Loading...
23-102345Mechanical City of Federal Way Community Development Dept. FILE 1 33325 8th Ave 5 Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: THOMAS Project Address: 31705 25TH AVE SW Project Description: gas furnace replacement with ac add on Permit #:23-102345-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 193840 0280 Owner Applicant Contractor CHRISTOPHER ALAN THOMAS TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 31705 25TH AVE SW COOLING PACIFAS093KA (9/8/23) FEDERAL WAY WA 98023 8607 DURANGO ST SW SUITE A 12811 PACIFIC HWY SW TACOMA WA 98499 LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? ................................. 13294 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Air Conditioners - Stand Alonf 1 Furnaces PERMIT EXPIRES Monday, 30 October, 2023 Permit Issued on Wednesday, May 3, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of as ing on and the City of Federal Way. Owner or agent: Date: Ow �vn� CITY of -' Federal Way THIS CARD IS TO REAL-kI\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) S35-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT L07E TIRS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. 'Fork nmst not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL ❑ UFER Ground (4295) ❑ Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) El Feeders/Sub-panels (404-5) Approved Approved Approved By Date By Date By Date E] Final - Electrical (4055) Approved By Date MECHANICAL ❑ Mechanical Rough -in (4165) 0 Gas Piping (4125) 0 Final - -Mechanical (4065) Approved Approved to release test Approved Br Date By Date By �� Date PLUMBING l Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cm-er Approved Approved By Date By Date BY Date