 to CD tD C C12 4 C ■ M �rl rs Nary Ch &Ws Allan Veldman Vickie Veldman STATE OF WASHINGTON ) ) as COUNTY OF KING ) 71 1999{ personally appeared before nmeh a4andilo�', sexe=cQ�ed to me known to be the individual described ine within and foregoing instrument, and acknowledged that he/she signed the same as his/her free and voluntary act and dead, for the purposes therein mentioned. Printe ame: NOTARY PUBLIC in and or th Etate of Washington, residing at ^ My appointment expires STATE OF WASHINGTON ) ) so COUNTY OF KING ) On thiAd dof = leer , 199�personally appeared before me !�« 1d�na , to me known to be the individual described in and who executed the within and foregoing instrument, and acknowledged that he/she signed the sane as his/her free and voluntary act and deed, for the purposes therein mentioned. Printed ame: NOTARY PUBLIC in and for th state of Washington, residing at + my appointment expires CHAMEES/VELDNAN AGREEMENT a 0 q# C; • M STATE OF WASHINGTON ) ) ss RUNTY OF KING ) On this `� ay of , 199 personally appeared before me to me known to be the individual described in and a executed the within and foregoing instrumentr and acknowledged that **/she signed the same as !M/her free and voluntary act and deed, for t urpvses ther n aentianed. er n ed Name NOTARY PUBLIC in and for t stata of Washington, residing at My appointment expires STATE OF WASHINGTON ) ) so COUNTY OF KING ) On this day of 1 9� personally appeared before me rto be the individual described in hnd who executed the within and foregoing instreeeand and acknowledged thnt, /she signed the same . �s/h er voluntary act and deed, for the pu Os%einrnCen tioned. Printe HNOTARY PUBLIC ifothe sta e of Washington, residing at My appointment expires CHhMERS/VELDHAN AGREEMENT 3 w r v � 10-43 Jul 15R42 wtvin veil coa ml ban 'I Bdstrida O,Pateraon r. to 00anty of errata of ,:aoaingbon p ay rsl and qa to ap for aas tf tbo pub foZkower area pub road wnd hXx all i at in tn* fdre The x 3o ft of the t 360 ft of the is 3$0 rt of thor S' 380 ft X 001 Lot 2 8so 25 T. 21 ar *in eont� 0.23 ao nrl 't, ta= vaeatatiiah0d raid togthr w14h t.,,e rt to E&k& 431 naa slopes for ouzu a Est 0.11a ugpu the abatting prop e.tA on asdh BL46 Of ad daa rb W" "y in otaatt��ai� vpixb standard pion* and sp+olf for kp$ pnrA aerArii0 4.katu saa Pierce ►%v via Tnl 11-•42 by Hehtrio a a,Pat Orson,, bwf np Vcr a,# rta at T -me an WAV 30-1,4 by johollafithe t .fir 10.43 Ir r. k z 3 9D�s ► ���. .Tul 1$r42 oartsi-a ral oua rind ton •;;, Be rt sAd idaryl WIAU Utr f to county of -line, btat• Qx k,&tt1�1�;t on ta din The N 30 rt of t . a t 330 ft of tin s 37) ft r)r the IN 755 ft of Gov Got 2 6.�o 25 T. 21 nr 3 sum aunt 0*23 &0 for unmetab rand togth r pith ♦_• Boa riatermuty Bazy), wintarnato Pt araa 'Jo V'A W 1$-42 W BOTH "Int■ 21"As ar4 Beryl NintaMAW but V1.O.Teeto np tor to rva at Tawim an Feb 4-AM? (110 by 00 Ho4d is :may 10-4) , )308)65 dal 1$-42 oarwa in v& j can &M bon 1 aabidl Planing and 11va 714MIDg to oounV of fi ingp btate of "Mash 343 ..rr Tbs ;A; 3ry ft of thn 1, 360 ft ur the q 373 tt or the t" 715 ft of 00T t.ot 2 �+dA 2S T. 21 nr 3 arose Omt 04) ■o mr1 %/b aa.ameab raid i3an101 ylan149 xlra 1l4aing g ar']+A Co Wn 'Tua 1�.12 by t4:, iAi, f,i+tr►ing a r4 14 irli J l MIAg, naf jamva w.An4araan up i w aw re a ■t Tov+oaa sa f;ar 30-44 (r2d by co tac,ci Inv)- � �t LAKEHAVEN UTILITY DISTRICT W,r 31627 151Ave South • P.O. Box 4249 • Federal Way, Washington 98063-4249 Federal Way: 253-941-1516 • Tacoma: 253-927-2922 www.lakehaven.org T LITY DIS PJJ February 3, 2016 Leila Willoughby -Oakes City of Federal Way 33325 - 8th Avenue South Federal Way, Washington 98003-6325 RE: XU SP (proposed) Parcel 2521039004 Leila, This letter is intended to describe & clarify the two (2) options the referenced project/property has regarding sewer service connections, for any proposed property subdivision. Following are the options (listed in order of Lakehaven preference, but either is available for the property). For either of these connection options, a Lakehaven Developer Extension Agreement (DE) is required to construct approximately 200+/- feet of new 2" low-pressure sewer (LPS) main along the west margin of 20th Ave. SW; to date we have not received that application. SEWER OPTIONS FOR SUBDIVISION OF PARCEL 2521039004 A. As previously indicated by Lakehaven, proposed Lots 4 & 5 would have separate gravity service connections to an existing Lakehaven sewer manhole located just off the east property line of the subject property. Proposed Lots 1, 2 & 3 would have separate grinder pump (GP) service connections to the new 2" LPS main indicated above. Private easement across Lot 5 would need to be reserved for the benefit of Lot 4's offsite building sewer line. This option, more specifically the gravity sewer service connections for Lots 4 & 5, would require resolution of the property boundary/survey situation, to allow a complete reservation of the area needed for the new private easements indicated herein. B. If the property boundary/survey situation cannot be resolved (or resolved in a sufficiently timely manner), Lakehaven would allow Lots 4 & 5 to have separate GP service connections to the new 2" LPS main in 20th Ave. S. This option would require reservation of a private easement(s) across Lots 3 & 4, for the benefit of the offsite GP building sewer lines for/from Lots 4 & 5. As indicated in option "A" above, proposed Lots 1, 2 & 3 would have separate grinder pump (GP) service connections to the new LPS main that would be constructed by/under the required DE project. Let me know if you have any questions or need additional information. Sincerel , Brian Asbury Development Engineering Super ' or Sewer Options-2521039004-020316.docx Leonard D. Englund Timothy A. McClain Donald L.P. Miller Ronald E. Nowicki Peter Sanchez Commissioner Commissioner Commissioner Commissioner Commissioner - ) I PORTION OF NE 1/4 OF SECTION ko, TOWNSHIP 21 NORTH, RANGE 3 EAST, W.M., IN KING COUNT 1, WASHINGTON GENERAL NOTES 1. All construction shall be in accordance with the Federal Way Revised Code (FWRC), applicable ordinances, and the City Council oorrdlI of project approval. These documents are supplemented by the Standard SpeclficaHons for Road, Badge, and Municipal Construction (WSDOTIAPWA), the IGng County Road Standafds (KCRS), and the King County Surface Water Design Manual (KCSWDMI. It sbail be the sofa responsibility of the appilcant and the Professional Engineer to 00rect any error, ornitslorl, Or variation from the above 1egWremante found In these plan$. AR corrections shall be at no additional cost or liability to the City of Federal Way. 5. A signed copy of these approved plans must be on the job site whenever construction is in progress. 6. Construction noise shall be limited as per FWRC (Section 19.105.040); normally this is 7:00 a.m. to 8:00 p.m., Monday through Friday, and 9:00 a.m. to 8:00 p.m. on Saturdays. 7. It shall be the applicant's/contractor's responsibility to obtain all construction easements necessary before initiating off -site work within the road right-of-way. 11. All utifity trenches in the fight-of•way shall be backflled 516' crusbed rock and compacted 095%density. When trench width is 18 inrhes or less, and is within the traveled way, trench will be backfiged with control density fill (self-rampacled Oowablo nil) as defined by Washington Aggregates and Conuete Assocta8on. The aggrasai6wid be 3/8-inch minus. 12. All roadway subgrade shall be backfilled and compacted to 95 % density in accordance with WSDOT 2-06.3. 13. Open cutting of existing roadways is not allowed unless specifically approved by the Public Works Director and noted on these approved plans. Any open cut shall be restored in accordance with KCRS 8.03(b) 3. 14. The contractor shall be responsible for providing adequate safeguards, safety devices, protective equlpmeni. fiaggers, and any other needed actions to project life, health, and safety of the public, and to prolect property in conneetien with the parformmke of work covered by the contractor. Any work wa ttln tha traveled dghlwf-way that may interrupt normal traffic flow &hail require at least ono flaggar for each larrs of trafficedecied. AD sections of the WSDOT Standard SpeWcagons 1-07-23 - Traffic Canlfol, shall apply- 15- Contractor shall provide and install all regulatoryand warning signs per the latest edition of Manual on Uniform Traffic Control Devices. CONSTRUCTION NOTES INSTALL CONCRETE FOUNDATION, PAD, JUNCTION BOX, LIGHT STANDARD AND LUMINAIRE (LEOTEK GCM1 30F MV NW 3 GY 700) PER LUMINAIRE SCHEDULE AND CITY OF FEDERAL WAY STANDARD DRAWINGS 3-39, 3-39A, 3-39B AND 3-40, INSTALL TYPE 1 JUNCTION BOX. �oI,fTE txkTAUfT AktU eunDue�RsTo fexisrt(vc. JuN"s:Tsgl'e a�x AND INTO EXISTINO SWAGE CAME'- CtMATEc tkw ILi:S1tNJ�Ttie`i CIRGV!'F f5�..''1 d:?Ct ly'S1,Y L1j.SyklA,ll�S- _ _ _ �J JUNCTION BOX SCHEDULE LOCATION OFFSET (FEET) 20TH ST SW 1+84 ZS' LT- f)TH ST SW 3+28 28 LT - FIELD BOOK: SURVEY BASE MAP• DESIGN ENTERED: '02-01-16 DESIGNED LOH 02-01-16 VJG •02-01-16 P NUI CHECKED: POLE NUI DATE REVISION CZ 30 0 30 60 scale feet _ I to SW356THST a , i s ! ' f Q l l •; N JO' MH, 12' ARM ;!r 1 �\ ��— Deleted TPU SSB feeding controller Approximate location of new lighting controller STREET LIGHTING NOTES 1. The Contractor shall acquire an Electrical Permit from the Cicy's Building Department The Electrical Permit shall be kept in the upper bay ofthe service cabinet 2. Upon completion of underground installation of power From power vault or pole to service cabinet, contractor shall notify the Building Department Upon Final Electrical Permit approval, the electrical inspector will place an approval tag next to the meter base so that electrical service can be authored. 3. The Contractor shall coordinate power source and service location with the utility company. 4. The Contractor shall contact the Utilities Underground Location Center (1-800-424-5555) at least 3 days before digging. 5. Field adjust pole bases to be level with sidewalk surface (see City Standard Drawings 3-39A and 3-43). 6. Locate light poles so that the pole is a minimum of six (6) Feet behind the face of wrb, and the luminaire extends two (2) feet beyond the face of curb Light poles shall not be located within the sidewalk, Pole bases may be located within the sidewalk only with City approval- 7. Junction boxes shall be located behind the sidewalk, and within five 15I feet of the pole 8. Conduit shall be Schedule 80 PVC under all street and driveway crossings. ule 40 PVC conduit is acceptable under landscaped areas Immediately following final inspection of the street light system uy King County, all e! light system J-Boxes shall be spot welded shut using a 1 ^weld on opposite corners EIhIG SCHEDULE CONDUIT CONDUIT CONDUCTORS RUN SIZE .vTFS Z�s 2 PVC SCHEDULE 80) 2-#B, 1-y6 BARE LUMINAIRE SCHEDULE LUM. N0. CIRCUIT N0. LOCATION OFFSET (FEET) LAMP TYPE MAST ARM (FEET) MOUNTING- HGT. (FT' 'OLE NUMBERING i A 20TH AVE SW STA 7+76.5 27.5 LT, LED* 12' 30 :.329 1 SL2 2 2 A 20TH AVE SW STA 3+23 27.5' LT. LED* 12• 30" 5329 7 SL2 7 'LEOTEK GCM1 30F MV NW 3 GY 700 yE--X�IS-TING NEW APPROVED CITY BY O 11�'` I II r -• 2 OF FEDERAL VIiAlPns BI:i DEPAATM T DATE ' ❑ ' a �(��C,IOJ L ��� �� Cal �( �►\ 04/08/16 a w N171d i'HWE"ST E )?AFFIC EXPERTS 11410 NE 124th St., #590, Kirkland, WA 96034 Phone:425.522.4118 Fax:425.522.4311 LEGEND TYPE M-C-III LED LUMINAIRE, ARM AND ALUMINUM DAVIT STYLE POLE PVC CONDUIT (SEE WIRING SCHEDULE) SERVICE CABINET TYPE 1 JUNCTION BOX WITH CONCRETE PAD WIRE NOTE CONSTRUCTION NOTE I 'VIT N0. 15-105750-00—EN f CITY OF FEDERAL WAY AS —BUILT ;11MIT N0. 15-105750-00—EN SHEET CITY OF FEDERAL WAY 1 XU SHORT PLAT of 2 SHEETS ILLUMINATION PLAN 24" X 1 Q' ELEVATION VIEW SCALE 1/2"=V-0" WEIGHT: 40101bs J U 4 N f �I I 1111 Ibco 4 1" CLR _ TO STIRRUPS 2 ITEM REFERENCE P/N QTY DESCRIPTION 1 4 r Ilz 11 �:�y � Z' l op 2 1 LIFT LOOP - 4500 LB (LT GREEN) 3 1 PLASTIC VOID FORMER 4 1 SLOTTED BASE PLATE (HDG) 5 1 #2 AWG STRANDED COPPER 24" LONG (P# 050-2600) 6 1 1/2"-l" WATER PIPE GROUND CLAMP (PEN -UNION KP-1) LorJ `" 24" X 9' ELEVATION VIEW SCALE 1/2"=V-0" WEIGHT: 3538Ibs �I n L L Y ­-DIA x 51/2" SQUARE HEAD BOLT 3-3/4" DIA. HARDENED WASHER 3-3/4" DIA. NUT 1-OVERSIZED 3/4" HARDENED WASHER (3" O.D.) 1-l" DIA. HARDENED WASHER 314" BOLT ASSEMBLY 314" BOLT OPTION (LOOSE ITEMS) QTY DESCRIPTION 4 314" DIA x 5 112" SQUARE HEAD BOLT 12 3/4" DIA HEAVY HEX NUT 4 3/4" OVERSIZED WASHER 4 1" DIA HARDENED WASHER 12 3/4" HARDENED WASHER 1" CLR TO STIRR 24" X 8' ELEVATION VIEW SCALE 1/2"=V-0" WEIGHT: 30661bs �I I Z-0" 0 (V V DIA x 6" SQUARE HEAD BOLT 3-1" DIA. NUT 4-1" DIA. HARDENED WASHER 'I" BOLT ASSEMBLY 1" BOLT OPTION (LOOSE ITEMS) qTY DESCRIPTION 4 1" DIAx 6" SQUARE HEAD BOLT 12 1" DIA HEAY HEX NUT 16 V DfA HARDENED WASHER (2" O.C.) 24" X T' ELEVATION VIEW SCALE 1/2"=1'-0' WEIGHT: 25941bs �I ro 0 w W It to Q 1" CLR - TO STIRRUPS r 2 f� p GROUNDING DETAIL SCALE 1" = l -W GROUNDING WIRE CLIPPED TO REBAR & EKTENDED 6" FROM THE TOP SURFACE ISOMETRIC VIEW SCALE 112"=l'-0" GENERAL NOTES 1. MINIMUM 28 DAY CONCRETE STRENGTH Pc--5500 PSI. 2. REINFORCING STEEL A-615 OR A-706 (GR.60) 3. ANCHOR BOLTS AND HARDWARE TO BE HOT DIP GALVANIZED (HDG) PER ASTM A-153 4. CONDUIT TO BE PVC SCH. 40 1 R CIRCUITA EXISTING 150W @ 240V = 0.9 AMP/LUM NEW 69W LED @ 240V = 0.4 AMP/LUM TOTAL LOAD = (2 X 0.9)+(2 X 0.4) = 2.6 AMPS 55' Vd=2ALR =2(2.6)(5+10+5=20)R = 104R 10' =2(0.8)(5+55+10+150+5=220)R = 352R EX. X. = 127.2R SUBTOTAL = 583.2R R = 0.000809 FOR #8 = 0.47 VOLTS 172' POLE & BRACKET 2(0.4)(50)(.001290) = 0.052 VOLTS TOTAL = 0.52 VOLTS EX. rraff NORTHWE-ST TRA FFIC EXRER TS 144' 150' 0.52V/240V = 0.0022 = 0.22% c 50% THEREFORE #8 WIRE Q SLJ BMITTE -' Xu Short Plat Line Loss Calculations MAR 0 i 201b LDH 02.01.16 Figure 1 1 BEYLER CONSULTING Prepared for: Prepared by: Reviewed by: _1 J J J CONTACT phone: 253-380-2958 fax: 253-582-5694 landon@beylerconsulting.com beylerconsu Ili ng.com J OFFICE 10314 100th St. SW J Lakewood, WA 98498 Plan. Design. Manage. CIVIL ENGINEERING I LAND PLANNING I FEASIBILITY f PROJECT MANAGEMENT I PERMIT EXPEDITING XU SHORT PLAT -re& mica Information a ort MAYFAIR, LLC 64704 53rd Ave SW Federal Way, WA 98023 253-666-4985 November 10, 2015 Joseph A. Parsons Landon C. Beyler, P.E. Beyler Consulting 7602 Bridgeport Way W., Ste 3D Lakewood, WA 98499 253-301-4157 RECEIVED NOV 12 2015 CM OF FEDERAL WAY CDS J J TABLE OF CONTENTS I. PROJECT OVERVIEW................................................................ 3 ProjectDescription...................................................................... II. CONDITIONS AND REQUIREMENTS SUMMARY .......................... 8 III. OFFSITE ANALYSIS................................................................ 11 3.1.1 Task 1 - Study Area Definition and Maps ......................... it 3.1.2 Task 2 - Resource Review ............................................. 11 3.1.3 Task 3 - Field Inspection ............................................... 12 3.1.4 Task 4 - Drainage System Description and Problem Descriptions .......................................... ................ 12 3.1.5 Task 5 - Mitigation of Existing or Potential Problems.......... 12 IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS ANDDESIGN .................................................................................. 13 V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN ...................... 25 VI. SPECIAL REPORTS AND STUDIES ........................................... 26 VII. OTHER PERMITS .............................................. I..................... 26 VIII. CSWPPP ANALYSIS AND DESIGN ........................................... 26 IX. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT................................................................................ 26 X. OPERATION AND MAINTENANCE MANUAL .............................. 26 XI. Appendices............................................................................ 27 APPENDIX A - DOWNSTREAM SYSTEM TABLE AND MAPS APPENDIX B - GEOTECHNICAL REPORT APPENDIX C - CSWPPP NO BEYLER Page 2 Xu Short Plat PROJECT OVERVIEW Project Description The Xu Short Plat proposes to plat a previously developed single family parcel, being located at 1909 356th Street, in the City of Federal Way, King County, Washington. The King County Parcel number is 2521039004. The current zoning of the project site is RS' 9.6, Residential Single -Family 9,600 sf, indicating a minimum lot size of 9,600 square feet. This project proposes to short plat 5 lots on the 1.58 acre project site. In addition there a stormwater tract is proposed for detention. A portion of the subject site will be dedicated to the City of Federal Way for the purpose of frontage improvements consistent with a Type "C" street along SW 3561h Street. Half street improvements consistent with Type "S" street are being proposed 201h Avenue SW frontage. A shared access drive, having connectivity with 20th Avenue SW is proposed along the southerly property line of the subject site, to allow for access to lots 4 and 5. The shared access drive has been designed in accordance to the City's standard detail for alternative fire department turnaround. Lots 1-3 will access directly from 20th Avenue SW from individual drive connections. The project is adjacent to SW 356th St to the North, multiple single family parcels to the east and south, and 20th Avenue SW to the west. The project is keeping consistent with neighboring land use characteristics. A subsurface exploration on the project site was conducted by GeoResources, LLC in June 2014. In summary, the stratigraphy across the site, as observed in the test pits, generally consisted of 1/2 to 1 foot of forest duff and sandy topsoil overlying 1.5 to 2 feet of loose medium dense, silty sand with varying minor amount of gravel. These surficial soils were interpreted to be weathered glacial till. The underlying glacial till encountered in the explorations was observed to be in a dense to very dense condition. According to the GeoResources, these soils may be suitable to support porous pavement with an estimated long term infiltration rate of 0.25 inches per hour. The overlying 24 to 30 inches of weathered soils should provide adequate treatment capacity based on the cation exchange rate and organic content test results. The geotechnical report can be found in Appendix B of this report. This project is subject to a Full drainage review per Figure 1.1.2.A of the 2009 King County Surface Water Design Manual (the Manual). The project site is situated within Federal Way's "Hylebos Creek" drainage basin having a single existing sub -basin. All runoff from rooftops, driveways, and shared access will be collected and highlighted to the detention pond located on the northern end of the site. It is currently proposed to utilize pervious asphalt for the shared access roadway for lots 4 and 5. This will allow the site to take advantage of the existing soils which provide acceptable treatment capacity and eliminate the need for formal Basic Treatment. See section IV of this report for further information. Vt j BEYLER JG4NSO L71:l 1'• Page 3 Xu Short Plat Figure 1. Site Location V1L IM 1 1 I"lfir N.T. S Page 4 Xu Short Plat BEYLER C4a 5U:T �� Figure 2. Drainage Basins Subbas■ns and Site Characteristics 0 � § ) C c ] \ \ 7 f 3 § _ o = > )# k § & k 2 5 c ) ) § q / 5 ] LOL, > p ) � � Ej0, !g.j f Page 5 Xu short Plat j BEYLER VQmamw Figure 3. Critical Areas Map City of Federal Way Critical Areas Map 4th St ■[ �1 u{r BEYLER crrr o* Federal Way Page 5 Xu Short Plat Figure 4. Soils Sol Map —King County Area, Washington (Xu Short Plat) 4r Ib TN 4°' IV 5YN 4F 1 51'N G]" 1OWN yam ] 54Bi10 548440 54B4ro ws00 549s37 59flsfi0 = Map Unit Legend IOng County Area, Washington (WA633) Map Unit Symbol Map Unat Name Acros In AOI Percent of AOI AgB Alderwood grevellysandy loam. 4.1 59.6% 0 to 6 percent slopes AgC Alderwood gravelly sandy loam, 28 40.4% 6 to 15 percent slopes Totals For Area of Interest I G9 100.0°k [SO BEYLER G 4:351'k'f l:�.• Page 7 Xu Short Plat II. CONDITIONS AND REQUIREMENTS SUMMARY Review of Preliminary Plat Approval Conditions The following conditions have been received by mail from the City of Federal Way, dated October 5, 2015, having a file number of 14-105417-00-SU. (1) Prior to recording, the applicant shall pay 13 percent of the most recent assessed land value of the subject property as the fee -in -lieu of open space. (2) Prior to recording, applicant shall pay a transportation impact fee, which shall be assessed and due at the time of plat recording. (3) Prior to recording, all existing structures proposed for removal (single family home, detached garages, sheds, and an existing driveway) shall be removed. (4) Prior to recording, the applicant shall install a 10-foot landscape buffer of Type Ill landscaping on 'Tract A' to the satisfaction of the Planning Division. (5) Prior to recording, the applicant shall provide a note on the face of the plat indicating the fire sprinkler requirements for Lots 4 and 5. (6) Prior to final short plat approval, the street frontage improvements, on -site access roadway, and storm drainage systems shall be constructed and accepted. (7) Dedication of right-of-way along SW 356th St shall be recorded under a Statutory Warranty Deed, which shall be recorded prior to, or concurrent with, final short plat recording. (8) Water and sewer service stub connections shall be completed and active prior to plat recording. (9) Prior to recording/during construction permitting, the applicant shall place a note on the short plat drawing identifying the total tree units required for each lot as identified in the Xu Short Plat 'Findings of Fact, at a rate of 25 tree units per acre. (I 0) Prior to recording, the applicant shall provide a note on the plat that the storm water facility containing the landscaping buffer strip (Tract A) shall be equally owned and maintained by the owners of the Xu Short Plat. (11) Prior to recording, the applicant shall provide a note on the plat that the private road and utility easement shall be the responsibility, equally owned, and maintained by the owners of Lots 4 and 5 of the Xu Short Plat. (12) Prior to recording, the applicant shall provide a note on the plat restricting vehicle access for Lot 3 to 20th Avenue SW. (13) In the title report, after filing the short plat with the King County Recorder's Office, Lot 5 shall disclose the plat boundary survey discrepancy per RCW 58.17.255. (14) Prior to recording, the applicant shall provide a note on the plat stating approvals are required by the Director of Community Development in order to remove vegetation from the landscape strip in Tract 'A'. IN* Page 8 Xu Short Plat BEYLER Review of Eight -Core Reguirements and Five S ecial Re uirements The following comments are a review of the Core and Special Requirements per the 2009 King County Surface Water Stormwater Manual. Core Requirement No. 1 Discharge at the Natural Location The site's topography suggests that stormwater runoff from the site sheets flows generally to the west through the project parcel to the city drainage system in 201h Ave SW. Under developed conditions, stormwater will be collected, detained, and release to the stormwater system in 201h Ave SW. Core Requirement No 2 Offsite Analysis A preliminary offsite analysis has been included. No flooding or potential flooding problems were identified downstream of the site. Further narrative of this analysis can be found in Section III of this report. Core Requirement No 3 Flow Control Flow Control Facilities: The proposed project is located within the Conservation Flow Control Area requiring Level 2 Flow Control for new impervious and pervious surfaces that are not fully infiltrated. This flow control standard requires runoff from developments to be detained and released at a rate that matches the flow duration of pre -developed rates. The above is required unless an exception applies to the proposed site conditions. The project does not qualify for an exception, thus a flow control facility is proposed. The project will utilize an above ground detention facility on the northern end of the property to detain flow and release and historical rates. Flow Control BMPs: In addition to flow control facility requirements, projects subject to Core Requirement #3 must apply flow control BMPs to impervious surfaces on each individual lot. Flow control BMPs are methods and design for dispersing, infiltrating, or otherwise reducing development increases in runoff. Flow Control BMPs are proposed as a part of this short plat are proposed to be implemented at time of building permit. This may change as the project progresses forward. Core Requirement No. 4 Conveyance System All new pipes systems will be designed with sufficient capacity to convey and contain at minimum the 25-year peak flow. Conveyance design will be completed during final engineering. Core Requirement No. 5 Erosion and Sediment Control This development will be constructed in one phase. Please refer to Appendix C for the prepared CSWPPP report. Core Requirement No. 6 Maintenance and Operations The maintenance and Operations Manual will be provided upon request. Core Requirement No. 7 Financial Guarantees and Liability Financial guarantees will be provided upon request. B BEYLER J J Core Requirement No. 8 Water Quality The site falls within the Enhanced Basic Water Quality treatment area of the city according the Federal Way WQ Applications Map. The project meets the soil treatment exemption requirement per Section 1.2.8.4, exceeding the cation exchange capacity greater than 5 and an organic content greater than 0.5% minimum requirement. The measured soils are composed of less than 25% gravel by weight with more than 75% of the soil passing the #4 sieve, more than 50% of the soil passing the #40 sieve and more than 2% passing the #100 sieve. Please refer to the prepared Geotechnical report and supplement letter for details on the cation exchange rate and infiltration rates. The project proposes to take advantage the treatment suitable soils by proposing pervious asphalt for the shared access driveway. The remaining Pollution Generating Impervious Surfaces (PGIS) consists of the individual driveways for each lot. Lots 4 and 5 are to slope toward the pervious shared use driveway to these driveways to also take advantage for the treatment soils. The remaining 3 individual driveways equate to approximately 1,500 sf of PGIS, which is less than the 5,000 sf threshold, thus exempting stormwater from formal treatment. The existing soils suitable for infiltration/treatment while utilizing pervious asphalt are relatively shallow. The owner will work with the geotechnical engineering to find a suitable design and special attention will be needed during final grading and construction of the pervious asphalt. No formal treatment facilities have been proposed at this time. Special Requirement No. 1 Other Adopted Area -Specific Requirements This project is not in a designated Critical Drainage Area. This special requirement is not applicable. Special Requirement No. 2 Flood Hazard Area Delineation The project does not contain or is not adjacent to a flood hazard area for a river, stream, lake, wetland, closed depression, or marine shoreline that is within the 100-year floodplain according to King County and FEMA. Special Requirement No. 3 Flood Protection Facilities This project does not rely on any flood protection facility such as a levee or revetment nor will construct a new flood protection facility. Special Requirement No. 4 Source Control This project does not require a commercial building or commercial site development permit. This special requirement is not applicable. Special Requirement No. 5 Oil Control This project is not defined as a high -use site nor is a redevelopment project proposing $100,000 or more of improvements to an existing high -use site. This special requirement is not applicable. K BEYLER .Page 10 XLI Short Plat III. OFFSITE ANALYSIS A preliminary offsite analysis report was prepared per Section 1.2.2, Core Requirement #2 of the Manual. This is to identify and evaluate offsite flooding, erosion, and water quality problems that may be created or aggravated by the proposed project. The primary component of this offsite analysis report is the downstream analysis. The second component of the report is to evaluate the upstream drainage system to verify that significant flooding and erosion impact will not occur as a result of the project. 3.1 DOWNSTREAM ANALYSIS The following Level 1 downstream analysis is a review of the drainage system up to a mile downstream of the site. The four tasks outlined under this review are: Task 1 - Define and map the study area Task 2 - Review all available information on the study area Task 3 - Field inspect the study area Task 4 - Drainage System Description and Problem Descriptions 3.1.1 Task 1 - Study Area Definition and Maps The project is located in the King County Hylebos Creek Drainage Basin within the Puyallup - White water resource inventory area (WRIA). The drainage study area is approximately a mile long path encompassing the site's downstream corridor. See Appendix A for maps of the basic study area. See Appendix A for maps of the basic study area. The site is currently developed with a single family residence, being adjacent to SW 356th St to the North, multiple single family parcels to the east and south, and 20th Avenue SW to the west. 3.1.2 Task 2 - Resource Review The following resources have been reviewed for the downstream analysis: Adopted basic plans • The site is located in the Hylebos Creek Drainage Sub -Basin within the Puyallup - White WRIA (WRIA #10). Sensitive Area (See Appendix A for Sensitive Area Maps) • Erosion- None Mapped • Seismic - None Mapped • Landslide - None Mapped Coal Mine - None Mapped • Streams and Wetlands Map - None Mapped ■ Susceptible to Groundwater Contamination - Low ■ 100 year flood plain - According to King County iMAP and the FEMA Flood Maps, the 100 year flood plain is not located near the project property. Drainage complaints and studies King County -Relevant DNRP drainage complaints within 1 mile of the downstream corridor within the last 10 years were searched. There are currently no open complaints within the downstream corridors filed within the last 10 years. . l i R~ i BEYLER J Q N � U I., T Q Page it Xu Short Plat 3.1.3 Task 3 - Field Inspection The site appears to be made up of one threshold discharge basin that generally slopes down from the south to the north and at slopes ranging from 0 to 5 percent. Based on the topography of the site, any stormwater that may exit the site does so near the northwestern corner of the property. The project proposes to manage stormwater from the rooftops and driveways through the use of a detention pond as well as pervious asphalt for the shared driveway that will also overflow to the detention pond. The detention pond will release stormwater to the existing tightline system in 20th Ave SW. The following is a preliminary description of the downstream corridor: Upon exiting the site, stormwater enters a CB on the southeast corner of 201h Ave SW and SW 356th St. Flow continues across 201h Ave SW to the Southwestern corner. At this point water crosses under SW 356th to the north side and continues in the existing stormwater system. From here stormwater is tightlined west within SW 356th St. At about 280 feet downstream from the site, piped stormwater turns north up 21St Ave SW. Stormwater continues north beyond 1/4 mile downstream where it eventually enters the Hylebos wetland/stream system. 3.1.4 Task 4 - Drainage System Description and Problem Descriptions The drainage system is comprised mostly of an existing conveyance system which outlets into the Puget sound. There were not existing or potential problems identified. 3.1.5 Task 5 - Mitigation of Existing or Potential Problems There does not appear to be any existing or potential problems (other than standard maintenance of the drainage system) associated with the site. RJ J J N BEYLER �. Q:�JVe•ilt Page 12 Xu Short Plat IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN The stormwater flow control and water quality facilities were designed in accordance with the 2009 Manual. Existing Site Hydrology (Part A) Existing conditions on the project site consists of a residential improved 1.578 acre parcel. The project is made up of one sub basin where the site generally slopes down from the east to west over a relatively flat grade. The overall vertical relief of the site is approximately 6 feet. Slopes across the site are generally range from 2 - 12 percent. Currently the site is covered with a large amount of deciduous trees. Approximately 50% of the existing trees will be removed to allow for the proposed 6 residential structures together with their associated infrastructure. According to the geotechnical report, the topsoil is approximately 6" to 12" thick. It is likely that with the thick topsoil cover and the large tree canopy cover, most stormwater is absorbed into the soil with very little turning into runoff. Developed Site Hydrology Part B ' The disturbance on site will include construction clearing and grading, construction the shared use driveway, associated utilities, a stormwater detention pond, and eventually the 5 future houses. The future driveways and rooftops have been included in the stormwater calculations. All rooftop runoff will be collected and tightlined to the detention pond. It is proposed that runoff from each driveway on lots 1 through 3 be collected and tightlined to the detention pond. If during final engineering it is more feasible to bypass the driveway runoff from lots 1 through 3, this will be looked at as an alternative. The individual driveways for lots 4 and 5 will slope toward the shared use permeable driveway. The shared use permeable driveway will allow the site to take advantage of the treatment soils on the site. Tables .4.1 and 4.2 break down the historic and developed site conditions TABLE 4.1 — Historic Conditions Sub -basin Total Area Impervious Till Grass Till Forest sf ac Sf ac Sf ac sf ac Site* 64,793 0 0 64,793 Offsite 1,884 1,884 66,677 66,677 TOTAL (1.531) 1 (1.531 *The area reflects the site area after ROW dedication r �7 BEYLER CONSULTING Page 13 Xu Short Plat J TABLE 4.2 — Developed Conditions Total Impervious Till Grass PGIS Sub -basin s# ac S# ac S# ac n Site 641,793 Offsite 1,884 Offsite Shared Access 455 Offsite Conc. Walk 1,429 n Porous Shared Access 4,836 y Drive Future Rooftops** 17,500 n Future Conc. Drive*** 2,500 Total Lawn 39,957 n 66,677 26,720 39,957 TOTAL 1.531 0.613 0.917 7,791 TOTAL PGIS 0.179 ** 3,500 sf has been assumed for future rooftops for each lot *** 500 sf has been assumed for future drive surfaces for each lot Performance Standards Part C Flow Control Facility (1.2.3.1. B : The proposed project is located within the City of Federal Way's Conservation Flow Control Area. This is equivalent to Conservation Flow Control in the King Manual which matches requiring runoff from developments to be detained and released at a rate that matches the flow duration of pre -developed rates. This is for a range of pre -developed discharge rates from 50% of the 2-year peak flow up to the full 50-year peak flow and applied to target surfaces only. The above is required unless an exception applies to the proposed site conditions. The project does not qualify for an exception, thus a flow control facility is proposed. The project will utilize an above ground detention pond on the northern end of the property to detain flow and release and historical rates. Flow Control BMPs: In addition to flow control facility requirements, projects subject to Core Requirement #3 must apply flow control BMPs to impervious surfaces on each individual lot. Flow control BMPs are methods and design for dispersing, infiltrating, or otherwise reducing development increases in runoff. Flow Control BMPs are proposed as a part of this short plat are proposed to be implemented at time of building permit. This may change as the project progresses forward. Water Quality The site falls within the Enhanced Basic Water Quality treatment area of the city according the Federal Way WQ Applications Map. The project meets the soil treatment exemption requirement per Section 1.2.8.4, exceeding the cation exchange capacity greater than 5 and an organic content greater than 0.5% minimum requirement. The project soils also have a measured infiltration rate of less than or equal to 9 inches per hour. Please refer to the prepared Geotechnical report and supplement letter for details on the cation exchange rate and infiltration rates. &I BEYLER CQN$U V71YG The project proposes to take advantage the treatment suitable soils by proposing pervious asphalt for the shared access driveway. The remaining Pollution Generating Impervious Surfaces (PGIS) consists of the individual driveways for each lot. Lots 4 and 5 are to slope toward the pervious shared use driveway to these driveways to also take advantage for the treatment soils. The remaining 3 individual driveways equate to approximately 1,500 sf of PGIS, which is less than the 5,000 sf threshold, thus exempting stormwater from formal treatment. The existing soils suitable for infiltration/treatment while utilizing pervious asphalt are relatively shallow. The owner will work with the geotechnical engineering to find a suitable design and special attention will be needed during final grading and construction of the pervious asphalt. No formal treatment facilities have been proposed at this time. Stormwater Conveyance The conveyance system capacity standards require that new conveyance systems contain the 25-year peak flow and ensure that the 100-year event does not create a severe flooding or erosion problem. See Section V of this report for the conveyance analysis per Core Requirement #4. Flow Control Systems (Part D Pervious Asphalt A pervious asphalt roadway section will be provided by the geotechnical engineering under separate letter. The pervious asphalt will be provided to take advantage of the treatment soils on the site. The existing soils suitable for infiltration/treatment while utilizing pervious asphalt are relatively shallow. The owner will work with the geotechnical engineering to find a suitable design and special attention will be needed during final grading and construction of the pervious asphalt. Detention Pond The detention facility was designed under Section 5.3.1 of the Manual. The pond was designed to discharge flow under the Enhanced Basic Flow Control conditions as discussed in Part C of this section. The facility was sized according to HSPF methodology using King County Runoff Time Series (KCTRS) software per Section 3.2.2 of the Manual. The pond will have a primary control structure designed to discharge stormwater per the flow control requirements. The flow control system utilizes a flow-restrictor tee with multiple orifices as shown in Figure 5.3.4.A of the Manual. The required volume is based on several factors. The size of the contributing basin, the type of ground cover, and any applicable flow control BMP facility sizing credits listed in Table 5.2.2.A of the Manual. See Table 4.3.A below for the pond basin areas used for input into KCTRS. The pond was sized using KCRTS and the basin information listed in Table 4.1 & 4.2. A volume of 113,506 cf has been calculated using a detention depth of 4 feet deep. Flow Control BMP Credits were utilized per Table 1.2.3.0 of the Manual and reflected below in Table 4.3. The Pervious asphalt was considered 50% till grass and 50% impervious. D BEYLER Sub -basin Ak$Lt 4.3 - ueyel0 ea MKIL I J ln�uz VImpervious (ac) Till Grass ac Bypass Im erviousac Rooftops 17,500 sf (0.402) Pervious Pavement 2,418 sf 0.056 2,418 sf 0.056 Driveways 2,500 sf 0.057 Offsite Impervious 1,884 sf (0.043) Total Lawn 39,957 sf 0.917 Total 0.043 ac 0.52 ac 0.97 ac TABLE 4.4 — Pond Volume Summary Storage Required Provided Pond Function Interval Volume cf Volume cf Sediment Storage 403.5-404.0 - - Detention 404.0-409.0 13,225 16,986 Freeboard 409.0-410.0 - - I� Control Structure (Primary Discharge Control) The control structure was designed to use multiple orifices in order to discharge flow at a basic flow control release rate. Flow through these offices may be determined at any given elevation through the following equations listed in Section 5.3.4.2 of the Manual: Q = CA 2gh , (Orifice) Where C = 0.62, A is the area of the orifice in square feet, g is the gravity constant, and h is the headwater in feet, and Qweir = 9.739DH3 Z, (Weir) Where D equals the diameter of the riser (24 inches) TABLE 4.5 — Flow Summary Pond Stage Elevation Head, h (ft) Flow Rate, Q (cfs 404.0 0 0 405.0 1 0.011 406.0 2 0.015 407.0 3 0.018 408.0 4 0.041 409.0 5 0.071 Primary Overflow The primary overflow is the overflow weir on the 24-inch diameter control riser. The weir is intended as a safety measure if any of the orifices are plugged. The bottom of the weir (top Page 16 D " Short Plat: BEYLER of riser) is set at the peak detention volume storage depth. Per Table 3.2 of the Manual, KCRTS with 15-minute time steps is to be used to calculate the peak flow if the majority of the tributary area is detained. Per section 5.3.1.1 of the Manual, the 100-year, 15-minute developed peak must be able to bypass the control structure. The developed 100-yr, 15-minute peak flow = 1.11 cfs. See the following pages for KCRTS output. The freeboard necessary above the top of the riser to allow for primary overflow is determined from the weir equation as shown above. 1.1 lcfs = 9.739(2)(H312) , H = 0.61 ft = 9.3 Twelve inches of freeboard has been provided above the top of the control structure. Downstream Pipe Conveyance 12" N-12 100-yr, 15-minute peak flow, Q = 1.11 cfs Pipe Diameter, D = 12" = 1.0' Cross sectional Area, A = 0.7854 sf Manning's n = 0.012 Hydraulic radius of full pipe, R = D/4 = 1.0/4 = 0.25' Calculate pipe capacity at 1.0% slope Q _.1.49 A(R2i3)(SO-15 = 1.49 (0.7854)(0.25213)(0.010 5) = 3.86cfs n 0.012 Peak flow = 3.86 < Capacity = 1.11 cfs - Oka For further conveyance analysis, see Section V of this report. _ , Page 17 Xu Short Plat BEYLER KCRTS Peak Flow Output (15-minute time Steps) Flow Frequency Analysis Time Series File:devl5.tsf Project Location: Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis ------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob CF5 CF5 Period 0.268 6 2/09 01 12:30 1.11 _ 1 100.00 0.990 0.211 7 1/05/0215:00 0.687 2 25.00 0.960 0.687 2 12/08/0217:15 0.519 3 10.00 0.900 0.207 8 8/26/04 0:45 0.372 4 5.00 0.800 0.519 3 11/17/04 5:00 0.345 5 3.00 0.667 0.345 5 10/27/0510:45 0.268 6 2.00 0.500 0.372 4 10/25/06 22:45 0.211 7 1.30 0.231 1.11 1 1/09/08 6:30 0.207 8 1.10 0.091 Computed Peaks 0.970 50.00 0.980 ye. Paused - D—fi- Fnxp, -KCRIS 4 O �� t BEYLER Page 18 Xu Short Plat Flow Frequency Analysis Time Series File: predev.tsf Project Location: Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.094 2 2/09/0118:00 0.121 1 100.00 0.990 0.026 7 1/06/02 3:00 0.094 2 25.00 0.960 0.070 4 2/28/03 3:00 0.072 3 10.00 0.900 0.003 8 3/24/04 20:00 0.070 4 5.00 0.800 0.042 6 1/05/05 8:00 0.061 5 3.00 0.667 0.072 3 1/18/06 21:00 0.042 6 2.00 0.500 0.061 5 11/24/06 4:00 0.026 7 1.30 0.231 0.121 1 1/09/08 9:00 0.003 8 1.10 0.091 Computed Peaks 0.112 50.00 0.980 Flow Frequency Analysis Time Series File:dev.tsf Project Location: Sea-Tac ---Annual Peak Flow Rates--- -----Flow Frequency Analysis------- FlowRate Rank Time of Peak - - Peaks - - Rank Return Prob (CFS) (CFS) Period 0.215 5 2/09/01 2:00 0.454 1 100.00 0.990 0.157 7 1/05/0216:00 0.262 2 25.00 0.960 0.262 2 2/27/03 7:00 0.226 3 10.00 0.900 0.149 8 8/26/04 2:00 0.216 4 5.00 0.800 0.185 6 10/28/0416:00 0.215 5 3.00 0.667 0.226 3 1/18/0616:00 0.185 6 2.00 0.500 0.216 4 10/26/06 0:00 0.157 7 1.30 0.231 0.454 1 1/09/08 6:00 0.149 8 1.10 0.091 Computed Peaks 0.390 50.00 0.980 J J 60 BEYLER C Q N SU LTI BC. Page 19 Xu Short Plat Retention/Detention Facility i Type of Facility: Detention Pond Side Slope: 2.00 H:1V Pond Bottom Length: 57.45 ft Pond Bottom Width: 28.72 ft Pond Bottom Area: 1650. sq. ft Top Area at 1 ft. FB: 4294. sq. ft 1 0.099 acres J Effective Storage Depth: 5.00 ft Stage 0 Elevation: 0.00 ft Storage Volume: 13225. cu. ft 0.304 ac-ft I Riser Head: 5.00 ft Riser Diameter: 12.00 inches ^� Number of orifices: 2 Full Head Pipe Orifice # Height Diameter Discharge Diameter - (ft) (in) (CFS) (in) 1 0.00 0.62 0.023 2 3.75 1.25 0.047 4.0 Top Notch Weir: None Outflow Rating Curve: None T Stage Elevation Storage Discharge Percolation Surf Area (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) (sq. ft) jl 0.00 0.00 0. 0.000 0.000 0.00 1650. 0.01 0.01 17. 0.000 0.001 0.00 1653. 0.02 0.02 33. 0.001 0.001 0.00 1657. 0.03 0.03 50. 0.001 0.002 0.00 1660. 0.04 0.04 66. 0.002 0.002 0.00 1664. 0.05 0.05 83. 0.002 0.002 0.00 1667. 1 0.15 0.15 251. 0.006 0.004 0.00 1702. 0.25 0.25 423. 0.010 0.005 0.00 1737. 0.35 0.35 599. 0.014 0.006 0.00 1773. 0.45 0.45 778. 0.018 0.007 0.00 1808. 1 ]]]] 0.55 0.55 961. 0.022 0.008 0.00 1844. 0.65 0.65 1147. 0.026 0.008 0.00 1881. 0.75 0.75 1337. 0.031 0.009 0.00 1918. J 0.85 0.85 1530. 0.035 0.010 0.00 1955. 0.95 0.95 1728. 0.040 0.010 0.00 1992. 1.05 1.05 1929. 0.044 0.011 0.00 2030. 1.15 1.15 2134. 0.049 0.011 0.00 2068. 1.25 1.25 2342. 0.054 0.012 0.00 2106. 1.35 1.35 2555. 0.059 0.012 0.00 2144. 1.45 1.45 2771. 0.064 0.013 0.00 2183. 1.55 1.55 2991. 0.069 0.013 0.00 2223. 1.65 1.65 3216. 0.074 0.013 0.00 2262. j 1.75 1.75 3444. 0.079 0.014 0.00 2302. J 1.85 1.85 3676. 0.084 0.014 0.00 2342. 1.95 1.95 3912. 0.090 0.015 0:00 2383. 2.05 2.05 4153. 0.095 0.015 0.00 2424. Page 20 im Xu Short Plat BEYLER i 2.15 2.15 4397. 0.101 0.015 0.00 2465. 2.25 2.25 4646. 0.107 0.016 0.00 2507. 2.35 2.35 4898. 0.112 0.016 0.00 2548. 2.45 2.45 5155. 0.118 0.016 0.00 2590. 2.55 2.55 5417. 0.124 0.017 0.00 2633. 2.65 2.65 5682. 0.130 0.017 0.00 2676. 2.75 2.75 5952. 0.137 0.017 0.00 2719. 2.85 2.85 6226. 0.143 0.018 0.00 2762. 2.95 2.95 6504. 0.149 0.018 0.00 2806. 3.05 3.05 6787. 0.156 0.018 0.00 2850. 3.15 3.15 7074. 0.162 0.019 0.00 2894. 3.25 3.25 7366. 0.169 0.019 0.00 2939. 3.35 3.35 7662. 0.176 0.019 0.00 2984. 3.45 3.45 7963. 0.183 0.019 0.00 3030. 3.55 3.55 8268. 0.190 0.020 0.00 3075. 3.65 3.65 8578. 0.197 0.020 0.00 3121. 3.75 3.75 8892. 0.204 0.020 0.00 3168. 3.76 3.76 8924. 0.205 0.021 0.00 3172. 3.78 3.78 8988. 0.206 0.021 0.00 3181. 3.79 3.79 9019. 0.207 0.023 0.00 3186. 3.80 3.80 9051. 0.208 0.025 0.00 3191. 3.82 3.82 9115. 0.209 0.028 0.00 3200. 3.83 3.83 9147. 0.210 0.032 0.00 3205. 3.84 3.84 9179. 0.211 0.033 0.00 3209. 3.85 3.85 9211. 0.211 0.034 0.00 3214. 3.87 3.87 9276. 0.213 0.035 0.00 3224. 3.97 3.97 9600. 0.220 0.041 0.00 3271. 4.07 4.07 9930. 0.228 0.045 0.00 3318. 4.17 4.17 10264. 0.236 0.049 0.00 3366. 4.27 4.27 10603. 0.243 0.052 0.00 3413. 4.37 4.37 10947. 0.251 0.055 0.00 3462. 4.47 4.47 11295. 0.259 0.058 0.00 3510. 4.57 4.57 11649. 0.267 0.061 0.00 3559. 4.67 4.67 12007. 0.276 0.063 0.00 3609. 4.77 4.77 12371. 0.284 0.066 0.00 3658. 4.87 4.87 12739. 0.292 0.068 0.00 3708. 4.97 4.97 13112. 0.301 0.070 0.00 3758. 5.00 5.00 13225. 0.304 0.071 0.00 3773. 5.10 5.10 13605. 0.312 0.381 0.00 3824. 5.20 5.20 13990. 0.321 0.946 0.00 3875. 5.30 5.30 14380. 0.330 1.680 0.00 3926. 5.40 5.40 14775. 0.339 2.470 0.00 3978. 5.50 5.50 15176. 0.348 2.750 0.00 4030. 5.60 5.60 15581. 0.358 3.010 0.00 4082. 5.70 5.70 15992. 0.367 3.250 0.00 4134. 5.80 5.80 16408. 0.377 3.470 0.00 4187. 5.90 5.90 16829. 0.386 3.680 0.00 4241. 6.00 6.00 17256. 0.396 3.870 0.00 4294. 6.10 6.10 17688. 0.406 4.060 0.00 4348. 6:20 6.20 18126. 0.416 4.240 0.00 4402. 6.30 6.30 18569. 0.426 4.410 0.00 4456. 6.40 6.40 19017. 0.437 4.570 0.00 4511. 6.50 6.50 19471. 0.447 4.730 0.00 4566. 6.60 6.60 19930. 0.458 4.880 0.00 4622. �1 t BEYLER 0 SIT IN Page 21 Xu Short Plat 6.70 6.70 20395. 0.468 5.030 0.00 4678. 6.80 6.80 20866. 0.479 5.180 0.00 4734. 6.90 6.90 21342. 0.490 5.320 0.00 4790. 7.00 7.00 21824. 0.501 5.450 0.00 4847. Hyd Inflow Outflow Peak Storage Stage Elev (Cu-Ft) (Ac-Ft) 1 0.45 0.30 5.07 5.07 13506. 0.310 2 0.21 0.09 5.01 5.01 13245. 0.304 3 0.21 0.05 4.34 4.34 10856. 0.249 4 0.26 0.06 4.54 4.54 11538. 0.265 5 0.23 0.04 3.96 3.96 9568. 0.220 6 0.13 0.02 3.77 3.77 8945. 0.205 7 0.15 0.01 1.70 1.70 3331. 0.076 8 0.16 0.02 3.04 3.04 6767. 0.155 �j Hyd R/D Facility Tributary Reservoir POC Outflow i Outflow Inflow Inflow Target Calc 1 0.30 0.02 ******** ******* 0.31 -� 2 0.09 0.01 ******** 0.09 0.09 3 0.05 0.01 ******** ******* 0.06 4 0.06 0.01 ******** ******* 0.06 5 0.04 0.01 ******** ******* 0.04 1 6 0.02 0.01 ******** ******* 0.02 I7 0.01 0.01 ******** ******* 0.02 8 0.02 0.01 ******** ******* 0.02 Route 'Time Series through Facility Inflow Time Series File:dev.tsf Outflow Time Series File:rdout POC Time Series File:ddout j Inflow/Outflow Analysis 1 Peak Inflow Discharge: Peak Outflow Discharge: Peak Reservoir Stage: Peak Reservoir Elev: Peak Reservoir Storage: j I I j 0.454 CFS at 6:00 on Jan 9 in Year 8 0.300 CFS at 10:00 on Jan 9 in Year 8 5.07 Ft 5.07 Ft 13506. Cu-Ft 0.310 Ac-Ft Add Time Series:bypass.tsf Peak Summed Discharge: 0.308 CFS at 10:00 on Jan 9 in Year 8 Point of Compliance File:dsout.tsf Flow Duration from Time Series File:rdout.tsf Cutoff Count Frequency CDF Exceedence_Probability CFS % o % 0.001 35801 58.384 58.384 41.616 0.416E+00 0.004 6383 10.409 68.793 31.207 0.312E+00 0.007 5452 8.891 77.684 22.316 0.223E+00 0.009 4311 7.030 84.715 15.285 0.153E+00 0.012 3537 5.768 90.483 9.517 0.952E-01 0.015 2380 3.881 94.364 5.636 0.564E-01 M BEYLER Page 22 Xu Short ?lai 1 1 1 I I I I j 0.017 1746 2.847 97.211 2.789 0.279E-01 0.020 1047 1.707 98.919 1.081 0.108E-01 0.023 332 0.541 99.460 0.540 0.540E-02 0.025 17 0.028 99.488 0.512 0.512E-02 0.028 19 0.031 99.519 0.481 0.481E-02 0.030 5 0.008 99.527 0.473 0.473E-02 0.033 12 0.020 99.547 0.453 0.453E-02 0.036 34 0.055 99.602 0.398 0.398E-02 0.038 36 0.059 99.661 0.339 0.339E-02 0.041 34 0.055 99.716 0.284 0.284E-02 0.044 21 0.034 99.750 0.250 0.250E-02 0.046 19 0.031 99.781 0.219 0.219E-02 0.049 25 0.041 99.822 0.178 0.178E-02 0.051 17 0.028 99.850 0.150 0.150E-02 0.054 20 0.033 99.883 0.117 0.117E-02 0.057 13 0.021 99.904 0.096 0.962E-03 0.059 12 0.020 99.923 0.077 0.766E-03 0.062 9 0.015 99.938 0.062 0.620E-03 0.065 5 0.008 99.946 0.054 0.538E-03 0.067 11 0.018 99.964 0.036 0.359E-03 0.070 13 0.021 99.985 0.015 0.147E-03 0.073 6 0.010 99.995 0.005 0.489E-04 0.075 0 0.000 99.995 0.005 0.489E-04 0.078 0 0.000 99.995 0.005 0.489E-04 0.080 1 0.002 99.997 0.003 0.326E-04 0.083 0 0.000 99.997 0.003 0.326E-04 0.086 0 0.000 99.997 0.003 0.326E-04 0.088 1 0.002 99.998 0.002 0.163E-04 0.091 0 0.000 99.998 0.002 0.163E-04 0.094 0 0.000 99.998 0.002 0.163E-04 Flow Duration Cutoff Count CFS 0.001 35465 0.004 6412 0.007 5215 0.009 4497 0.012 3828 0.015 2235 0.018 1686 0.020 1336 0.023 253 0.026 61 0.028 26 0.031 14 0.034 13 0.036 41 0.039 31 0.042 35 0.045 19 0.047 16 0.050 3C 0.053 17 e BEYLER from Time Series File:dsout.tsf Frequency CDF Exceedence_Probability 0 0 0 0 0 0 57.836 57.836 42.164 0.422E+00 10.457 68.293 31.707 0.317E+00 8.505 76.797 23.203 0.232E+00 7.334 84.131 15.869 0.159E+00 6.243 90.373 9.627 0.963E-01 3.645 94.018 5.982 0.598E-01 2.750 96.768 3.232 0.323E-01 2.179 98.947 1.053 0.105E-01 0.413 99.359 0.641 0.641E-02 0.099 99.459 0.541 0.541E-02 0.042 99.501 0.499 0.499E-02 0.023 99.524 0.476 0.476E-02 0.021 99.545 0.455 0.455E-02 0.067 99.612 0.388 0.388E-02 0.051 99.662 0.338 0.338E-02 0.057 99.720 0.280 0.280E-02 0.031 99.750 0.250 0.250E-02 0.026 99.777 0.223 0.223E-02 0.049 99.826 0.174 0.174E-02 0.028 99.853 0.147 0.147E-02 Palle 23 Xu Silos' Pia"- j I 0.055 21 0.034 0.058 9 0.015 0.061 12 0.020 0.063 12 0.020 0.066 2 0.003 0.069 13 0.021 0.072 14 0.023 0.074 3 0.005 0.077 1 0.002 0.080 1 0.002 0.082 0 0.000 0.085 0 0.000 0.088 0 0.000 0.090 1 0.002 0.093 0 0.000 0.096 0 0.000 Duration Comparison Anaylsis Base File: predev.tsf New File: dsout.tsf 99.887 99.902 99.922 99.941 99.945 99.966 99.989 99.993 99.995 99.997 99.997 99.997 99.997 99.998 99.998 99.998 Cutoff Units: Discharge in CFS Cutoff 0.021 0.026 0.032 0.038 0.043 0.049 0.055 0.060 0.066 0.071 0.077 0.083 0.088 0.094 -----Fraction of Time----- BaseNew %Change 0.93E-02 0.90E-02 -2.8 0.62E-02 0.53E-02 -15.9 0.49E-02 0.47E-02 -4.6 0.37E-02 0.37E-02 -0.4 0.29E-02 0.26E-02 -9.7 0.22E-02 0.19E-02 -12.5 0.15E-02 0.12E-02 -17.6 0.10E-02 0.85E-03 -17.5 0.65E-03 0.55E-03 -15.0 0.34E-03 0.11E-03 -66.7 0.24E-03 0.49E-04 -80.0 0.16E-03 0.33E-04 -80.0 0.11E-03 0.33E-04 -71.4 0.16E-04 0.16E-04 0.0 0.113 0.113E-02 0.098 0.978E-03 0.078 0.783E-03 0.059 0.587E-03 0.055 0.554E-03 0.034 0.342E-03 0.011 0.114E-03 0.007 0.652E-04 0.005 0.489E-04 0.003 0.326E-04 0.003 0.326E-04 0.003 0.326E-04 0.003 0.326E-04 0.002 0.163E-04 0.002 0.163E-04 0.002 0.163E-04 ---------Check of Probability Base 0.93E-02 0.021 0.62E-02 0.026 0.49E-02 0.032 0.37E-02 0.038 0.29E-02 0.043 0.22E-02 0.049 0.15E-02 0.055 0.10E-02 0.060 0.65E-03 0.066 0.34E-03 0.071 0.24E-03 0.077 t 0.16E-03 0.083 0.11E-03 0.088 1 0.16E-04 0.094 Maximum positive excursion = 0.003 cfs ( 3.4%) occurring at 0.094 cfs on the Base Data:predev.tsf and at 0.097 cfs on the New Data:dsout.tsf Maximum negative excursion = 0.017 cfs (-18.8%) occurring at 0.089 cfs on the Base Data:predev.tsf and at 0.072 cfs on the New Data:dsout.tsf J J J W JBEYLER Tolerance------- New%Change 0.021 -0.7 0.023 -11.9 0.029 -9.8 0.038 -0.6 0.041 -4.6 0.047 -3.2 0.053 -3.7 0.057 -4.7 0.062 -5.2 0.069 -3.2 0.070 -8.9 0.071 -14.0 0.072 -18.3 0.097 3.0 Page 24 Xu ShO'L PlaI- Water Quality System (Part E) 1 The project meets the soil treatment exemption requirement per Section 1.2.8.4, exceeding the cation exchange capacity greater than 5 and an organic content greater than 0.5% minimum requirement. The measured soils are composed of less than 25% gravel by weight with more than 75% of the soil passing the #4 sieve, more than 50% of the soil passing the 1 #40 sieve and more than 2% passing the #100 sieve. Please refer to the prepared Geotechnical report and supplement letter for details on the cation exchange rate and ii infiltration rates. _I V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN The conveyance system was designed per Section 3 and 4 of the Manual. Table 3.2 of the Manual suggests that the Rational Method of analysis is required for undetained areas for tributary areas less than 10 ac. The software program, Storm and Sanitary Analysis, calibrated to site conditions, was utilized to analyze the conveyance of the proposed system. The backwater analysis for the proposed conveyance system was performed per Section 4.2.1.2 of the Manual. The design of the _ 1 system is based on the following: I0 Ration Method (Section 3.2.1 of the Manual) • King County I.D.F family • 25 year storm event flow • Proper Runoff coefficients • Appropriate Manning's Number Printouts from the program can be found in Appendix C of this report. The runoff coefficients, 'C', values were taken from Table 3.2.1.A in the Manual. A 'C' value j of 0.90 was used for paved and roof surfaces. The minimum time of concentration of 6.3 minutes was used. A Manning's number of 0.012 was chosen for Ductile Iron pipes. Conveyance Pipes The new onsite stormwater conveyance system has been proposed to convey runoff in a way that does not impact the drainage basin of the existing site. A conveyance and backwater analysis for the proposed project have been calculated as shown in Appendix C. Stormwater runoff will drain to catch basins and then flow through varying diameter storm pipes. New pipes are to be designed with sufficient capacity to convey and contain at minimum the 25-year peak flow and not cause a flooding nuisance during a 100- year storm event. If for larger storms that may overtop the storm structures, developed stormwater will be isolated on site. As mentioned in Section II of this report under the description of Core Requirement #4, offsite conveyance analysis for the existing conveyance system on 1st Ave SW and the school private access road was not performed per Section 1.2.4.2 of the Manual. Existing offsite conveyance y, Page 25 X:_; 5f,ort Plai. BEYLER systems need not be analyzed for conveyance capacity except as required by Core Requirement #2, or if offsite improvements or direct discharge are proposed per Core Requirement #3. VI. SPECIAL REPORTS AND STUDIES Geotechnical Report Geotechnica/ Engineering Report Proposed Short Plat, July 16, 2014; Prepared by GeoResources, LLC. This report is located in Appendix C of this TIR. VII. OTHER PERMITS There are currently no other permits that effect this Technical Information Report or engineering plan set. r VIII. CSWPPP ANALYSIS AND DESIGN Please refer to Appendix D for the prepared CSWPPP IX. BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT !! A completed Bond Quantities Worksheet can be made available to the City upon request. X. OPERATION AND MAINTENANCE MANUAL The Operations and Maintenance Manual can be made available to the City upon request. k. Page 26 ■ `�� k; Short Pla. BEYLER U] 0 w a x i u = d Can d d o E i� •a 'N a - O O O O G 0 o c O � O w O NN N L o o `� vi w Ito- O L O 0) NV O O O E N N N U1 d 3 �4 � v �A a, d Q O m a m m M' o O O O O .r O IC G' _C NO:C_ O �+ G O 0 c O 0 0 7 `y N N N r ago 0U,u) N G G q a°a�`•z° z z z° a� N C C 'a O c C1 N vi o cn o o o • N� UaUN C wa toOy CD O z O z Q z O z US O GI d d a 0 N �= c N L N M d rn ri M T O M I O N O y�� �a — E o o o � d a O 4 d°a)oE + c >� � c •L Q > F.,N w a • �= a a o N G O G� a�i0� o 0 O o� d� �o N c m > v8 =•N_'Taa� 10 c c c Gi !C • o : 6 cu •- u a> U N A N N N A v c °c. N U .N `C .ri -H •ri -r-I p` E E cn E N a ea O Z a o > n C) ~ Ei [� Ei Ei CN c+1 d+ .10 E U U U E+ v� N v cd rd x x x x King County Map REACH 4 - UNOFF IS CONTINUED TO BE TIGHTLINEDiJ T - - NORTHERLYALONG 21STAVE SW FOR OVER 1/4 4 ' r - DOWNSTREAM, EVENTUALLY tLF- ENTERING INTO THE HYLEBOSWETLAND/STREAM SYSTEM..-353 rd (L 5 tau.% aj �I- , PROJECT ;4 STORM R rq r OUTFALL WLL PROJECT I 29th St NE i �. , r' � � � SITE _. _e _. _� ' - JT-- REACH 2 - TIGHTLINED 280 LF WEST ALONG THE NORTH SIDE OF 356TH ST REACH 1 The information included on this nap has been comps ad by King County staff from a variety of sources and is subject to change without notice King County makes no representations orwarrarlies, express orimpfed, N KinCounty as to accuracy, completeness, timeliness, or rights to the use of such information. THs ducumenlis rory t intended 7 y for use as a survey product, King County shall be liable for any general, special, indirect, incidental, or consequential damages inducing, but nd lirriledrot lo, lost revenues orlosl profils resullffp from the use or misuse GIS CENTER of the Infolmis(an contained onlhismap Any sale of the map orinformalion on thisnw is prohibited except by writen permission of King County. Date:11/11/2015 Notes: IAPPENDIX B - GEOTECHNICAL REPORT I J j I . JBEYLER x:_i short Pia-. Ph. 253-896-1011 Fx. 253-896-2633 Sophia Xu c/o Beyler Consulting, LLC 10314 100th Street SW Lakewood, WA 98498 Attn: Mr. Brandon Loucks GeoResources, LLC 5007 Pacific Hwy. E, Suite 16 Fife, Washington 98424 July 16, 2014 Geotechnical Engineering Report Proposed Short Plat 1909 SW 356th Street Federal Way, Washington PN: 252103-9004 Job: Xu.20thAveSW INTRODUCTION This geotechnical report presents the results of our geotechnical site evaluation, subsurface explorations, laboratory testing, and geotechnical analyses for the proposed short plat to be constructed along the east side of 20th Avenue SW in Federal Way, Washington. The general location of the site is shown on the attached Site Vicinity Map, Figure 1. Our understanding of the project is based on our discussions with you and members of the design team. Our report incorporates the available geologic and soils data, our subsurface explorations, and our experience in the area. We understand that you propose to construct a 6-lot short plat in the current above referenced parcel. The proposed site development will include a new limited access roadway to three of the lots. We anticipate the proposed residences will consist of one or two-story structures supported on conventional spread footings. Additional development will include stormwater facilities and associated utilities. Pervious pavement may be used to mitigate stormwater runoff generated by the limited access roadway. The proposed site layout is shown in Figure 2, Site and Exploration Plan. PURPOSE & SCOPE The purpose of our services was to evaluate the surface and subsurface conditions at the site as a basis for providing geotechnical recommendations and design criteria for the proposed residential development. We also assessed potential adverse impacts to and from the slopes located within the site area. Specifically, our scope of services for the project included the following: 1. Reviewing existing geological and geotechnical literature for the site area: 2. Exploring the subsurface conditions by excavating a series of test pits at the proposed house site. 3. Describing surface and subsurface conditions, including soil types, and depth to groundwater, as appropriate;. 4. Conducting grain size tests on select soil samples collected from test pits at the site; Xu.20thAveSW . G R July 16, 2014 Page 2 5. Providing our opinion for stormwater management, including a preliminary infiltration rate based on grain size test data; 6. Conducting cation exchange and organic content tests on select soil samples; 7. Providing geotechnical conclusions and recommendations regarding site grading activities, including site preparation, subgrade preparation, fill placement criteria, suitability of on -site soils for use as structural fill, temporary and permanent cut and fill slopes, and drainage and erosion control measures; 8. Providing design criteria for the proposed structures, including foundation and floor slab support and design criteria, subgrade preparation, bearing capacity, friction values, and subgrade modulous; 9. Providing conclusions regarding subgrade preparation for the driveways and roadway area; 10. Preparing a written Geotechnical Report summarizing our site observations and conclusions, and providing our geotechnical recommendations and design criteria, along with the supporting data. Our services were originally outlined in our June 23, 2014 Proposal for Geotechnical Engineering Services. We received signed authorization to proceed with our scope of services on June 26, 2014. SITE CONDITIONS Surface Conditions The subject parcel is located along the east side of 201h Avenue SW, south of SW 356th Street in Federal Way, Washington. The parcel forms an "L" shape, measuring approximately 335 feet north to south by 305 feet east to west and encompasses approximately 1.58 acres. The site is currently developed with a single family residence with access from SW 351 t" Street. The site is bounded by SW 3561h Street to the north, existing single family residences to the east and south and 201h Avenue SW to the west. The site is situated along the west portion of the Federal Way glacial upland area. The ground surface in the site area is generally flat to very gently sloping to the northwest at inclinations of 1 to 2 percent. Total topographic relief across the site is on the order of 4 feet. No surface water, seepage or evidence of erosion was observed at the site or the surrounding area during the time of our visit. No evidence of soil erosion or soil movement or deep-seated landslide activity was observed at the site or the adjacent areas at the time of our site visit. No areas of slope instability were reported in the published geological literature. Site Soils The USDA Natural Resource Conservation Service (NRCS) Web Soil Survey maps the soils in the area of the site as Alderwood gravelly sandy loam (AgC &AgD) Alderwood soils are derived from glacial till that form on 0 to 6 (AgC) and 6 to 15 (AgD) percent slopes and are listed as having "slight" to "moderate" erosion hazards when exposed. The majority of the western portion of the parcel is comprised of AgC type soils. A copy of the SCS map for the site vicinity is attached as Figure 3. Site Geology The Geologic Map of the Poverty Bay 7.5-minute Quadrangle, Pierce County, Washington by Booth, Waldron and Troost (2003) indicates the site is underlain by Vashon glacial till (Qvt). These glacial soils -were deposited during the most recent Vashon Stade of the Fraser Glaciation, approximately 12,000 to 15,000 years ago. The glacial till consists of a heterogeneous mixture of clay, silt, sand and gravel that was deposited at the base of the Xu.20thAveSW . G R July 16, 2014 Page 3 continental ice mass and subsequently over ridden. As such, the glacial till is considered over - consolidated and exhibits high strength and low compressibility characteristics where undisturbed. These soils have been disturbed through natural weathering processes since that time and therefore in a loose to medium dense condition near the surface. No areas of landslides or landslide debris are mapped on or within the vicinity of the site. An excerpt of the above referenced map is included as Figure 4. Subsurface Explorations On July 3, 2014 GeoResources explored subsurface conditions at the site by monitoring the excavation of five test pits in the proposed development area. The test pits were excavated by a small track mounted machine operated by a licensed contractor. Table 1, below, summarizes the approximate locations, surface elevations, and termination depths of our test pits explorations. The locations of the test pits were selected by GeoResources personnel in the field based on discussions regarding the proposed development, along with site access limitations. A field geologist from our office continuously monitored the excavations, maintained logs of the subsurface conditions encountered, obtained representative soil samples, and observed pertinent site features. Representative soil samples obtained from the test pits were placed in sealed plastic sample bags and taken to a laboratory for further examination and testing as deemed necessary. Each test pit was then backfilled with the excavated soil material. TABLE 1 APPROXIMATE LOCATIONS, ELEVATIONS, AND DEPTHS OF EXPLORATIONS Test Pitt Boring Number Functional Location Surface Elevation' (feet) Termination Depth (feet) Termination Elevation (feet) TP-1 NW corner of parcel 412 71/2 4041/2 TP-2 W Edge of parcel, centered 412 61/2 4051/2 TP-3 SW corner of parcel 412 6 406 TP-4 S edge of parcel, centered 412 7 1/2 4041/2 TP-5 SE corner of parcel 412 6 406 ' Elevation datum: site plan prepared by Beyler Consulting, LLC using the City of Federal Way NGVD29 datum The attached Test pit Logs describe the vertical sequence of soils encountered at each pit location. Where a soil type changed between sample intervals, we estimated the contact depth based measurement from original ground surface. The test pits excavated for this evaluation indicate the subsurface conditions at specific locations only, as actual subsurface conditions can vary across the site. Furthermore, the nature and extent of such variation would not become evident until additional explorations are performed or until construction activities have begun. Based on our experience in the area and extent of prior explorations in the area, it is our opinion that the soils encountered in the test pits are generally representative of the soils at the site. The approximate locations of the test pits are indicated on the attached Site and Exploration Plan as Figure 2. Test pit logs are presented in Figure 6a and 6b. Subsurface Conditions Our test pits and hand explorations encountered relatively uniform subsurface conditions that generally confirmed the mapped stratigraphy. The test pits extended to depths ranging from 6 to 71/2 feet below the existing ground surface. . The stratigraphy across the site, as observed in our test pits, generally consisted of 1/2 to 1 foot of forest duff and sandy topsoil overlying 1 1/2 to 2 feet of loose to medium dense, silty sand with varying minor amounts of Xu.20thAveSW .G R July 16, 2014 Page 4 gravel. We interpret these surficial soils to be weathered glacial till. The underlying glacial till encountered in the explorations was observed to be in a dense to very dense condition. Based on our experience, the Vashon glacial till material is underlain by advance outwash deposits at depth. The glacial till was observed in all explorations to the full depth explored. The subsurface conditions encountered in each test pit are included below in Table 2. Descriptions of the various soil types encountered across the site are summarized in the following sections. -- - -- TABLE 2 APPROXIMATE THICKNESSES, DEPTHS, AND ELEVATIONS OF SOIL LAYERS ENCOUNTERED IN EXPLORATIONS Test Pit Thickness of Thickness of Depth to Elevation of /Boring Forest Duff / Weathered Glacial Till Glacial TIII Number Topsoil Glacial till (feet) (feet) (feet) (feet) TP-1 1/z 1 2 2'/z 409'/z TP-2 1 1 t/z 2'/z 409'/z TP-3 1 1 1/2 2 409'/2 TP-4 '/z 1 t/2 2 409'/z TP-5 '/z 1 '/2 2 4091/2 Elevation datum: site plan prepared by Care Design using the City of Federal Way NGVD29 datum The soils encountered were visually classified in accordance with the Unified Soil Classification System (USCS) described in Figure 5. The test pit logs are presented in Figures 6a and 6b. Laboratory Testing Geotechnical laboratory tests were performed on select samples retrieved from the test pits to determine soil index and engineering properties encountered. Laboratory testing included visual soil classification per ASTM D: 2488, moisture content determinations per ASTM D: 2216, and grain size analyses. Grain size analyses tests were performed in accordance with the ASTM D:422 standard procedures. The enclosed laboratory testing sheets graphically present our test results, presented in Figures 7 and 8. Cation exchange capacity (CEC) and organic content testing was also performed by Spectra Laboratories to evaluate the treatment ability of the upper 2 feet of the existing subgrade for pervious pavement. Per the 2005 Stormwater Management Manual for Western Washington (SWMMWW) a minimum cation exchange capacity of 5 meq/100g is required. The soils tested had a CEC of 18.7 mEq/100g per SW846 9081 and an organic content of 5.0 percent per ASTM 2974. The results of these tests are presented in Figure 9. Grain Size Analysis Geotechnical laboratory tests were performed on select samples retrieved from the test pits to determine soil index and engineering properties encountered. Laboratory testing included visual soil classification per ASTM D: 2488, moisture content determinations per ASTM D: 2216, and grain size analyses. Grain size analyses tests were performed in accordance with the ASTM D: 422 standard procedures. The results of the laboratory tests are described below in Table 3. The laboratory test results are presented in Figure 7a-b. Xu.20thAveSW.GR July 16, 2014 Page 5 -- - -��TABLE 3 LABORATORY TEST RESULTS FOR ON -SITE SOILS Sample Gravel Sand Slit/Clay 1310 Soil Type Number Content Content Content Ratio (percent) (percent) (percent) (mm) Weathered Glacial Till TP-5, 2 20 50 30 - Glacial Till TP-1, 7.5 1 6 52 42 - ND = Not determined Groundwater Conditions No groundwater seepage was observed in the test pits at the time of excavation. However a minor amount of staining was observed in the dense glacial soils. This may be indicative of seasonal perched groundwater. Perched groundwater develops when the vertical infiltration rate of precipitation through a more permeable soil is slowed at depth by a deeper, less permeable soil type. We expect that perched groundwater develops during the wet winter months atop the dense glacial till at the site GEOLOGIC HAZARDS The City of Federal Way Critical Areas Ordinance for Geologically Hazardous Areas (Chapter 19.05.0707G, 19.160, and Chapter 15.10) state "geologically hazardous areas shall mean areas that, because of their susceptibility to erosion, landsliding, seismic or other geological events, are not suited to siting commercial, residential or industrial development consistent with public health or safety concerns". The Revised Code of Federal Way is copied in italics, while our comments to the code are immediately following the code. Erosion Hazard Areas per Federal Way Revised Code Chapter 19.05.070.G(1) The City of Federal Way code defines erosion hazard areas as "those areas having a "severe" or "very severe" erosion hazard due to natural agents such as wind, rain, splash, frost action or stream flow." The USDA NRCS maps the soils on the flatter upland area as the Alderwood soils, the Alderwood soils typically have "slight" or "moderate to severe" erosion hazards, depending on slope inclination. The soils along the more steeply sloping southern and western margin of the site are mapped as the Alderwood-Kitsap formation which have a "servere" erosion hazard. Based on the mapping, the site does not meet the technical definition of an Erosion Hazard area per the City code. Landslide Hazard Areas per Federal Way Revised Code Chapter 19.05.070.G(2) The Federal Way City Code defines landslide hazard areas as "those areas potentially subject to episodic downslope movement of a mass of soil or rock including but not limited to the following areas: a. Any area with a combination of.- 1. Slopes greater than 15 percent, 2. Permeable sediment overlying a relatively impermeable sediment or bedrock, 3. Springs or groundwater seeps. b. Any area which has shown movement during the Holocene epoch, from 10,000 years ago to the present, or which is underlain by mass wastage debris of that epoch. Xu.20thAveSW.GR July 16, 2014 Page 6 c. Areas potentially unstable as a result of rapid stream incision, stream bank erosion, and undercutting by wave action. d. Areas located in a canyon or on an active alluvial fan, presently or potentially subject to inundation by debris flows or catastrophic flooding. e. Areas that have a "severe" limitation for building site development because of slope conditions, according to the USDA SCS. f. Those areas mapped as Class U (Unstable), Uos (Unstable old slides), and Urs (unstable recent slides) by the Department of Ecology. g. Slopes having a gradient steeper than 80 percent subject to rock fall during seismic shaking" From the above listed indicators we offer the following comments. There are no slopes on the parcel steeper than 15 percent and no areas are listed as having "severe" limitations for building site development according to USDA SCS. No evidence of recent or Holocene epoch movement, published geologic map indicate areas of landslide or mass wasting was noted on the subject property at the time of our site visit. No area of alluvial fans was noted or was observed on or within the vicinity of the subject site. Seismic Hazards per Federal Way Revised Code Chapter 19.05.070.G(3) The City of Federal Way Municipal Code defines seismic hazard areas as "those areas subject to severe risk of earthquake damage as a result of seismically induced ground shaking, slope failure, settlement or soil liquefaction, or surface faulting. These conditions occur in areas underlain by cohesionless soils of low density usually in association with a shallow groundwater table." According the City of Federal Way Municipal Code, the proposed single family residence will be required to be designed and constructed in accordance with the International Building Code (IBC) 2012. Characterization of soil profile type is required to determine the site class definition. Based on the inferred Standard Penetration Test (SPT) values as a result of our test pit explorations and subsequent laboratory testing, it is our opinion that the project site could be adequately classified as a Site Class C. Steep Slope Hazard per Federal Way Revised Code Chapter 19.05.070.G(4) The Federal Way City Code defines steep slope hazard areas as "those areas with a slope of 40 percent or greater and with a vertical relief of 10 or more feet, a vertical rise of 10 feet or more for every 25 feet of horizontal distance. A slope is delineated by established its toe and top and measured by averaging the inclination over at least 10 feet of vertical relief." As shown on the site and exploration plan, based on the topographic survey prepared by Beyler Consulting, LLC there are no slope areas greater than 40 percent or with a vertical relief of 10 or more feet. Buffers/Setbacks per Federal Way RCC 19.05.160 The Federal Way building code requires a 25-foot setback from geologically hazardous areas. No areas of the parcel meet the criteria as a geologically hazardous area and therefore no prescriptive buffers should be applied. CONCLUSIONS Based on our site observations, data review, subsurface explorations and our engineering analyses, it is our opinion that the proposed residential development is feasible from a geotechnical standpoint, provided the recommendations included herein are incorporated into the project plans. Xu.20thAveSW.GR July 16, 2014 Page 7 The new residence and other ancillary structures may be supported on conventional shallow foundations bearing on competent native soils or on structural fill placed above these native soils. The native soils at the site contain a variable percentage of fines (silt and clay -size particles), which makes them potentially moisture sensitive. These soils may become difficult to compact as structural fill in wet weather conditions. We therefore recommend that the earthwork portion of the project be completed during the drier weather conditions. Conventional stormwater infiltration on the site does not appear feasible in the native glacial till soils. However, an appropriately designed pervious pavement will function adequately. Geotechnical recommendations and design criteria area provided below. Site Preparation and Grading All structural areas on the site to be graded should be stripped of vegetation, organic surface soils, and other deleterious materials including existing structures, foundations or abandoned utility lines. Clearing should be limited to the area within the geologically hazardous areas limits identified on the Site and Exploration Plan, Figure 2. Organic topsoil is not suitable for use as structural fill, but may be used for limited depths in non-structural areas. Stripping depths ranging from 4 to 12 inches should be expected to remove these unsuitable soils. Areas of thicker topsoil'or organic debris may be encountered in areas of heavy vegetation or depressions. Where placement of fill material is required, the stripped/exposed subgrade areas should be compacted to a firm and unyielding surface prior to placement of fill material. Excavations for debris removal should be backfilled with structural fill compacted to the densities described in the "Structural Fill" section of this report. We recommend that a member of our staff verify the exposed subgrade conditions after excavations are completed and prior to placement of structural fill or new foundations. The exposed subgrade soil should be proof -rolled and compacted to a firm and unyielding condition. We recommend that trees be removed by overturning in fill areas so that a majority of the roots are removed. Excavations for tree stump removal should be backfilled with structural fill compacted to the densities described in the "Structural Fill" section of this report. Soft, loose or otherwise unsuitable areas delineated during proof -rolling or probing should be recompacted, if practical, or over -excavated and replaced with structural fill. The depth and extent of overexcavation should be evaluated by our field representative at the time of construction. The areas of fill should be evaluated during grading operations to determine if they need mitigation; recompaction or removal. Structural Fill All material placed as fill associated with mass grading, as utility trench backfill, under building areas, or under roadways should be placed as structural fill. The structural fill should be placed in horizontal lifts of appropriate thickness to allow adequate and uniform compaction of each lift. Fill should be compacted to at least 95 percent of MDD (maximum dry density as determined in accordance with ASTM D-1557). The appropriate lift thickness will depend on the fill characteristics and compaction equipment used. We recommend that the appropriate lift thickness be evaluated by our field representative during construction. We recommend that our representative be present during site grading activities to observe the work and perform field density tests. The suitability of material for use as structural fill will depend on the gradation and moisture content of the soil. As the amount of fines (material passing a US No. 200 sieve) increases, soil becomes increasingly sensitive to small changes in moisture content and adequate compaction becomes more difficult to achieve. During wet weather, we recommend Xu.20thAveSW .GR July 16, 2014 Page 8 use of well -graded sand and gravel with less than 5 percent (by weight) passing the US No. 200 sieve based on that fraction passing the 3/4-inch sieve, such as Gravel Backfill for Walls (WSDOT 9-03.12(2)). If prolonged dry weather prevails during the earthwork and foundation installation phase of construction, higher fines content (up to 10 to 12 percent) may be acceptable. Material placed for structural fill should be free of debris, organic matter, trash and cobbles greater than 6-inches in diameter. The moisture content of the fill material should be adjusted as necessary for proper compaction. Suitability of On -Site Materials as Fill During dry weather construction, non -organic on -site soil may be considered for use as structural fill; provided it meets the criteria described above in the "Structural Fill" section and can be compacted as recommended. If the soil material is over -optimum in moisture content when excavated, it will be necessary to aerate or dry the soil prior to placement as structural fill. We generally did not observe the site soils to be excessively moist at the time of our subsurface exploration program. The native weathered and glacial till soils in the site generally consist of silt with gravelly sand. These soils are generally comparable to "common borrow" material and will be suitable for use as structural fill provided the moisture content is maintained within 2 percent of the optimum moisture level. However, the high fines content makes these soils moisture sensitive. These soils will be difficult to adequately compact during extended periods of wet weather or where seepage occurs. We recommend that completed graded -areas be restricted from traffic or protected prior to wet weather conditions. The graded areas may be protected by paving, placing asphdlt-treated base, a layer of free -draining material such as pit run sand and gravel or clean crushed rock material containing less than 5 percent fines, or some combination of the above. In the Puget Sound area, wet weather generally begins about mid -October and continues through about May, although rainy periods could occur at any time of year. If possible, earthwork should be accomplished during the dry weather months of June through September. Most of the soil at the site likely contains sufficient fines to produce an unstable mixture when wet. Such soil is highly susceptible to changes in water content and tends to become unstable and difficult or impossible to proof -roll and compact if the moisture content significantly exceeds the optimum. In addition, during wet weather months, the groundwater levels could increase, resulting in seepage into site excavations. Performing earthwork during dry weather would reduce these problems and costs associated with rainwater, construction traffic, and handling of wet soil. We recommend that requirements for wet weather/wet construction for the earthwork portion of the project be incorporated into your contract specifications. Temporary Excavations All job site safety issues and precautions are the responsibility of the contractor providing services/work. The following cut/fill slope guidelines are provided for planning purposes only. Temporary cut slopes will likely be necessary during grading operations or utility installation. All excavations at the site associated with confined spaces, such as utility trenches and retaining walls, must be completed in accordance with local, state, or federal requirements. Based on current Washington Industrial Safety and Health Act (WISHA, WAC 296-155-66401) regulations, the shallow upper weathered soils on the site would be classified as Type C soils, where as the deeper, sandy, dense soils would be classified as Type B soils. According to WISHA, for temporary excavations of less than 20 feet in depth, the side slopes in Type B soils should be laid back at a slope inclination of 1 HA V, and Type C soils Xu.20thAveSW.GR July 16, 2014 Page 9 should be laid back at a slope inclination of 1.5H:1 V or flatter from the toe to top of the slope. It should be recognized that slopes of this nature do ravel and require occasional maintenance. All exposed slope faces should be covered with a durable reinforced plastic membrane, jute matting, or other erosion control mats during construction to prevent slope raveling and rutting during periods of precipitation. These guidelines assume that all surface loads are kept at a minimum distance of at least one half the depth of the cut away from the top of the slope and that significant seepage is not present on the slope face. Flatter cut slopes will be necessary where significant raveling or seepage occurs, or if construction materials will be stockpiled along the top of the slope. Where it is not feasible to slope the site soils back at these inclinations, a retaining structure should be considered. Where retaining structures are greater than 4-feet in height (bottom of footing to top of structure) or have slopes of greater than 15 percent above them, they should be engineered per Washington Administrative Code (WAC 51-16-080 item 5). This information is provided solely for the benefit of the owner and other design consultants, and should not be construed to imply that GeoResources assumes responsibility for job site safety. It is understood that job site safety is the sole responsibility of the project contractor. Foundation Support Based on the subsurface soil conditions encountered across the site, we recommend that spread footings for the new residences be founded on medium dense to dense native soils or on appropriately prepared structural fill that extends to suitable native soils. The soil at the base of the footing excavations should be disturbed as little as possible. All loose, soft or unsuitable material should be removed or recompacted, as appropriate. A representative from our firm should observe the foundation excavations to determine if suitable bearing surfaces have been prepared, particularly in the areas where the foundation will be situated on fill material. We recommend a minimum width of 24 inches for isolated footings, at least 12 inches for single story and 16 inches for two story continuous wall footings. All footing elements should be embedded at least 18 inches below grade for frost protection. Footings founded as described above can be designed using an allowable soil bearing capacity of 2,500 psf (pounds per square foot) for combined dead and long-term live loads. The weight of the footing and overlying backfill may be neglected. The allowable bearing value may be increased by one-third for transient loads such as those induced by seismic events or wind loads. Lateral loads may be resisted by friction on the base of footings and floor slabs and as passive pressure on the sides of footings. We recommend that an allowable coefficient of friction of 0.35 be used to calculate friction between the concrete and the underlying soil. Passive pressure may be determined using an allowable equivalent fluid density of 300 pcf (pounds per cubic foot). Passive resistance from soil should be ignored in the upper 1 foot. A factor of safety of 1.5 has been applied to these values. We estimate that settlements of footings designed and constructed as recommended will be less than 1/2 inch per 50 feet, for the anticipated load conditions, with differential settlements between comparably loaded footings of 1/2 inch or less. Most of the settlements should occur essentially as loads are being applied. However, disturbance of the foundation subgrade during construction could result in larger settlements than predicted. We recommend that all foundations be provided with footing drains. Floor Slab Support Slab -on -grade floors, where constructed, should be supported on the medium dense native soils or on structural fill prepared as described above. Areas of old fill material should Xu.20thAveSW .GR July 16, 2014 Page 10 be evaluated during grading activity for suitability of structural support. Areas of significant organic debris should be removed. We recommend that floor slabs be directly underlain by a minimum 4-inch thick pea gravel or washed 5/8 inch crushed rock. This layer should be placed and compacted to an unyielding condition and should contain less than 2 percent fines. A synthetic vapor retarder is recommended to control moisture migration through the slabs. This is of particular importance where the foundation elements are underlain by the silty till or lake sediments, or where moisture migration through the slab is an issue, such as where adhesives are used to anchor carpet or tile to the slab. A subgrade modulus of 400 kcf (kips per cubic foot) may be used for floor slab design. We estimate that settlement of the floor slabs designed and constructed as recommended, will be 1/2 inch or less over a span of 50 feet. Utilities We expect that underground utilities, such as sanitary sewer, storm, and water will consist of a series of pipes, vaults, manholes, and catch basins. The utility excavations should be performed in accordance with appropriate governmental guidelines. Utility pipes should be bedded and backfilled in accordance with American Public Works Association (APWA) specifications. We anticipate that the on -site, non -organic soils will be suitable for use as structural backfill. If import soil is used as utility trench backfill, it should consist of a material meeting the wet weather fill recommendations provided in the "Structural Fill" section of this report. We recommend that utility backfill soils be compacted according to the recommendations provided in the "Structural Fill" section of this report. Controlled -density fill (CDF) is most often suitable for use as backfill in any weather condition and could be used as a convenient, but more expensive, alternative to granular backfill soiI.CDF backfill does not require compaction but should have a minimum compressive strength of 250 psi commensurate with the application. Pavement Subgrades Pavement subgrade areas should be prepared as previously described in the "Site Preparation" section of this report unless pervious pavement is utilized. The prepared subgrade should be evaluated by proof -rolling with a fully -loaded dump truck or equivalent point load equipment. Soft, loose or wet areas that are disclosed should be recompacted or removed, as appropriate. Over -excavated areas should be backfilled with compacted structural fill and sub -base material. The upper 2 feet of roadway subgrade should have a density of at least 95 percent of the MDD (ASTM D-1577). In areas where the subgrade soils have a high percentage of fines, such as the onsite glacial till soils, the top 9-10 inches of the pavement section should consist of non -frost susceptible materials (HMA or less than 7% fines). Where pervious pavement is to be utilized the subgrade should not be compacted as described above, but simply rolled into place. A non -woven separation geotextile should be placed below the storage rock to prevent the migration of fines. We can provide a pavement thickness based on the expected traffic counts and loads. The subgrade storage layer is determine by the civil engineer. Erosion Control Weathering, erosion and the resulting surficial sloughing and shallow land sliding are natural processes that affect steep slope areas. As noted, no evidence of surficial raveling or sloughing was observed at the site. To manage and reduce the potential for these natural processes, we recommend grading... Xu.20thAveS W .G R July 16, 2014 Page 11 Erosion protection measures will need to be in place prior to the start of grading activity on the site. Erosion hazards can be mitigated by applying Best management Practices (BMP's) outlined in the Washington State Department of Ecology's (DOE) Stormwater Management Manual for Western Washington and the City of Federal Way's stormwater requirements (which uses the 2009 King County Surface Water Design Manual). Site Drainage All ground surfaces, pavements and sidewalks at the site should be sloped away from structures to the extent possible. The site should also be carefully graded to ensure positive drainage away from all structures and property lines. Surface water runoff from the roof area, driveways, perimeter footing drains, and wall drains, should be collected, tightlined, and conveyed to an appropriate discharge point. Alternatively, the stormwater runoff collected at the site can be directed to the stormwater system adjacent to the roadway. We recommend that footing drains are installed for the residence in accordance with IBC 1807.4.2, and basement walls (if utilized) have a wall drain as describe above, effectively the full height of the wall. The roof drain should not be connected to the footing drains. Stormwater Infiltration Based on our site observations, subsurface explorations and laboratory analysis; the shallow weathered soils at the site have the ability to infiltrate a limited amount of stormwater, provided the design is appropriate. Roof water should be mitigated using dispersion, connection to an existing storm system (roadway) or other alternative, as appropriate. Rain gardens are a suitable alternative. The glacial till soils at depth are very dense and infiltrate very slowly. These soils may be suitable to support porous pavement with an estimated long term infiltration rate of 0.25 inches per hour. The overlying 24 to 30 inches of weathered soils should provide adequate treatment capacity based on the cation and organic content test results. An overflow system should be included in the storage rock to prevent excess stormwater from flowing up and out of the pavement. Suspended solids could clog the underlying soil and reduce the infiltration rate of the pervious pavement. To reduce potential clogging of the pervious pavement, the pavement should not be connected to the stormwater runoff system until after construction is complete and the site area is landscaped, paved or otherwise protected. Temporary systems may be utilized through construction. After construction is complete we recommend the porous pavement be cleaned once per year using a vacuum sweeper. Construction Observation We recommend that GeoResources, LLC be retained to observe the geotechnical aspects of construction, particularly shoring (if necessary), foundations, retaining walls, fill placement and compaction, and drainage systems. These observations will allow us to verify the subsurface conditions as they are exposed during construction and to determine that work is accomplished in accordance with our recommendations. If conditions encountered during construction differ from those anticipated, we can provide recommendations for the conditions actually encountered. Our goal is to provide an appropriate amount of monitoring during earthwork activities to verify the soil conditions, make changes as appropriate, and provide you with a economic but adequately designed and constructed project. Xu.20thAveSW.GR July 16, 2014 Page 12 J J J J LIMITATIONS We have prepared this report for Mrs. Sophia Xu, Beyler Consulting, LLC and other members of the design team for use in evaluating a portion of this project. The data used in preparing this report and this report should be provided to prospective contractors. Our report analyses, conclusions and interpretations are based on data from others, our subsurface explorations and limited site reconnaissance, and should not be construed as a warranty of the subsurface conditions. Variations in subsurface conditions are possible between the explorations and may also occur with time. A contingency for unanticipated conditions should be included in the budget and schedule. Sufficient monitoring, testing and consultation should be provided by our firm during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether ,earthwork and foundation installation activities comply with contract plans and specifications. The scope of our services does not include services related to environmental evaluations or construction safety precautions. Our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in our report. If there are changes in the loads, grades, locations, configurations or type of facilities to be constructed, the conclusions and recommendations presented in this report may not be fully applicable. If such changes are made or site conditions change, we should be given the opportunity to review our recommendations and provide written modifications or verifications, as appropriate. We have appreciated working for you on this project. Please do not hesitate to call at your earliest convenience if you have questions or comments. Respectfully submitted, GeoResources, LLC Brad P Biggerstaff, LEG Principal t L• . I%- -: BPB:DCB/bpb Doc ID: Xu.20thAveSW.GR ' r4r;i„�_':-.;�•_�r~- Attachments: Figure 1: Vicinity Map I !�... , - • . Figure 2: Site Plan Figure 3: SCS Soil Survey Figure 4: USGS Geology Map Figure 5: Soil Classification System Figure 6a-b: Test Pit Logs Figure 7a-b: Grain Size Analysis Figure 8: Cation Exchange Analysis Dana C. Biggerstaff, PE Senior Geotechnical Engineer J III Approximate Site Location (Map created from Pierce County Public GIS http://matterhorn3.co.pierce.wa.us/pubIicgisn GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Site Vicinity Map Proposed Short Flat 1909 SW 356th Street Federal Way, Washington Not to Scale Fax: 253-896-2633 DocID: Xu.20thAveSW July 2014 1 Figure 1 I Approximate Site Location (Site plan provided by Beyler Consulting, LLC dated May 14, 2014) GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 Site & Exploration Plan Proposed Short Plat 1909 SW 356th Street Federal Way, Washington 1 DocID: Xu.20thAveSw July 2014 Not to Scale Figure 2 Approximate Site Location (map created from the USDA Natural Resource Conservation Service Web Soil Survey) Soil Soil Name Type Ag6 Alderwood gravelly sandy loam AgC Alderwood gravelly sandy loam Ek AN, t: S GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 l Hydrologic - Parent Material lopes Erosion Hazard Soils Grou Glacial till Glacial till M .. 6 to 15 I Moderate Not to Scale NRCS SCS Soils Map Proposed Short Plat 1909 SW 356t" Street Federal Way, Washington DocID: Xu.20thAveSW I July 2014 1 Figure 3 Approximate Site Location (An excerpt from the Geologic Map of the Poverty Bay 7.5-minute Quadrangle, Washington, Booth, D.B., Waldron, H.H., and Troost, K.G., 2003) Qvi Qvt Qva - Recessional outwash deposits/Ice contact deposits - Glacial till - Advance outwash deposits I GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 USGS Geologic Map Proposed Short Plat 1909 SW 356th Street Federal Way, Washington DocID: Xu.20thAveSW I July 2014 Not to Scale SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP SYMBOL GROUP NAME GRAVEL CLEAN GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GRAVEL GP COARSE POORLY -GRADED GRAVEL GRAINED More than 50% SOILS Of Coarse Fraction Retained on No. 4 Sieve GRAVEL WITH FINES GM SILTY GRAVEL GC CLAYEY GRAVEL SAND CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND More than 50% Retained on No. 200 Sieve SP POORLY -GRADED SAND More than 50% Of Coarse Fraction SAND SM SILTY SAND Passes WITH FINES No. 4 Sieve SC CLAYEY SAND SILT AND CLAY INORGANIC ML SILT CL FINE GRAINED CLAY SOILS ? Liquid Limit Less than 50 ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT More than 50% Passes CH CLAY OF HIGH PLASTICITY, FAT CLAY No. 200 Sieve Liquid Limit 50 or more ORGANIC CLAY, ORGANIC SILT ORGANIC OH HIGHLY ORGANIC SOILS PT PEAT f NOTES: 1. Field classification is based on visual examination of soil in general accordance with ASTM D2488-90. 2. Soil classification using laboratory tests is based on ASTM D2487-90. 3. Description of soil density or consistency are based on interpretation of blow count data, visual appearance of soils, and or test data. GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 SOIL MOISTURE MODIFIERS: Dry- Absence of moisture, dry to the touch Moist- Damp, but no visible water Wet- Visible free water or saturated, usually soil is obtained from below water table Soil Classification System Proposed Short Plat 1909 SW 356th Street Federal Way, Washington DocID: Xu.20thAveSW ` July 2014 Figure 5 Test Pit TP01 Location: NW corner of parcel Approximate Elevation: 412 feet Depth (feet) Soil Type Soil Description 0.0 - 0.5 - Light brown topsoil with fibrous root mat 0.5 - 2.5 SM Brown silty fine to medium SAND with some gravel (loose, moist) (weathered till horizon) 2.5 - 7.5 SM-GM Gray with minor orange staining silty fine to medium SAND with gravel (dense, moist) (glacial till) Terminated at 7.5 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Test Pit TP02 Location: W edge of parcel, centered Approximate Elevation: 412 feet Depth (feet) Soil Type Soil Description 0.0 - 1.0 Light brown topsoil with fibrous root mat 1.0 - 2.5 SM Brown silty fine to medium SAND with some gravel (loose, moist) (weathered till horizon) 2.5 - 6.5 SM-GM Gray with minor orange staining silty fine to medium SAND with gravel to cobbles (dense, moist) (glacial till) Terminated at 6.5 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Test Pit TP03 Location: SW Corner of site Approximate Elevation: 412 feet Depth (feet) Soil Type Soil Description 0.0 - 1.0 Light brown topsoil with fibrous root mat 1.0 - 2.5 SM Brown silty fine to medium SAND with some gravel (loose, moist) (weathered till horizon) 2.5 - 6.0 SM-GM Gray with minor orange staining silty fine to medium SAND with fine gravel (dense, moist) (glacial till) ` Terminated at 6.0 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Logged by: S.T. Mattos GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 Excavated on: July 3, 2014 Test Pit Logs Proposed Short Plat 1909 SW 356th Street Federal Way, Washington DOCID: Xu.20thAvesw July 2014 j Figure 6a Test Pit TP04 Location: S edge of parcel, centered Approximate Elevation: 412 feet Depth (feet) Soil Type -_Soil Description _ 0.0 - 0.5 Light brown topsoil with fibrous root mat 0.5 - 2.0 SM Brown silty fine to medium SAND with some gravel (loose, moist) (weathered till horizon) 2.0 - 7.5 SM-GM Gray with minor orange staining silty fine to medium SAND with fine gravel (dense, moist) (glacial till) Terminated at 7.5 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Test Pit TP05 Location: SE Corner of parcel Approximate Elevation: 412 feet Depth (feet) Soil Type Soil Description 0.0 0.5 Light brown topsoil with fibrous root mat 0.5 2.0 SM Dark brown to black silty SAND, numerous organics, wood debris (fill) 2.0 6.0 SM-GM Gray with minor orange staining silty fine to medium SAND with fine gravel (dense, moist) (glacial till) Terminated at 7.5 feet below ground surface. No caving observed. No groundwater seepage or mottling observed. Logged by: S.T. Mattos GeoResources, LLC 5007 Pacific Highway East, Suite 16 Fife, Washington 98424 Phone: 253-896-1011 Fax: 253-896-2633 Excavated on: July 3, 2014 Test Pit Logs Proposed Short Plat 1909 SW 356th Street Federal Wav, Washincit DocID: Xu.20thAveSW I July 2014 1 Figure 6b SPECTRA Laboratories 2221 Ross Way ° Tacoma, WA 98421 (253) 272-4850 • Fax (253) 572-9838 • www.spectra-lahcom 07/28/2014 Geo Resources, LLC 5007 Pacific Hwy. E Suite 16 Fife, WA 98424 Analyte Organic Matter Cation Exchange Capacity SPECTRA LABORATORIES Steve Hibbs, Laboratory Manager a6/scj Project: Xu 20th Ave SW Client ID: TP 1 @ 25' Sample Matrix: Solid Date Sampled: 07/03/2014 Date Received: 07/14/2014 Spectra Project: 2014070311 Spectra Number: 1 Result Units Method 3.0 wt. % Dry ASTM D-2974-13 18.7 Na, mEq/ 100g SW846 9081 Page 1 of 4 O 0 w �f m m -P, W m 1 "Q 0 9 0 m n n m A o z o m 3 CL m p n (Dj1 ill - W '� rU W N w o v O CD N �) m Ny 14 en z ?; m�8m ar000� v a �m x O �� 0 CD 3 m o ID v m -0 -RCD R, o Z L` vm SLAW b a 000 � o n m m m' m m z 12 z m� k/1 c m c m a 00 ~ ~ C�' N m m 3 T D r X o CD N mm mm CIO 2L Z m U3 x C p . NUMBER OF CONTAINERS m n N rt n 8 NWTPH-HCID D r BTEX X CL (n W a ' i "� c BTEX/NWTPH-G NWTPH-O n >, 9 I N m y z NWTPH-Dx g cn n 1664 SOT -HEM (TPH) va 0 CD w Z 9 1664 HEM (FOG) N �o F m s CD 8260/624 VOA 8260 CHLOR SOLVENTS z m w o _ 8270-625 SEMI VOA a X1 �[f 1 ?0 8270 PAH/PNA m8082/608 PCB LnA TOTAL METALS RCRA 8 4 m TOTAL METALS (SPECIFY) m D TCLP METALS RCRA 8 a m i cn TCLP METALS (SPECIFY) N 2 w ; 0 PH 9040/9045 Z v' OR �{ z TX/TOX/EOX E o > Z TURBIDITY FLASH POINT y �f BOD SOLIDS (SPECIFY) 4 cp .c # C V/ 0 v N � C m m cU'n Tested By: Timothy Bergstrom Checked By: Brad Bi erstaff m L H O C co Y L O N N O L Y E O L O w Y C N U N L Y v— O O y 7 N N U X (D N L Y O N ca U) _Y A� W L CD ^o W F- Tested By: Timothy Bergstrom - Checked By: Dana Biggerstaff APPENDIX C - CSWPPP I i I I i I BEYLER �J CQNi J:TINQ Xu short Plat BEYLiER Prepared for: Prepared by: Reviewed by: CONTACT phone: 253-380-2958 tax: 253-582-5694 landon@beylerconsulting.com b ey l e rc o n s u l t i n g. co m OFFICE 10314100th St. SW Lakewood, WA 98498 Plan. Design. Manage. CIVIL ENGINEERING I LAND PLANNING I FEASIBn PROJECT MANAGEMENT I PERMIT EXPEDITING XU SHORT PLAT Construction Stor J>water .1-o_.1ution revention Sian MAYFAIR, LLC 64704 53rd Ave SW Federal Way, WA 98023 253-666-4985 November 10, 2015 Joseph A. Parsons Landon C. Beyler, P.E. Beyler Consulting 7602 Bridgeport Way W., Ste 313 Lakewood, WA 98499 253-301-4157 1 TABLE OF CONTENTS I. Erosion and Sediment Control (ESC) Plan..........................................3 Section 1 - Project Overview........................................................ 3 Section 2 - Erosion Control Specialist ............................................ 3 Section 3 - Existing Site Conditions...............................................3 Section 4 - Adjacent Areas........................................................... 3 Section 5 - Critical Areas............................................................. 3 Section6 - Soils......................................................................... Section 7 - Potential Erosion Problems ........................................... 4 Section 8 - Construction Stormwater Pollution Prevention Elements ... 4 Section 9 - Construction Phasing .................................................. 6 Section 10 - Construction Schedule ............................................... 7 Section 11 - Financial/Ownership Responsibilities ............................ 7 Section 12 - Engineering Calculations ............................................ 7 Section 13 - Conclusion............................................................... 7 "EROSION CONTROL RESPONSIBILITY" The Construction Stormwater Pollution Prevention Plan should be kept onsite with a copy of the plans at all time. The objective is to control erosion and prevent sediment and other pollutants from leaving the site during the construction of the project. The owner or assigned contractor shall be responsible for maintaining erosion control Best Management Practices during construction. All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. The owner or contractor shall identify a Certified Erosion and Sediment Control Lead. This person shall be on -site or on -call at all times. The Erosion Control Lead information shall be inserted into this report. The CSWPPP shall be modified, if during inspection or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the CSWPPP is ineffective in elimination or significantly minimizing pollutants in stormwater discharges from the site. The CSWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be completed within seven (7) calendar days following the inspection. Construction site operators are required to be covered by a Construction Stormwater General Permit through the Department of Ecology if they are engaged in clearing, grading, and excavating activities that disturb one or more acres and discharge stormwater to surface waters of the state. Smaller sites may also require coverage if they are part of a larger common plan of development that will ultimately disturb one acre or more. 1 JBEYLER Page 2 of 7 I. Erosion and Sediment Control (ESC) Plan Section 1 - Project Overview The Xu Short Plat proposes to plat a previously developed single family parcel, being located at 1909 356th Street, in the City of Federal Way, King County, Washington. The King County Parcel number is 2521039004. The current zoning of the project site is RS 9.6, Residential Single -Family 9,600 sf, indicating a minimum lot size of 9,600 square feet. This project proposes to short plat 5 lots on the 1.58 acre project site. In addition there a stormwater tract is proposed for detention. A portion of the subject site will be dedicated to the City of Federal Way for the purpose of frontage improvements consistent with a Type "C" street along SW 356th Street. Half street improvements consistent with Type "S" street are being proposed 20th Avenue SW frontage. A shared access drive, having connectivity with 20th Avenue SW is proposed along the southerly property line of the subject site, to allow for access to lots 4 and 5. The shared access drive has been designed in accordance to the City's standard detail for alternative fire department turnaround. Lots 1-3 will access directly from 20th Avenue SW from individual drive connections. Section 2 — Erosion Control Specialist An erosion control specialist is not required for the size and scope of this proposed subdivision. It will be responsible of the owner and/or the contractor to regularly inspect and maintain the proposed erosion control BMPs, and will take additional measures, as necessary, to respond to changing site conditions. Should it become necessary the engineer will be made available in providing recommendations for additional erosion measures to the site. Section 3 — Existing Site Conditions The project is located at 1909 356th Street, in the City of Federal Way, King County, Washington. The King County Parcel number is 2521039004. The current zoning of the project site is RS 9.6, Residential Single -Family 9,600 sf, indicating a minimum lot size of 9,600 square feet. The existing site is developed with a single family residence that is to be removed together with associated infrastructure. Section 4 — Adjacent Areas The project is adjacent to SW 356th St to the North, multiple single family parcels to the east and south, and 20th Avenue SW to the west. The project is keeping consistent with neighboring land use characteristics. Section 5 — Critical Areas There are no vegetative buffers, wetlands, floodplains, ponds, or well protection areas present. The project site is within the area of highly potential area for groundwater contamination. See critical area maps in Appendix A of the TIR for details. J BEYLER Page 3 of 7 Section 6 — Soils A subsurface exploration on the project site was conducted by GeoResources, LLC in June 2014. In summary, the stratigraphy across the site, as observed in the test pits, generally consisted of 1/2 to 1 foot of forest duff and sandy topsoil overlying 1.5 to 2 feet of loose medium dense, silty sand with varying minor amount of gravel. These surficial soils were interpreted to be weathered glacial till. The underlying glacial till encountered in the explorations was observed to be in a dense to very dense condition. According to the GeoResources, these soils may be suitable to support porous pavement with an estimated long term infiltration rate of 0.25 inches per hour. The overlying 24 to 30 inches of weathered soils should provide adequate treatment capacity based on the cation exchange rate and organic content test results. The geotechnical report can be found in Appendix B of the associated TIR report. Section 7 — Potential Erosion Problems Due to existing slopes and ground cover and that site is currently stabilized, a silt fence, construction entrances, inlet protection, and temporary interceptor swales with outlets to two sediment ponds installed during construction is anticipated to provide adequate erosion control protection of adjacent properties. Section 8 — Construction Stormwater Pollution Prevention Elements Element 1: Mark Clearing Limits The clearing limits shall be marked per the approved plans. Prior to beginning land disturbing activities, including clearing and grading, all clearing limits will be clearly marked. Silt fence will be placed on downstream property boundaries as indicated on the project plans. Element 2: Establish Construction Access It is anticipated that two construction entrances will be established on this project site. With the use of this construction entrance vehicle access to and from the site is expected to track only minor amounts of dirt and other sediment onto the street. All sediment that is tracked onto the roadway due to construction activities will be cleaned at the end of each working day. Should sediment tracked onto the street become excessive, operations will cease until the tracked material has been removed by street sweeping and the pads have been refurbished. Element 3: Control Flow Rates Temporary interceptor swales will be installed as necessary to direct runoff during construction to the one of the temporary sediment ponds located along the east boundary of the project site. Element 4: Install Sediment Controls The SWPPP plan for this project specifies the use of various erosion/sediment control measures: construction entrance, siltation fence, inlet protection. These facilities will be inspected weekly at the end of the work week and subsequent to each storm event. Sediment accumulation in excess of design limits will be removed from the facilities upon identification of the condition and prior to a forecasted storm event. The construction superintendent, or owner, will be responsible for these actions and will be responsible for �r Page 4of7 BEYLER ,f G::SOLiISJ maintenance of the erosion and sediment control facilities. Site demolition and/or grading will not occur on the site until after the silt fences have been installed. Element 5: Stabilize Soils The following constraints will apply. From October 1 through April 30, no soils will remain exposed and unworked for more than 2 days. From May 1 to September 30, no soils will remain exposed and unworked for more than 7 days. This condition will apply to all soils on site, whether at final grade or not. The areas outside of the roadway will be stabilized with mulch, grass planting or other approved erosion control treatment during the construction phase. Element 6: Protect 5ilapes There will be no construction or clearing in the location of the steep slopes on the site. Clearing limits are to be established and silt fence provided to protect surrounding parcels from silt laden water. Element 7: Protect Drain Inlets Inlet drain protection will be provided at all proposed grated catch basins and nearby existing catch basins. Element 8: Stabilize Channels and Outlets There are no channels either existing or proposed nor are there any existing or proposed outlets to channels. Element 9: Control Pollutants The control of pollutants is the responsibility of the construction superintendent. Maintenance and repair of heavy equipment and vehicles involving oil changes, hydraulic system drain down, solvent and de -greasing cleaning operations, fuel tank drain down and removal, and other activities that may result in discharge or spillage of pollutants to the ground or into stormwater runoff must be conducted using spill prevention measures, such as drip pans. Contaminated surfaces will be cleaned immediately following any discharge or spill incident. The superintendent will be expected to use his best judgment in addressing any and all conditions that are potentially damaging to the environment. Emergency repairs may be performed on -site using temporary plastic placed beneath and, if raining, over the vehicle. All pollutants, including waste materials and demolition debris that occur on -site during construction will be handled and disposed of in a manner that does not cause contamination of stormwater. Cover, containment, and protection from vandalism will be provided for all chemicals, liquid products, petroleum products, and non -inert wastes present on the site. The contractor will provide a centralized area for the storage, maintenance, and refueling of construction equipment and for washing of concrete truck drums. All runoff from the area shall be intercepted by a trench around the downslope side of the area and detained until it can be removed by a `Vactor' truck and properly disposed of in an approved facility. Element 10: Control De -Watering No requirement for de -watering is anticipated. However, if encountered, de -watering shall be discharged into a closed conveyance system for discharge from the site. Highly turbid or otherwise contaminated dewatering water, such as from construction equipment operation will be handled separately from stormwater. Page 5 of 7 BEYLER -,..,, Element 11: Maintain BMPs All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. All maintenance and repair will be conducted in accordance with standard procedures for the BMPs. Sediment control 'BMPs will be inspected weekly or after a runoff -producing storm event during the dry season and daily during the wet season. All temporary erosion and sediment control BMPs will be removed within 30 days after final site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil areas resulting from removal of BMPs or vegetation will be permanently stabilized with mulch, grass planting or other approved erosion control treatment. Element 12: Mana e the Project Site construction will be performed after the erosion and sediment control measures have been constructed. From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only be permitted if the transport of sediment from the construction site to receiving waters will be prevented through a combination of favorable site and weather conditions, limitations on extent of activity, and proposed erosion and sediment control measures. The Contractor and/or owner should stop the permitted activity if sediment leaves the construction site causing a violation of the surface water quality standard or if erosion and sediment control measures are not adequately maintained. Trenches will be opened only immediately prior to construction and the trenches will be backfilled immediately after any required testing or inspections of the installed improvements. Trenching spoils will be treated as other disturbed earthwork and measures will be taken to cover or otherwise stabilize the material, as required. All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. Section 9 — Construction Phasing The recommended construction sequence will include these steps in this order, but some portions of the steps may be performed out of sequence as conditions require. The Construction Sequence is as follows: 1. Obtain Applicable Washington DOE Applicable General Permits for Construction 2. Stake and flag clearing and construction limits 3. Install Construction Entrance(s) 4. Install silt fabric fence where indicated 5. Install any other erosion control facilities that may be necessary 6. Clear and grade site 7. Remove erosion control facilities only after site is stabilized 8. Request Final site development inspection B. BEYLER Contractor to make connections to existing facilities only after proposed storm and sewer systems have been inspected and accepted of by Pierce County. All storm drainage facilities shall be protected in place from construction activity via brightly flagged stakes or, if necessary, temporary construction fencing. Section 10 — Construction Schedule The project is intended to begin construction in 2014. Special consideration is required for source control during the wet season period, which may include phased construction, materials available for immediate stabilization of denuded areas and diligent review of site for noted erosion concerns. Section 11 — Financial/Ownership Responsibilities The property owner will be responsible for bonds and other required securities for this project. Section 12 — Engineering Calculations No calculations have been prepared for this report. Section 13 — Conclusion Erosion control procedures as described in this report and illustrated on the design plans, if properly implemented, should mitigate anticipated erosion effects from the development of this project. The success of erosion control measures is usually related to the Contractor's attention to maintenance of such measures. However, in some instances, even with proper attention being paid to erosion control, measures such as those shown on the plans are unable to prevent the discharge of turbid water to the city storm system. In this event, secondary measures may be required. These additional BMPs are provided in Volume II of the Surface Water Management Manual. _1 3� f BEYLER CON' SOLCISG Page 7 of 7 INTERCEPT EX' 4" CONDUIT AND #2 Ci ROUTE TO NEW J—BOX 53 UG SEC v&JUL i •a S- 2 fr l be ���ir �l1 �►� Lpv.Y�wt40'r rD IJC "O`BE REMOYED I(#2 CU—C� in 4" C.C. TOBEREMOVED 11 18265 5346PC UG FEEDS OH I EXISTING 2I NEW� FEEDS OH I ss- EXISTING RE —LABEL DRAWING REFERENCE ON U906PO1 _POLE RISER TO BE U1925P01 65T 5447PC 24020 SW 356TH ST. EXISTING 42 CU— n 4" Car4` . STORM PON�ar P'°�• In 4" C.C., . °�—NEW.!_ - .153681 JC _.. '%� 444 �20°x4o' ADDITIONAL— . . UTILITY EASEMENT 4d 5T c6 + CU—C ' in 2.5" C.0----------------- o 110' EASEMENTHYI j I + 10' UTILITY j EASEMENT I 1g { I I o 10'x10' ADDITIONAL I UTILITY EASEMENT iv--------------------------j ce II NEW --- _---------__—-----------1 �y 53682TC 25 KVA I i I s j NEW I .,—#2 CU—C I n cis n n } u 4' 4" GROUTEDZ•`� ; • MST^RT�}'���..-. SECTION A —A 53681 JC & 53684J 444 JUNCTION B( SCALE: 1 " = 2' 444. VAULT INSTALLED PER PC DIV. STD. C—UG-1500 INTERCEPT EXISTIN.11�' 4" CONDUIT AND #2 CU AND ROUTE TO NEW J—BOX 53681 JC A�Iro I�cu UG SEC f.- v =CA C, w� TO BE REMOVED �,2 CU—C-s in 4" C.C. TO BE REMOVED �j 18265 5346PC UG FEEDS OH EXISTING 27 I NEW FEEDS OH EXISTING RE -LABEL DRAWING REFERENCE ON U906POl'POLE RISER TO BE U1925P01 65T 5447PC 24020SW 356TH ST. EXISTING _ - #2 CU—C _ NEW in 4" C.C. s' 2 CU —C �� STORM POND n 4 C.C. v- -- N 53681 JC ��p -� ' 444 1. , 20 x4O ADDITIONAL-- - I• EASET ca - =—NEW --#2 CU- C 0 I In 2.5 C.C.---_-___ I� r 3 j 1 10' EASEMENT r Fi"a I r I I I ; 10' UTILITY I f; 1 EASEMENT I [ 10'x10' ADDITIONAL j r ; I UTILITY EASEMENT I r I -_--- --J Ca 11 r_____---- ______________� 1 NEW I I 53682TC I 25 KVA j NEW E I 1, #2 CU—C x ;------- - � x x s x r rx x x s 1 ` 3,1tx r x I 4' I I I r 1 x I xx , A I x x x r a x x x x r 4' SECTION A -A 53681 JC & 5368* 444 JUNCTION E SCALE: 1 " = 2' 444 VAULT INSTALLED PER F DIV. STD. C—UG-1500