Loading...
23-102081Mechanical City of Way Permit #:23-102081-00-ME Community DDevelopment Dept, L LLPP 33325 8th Ave S � 7'wv Federal Way, WA 98003 Inspection Request Line. (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MOORE Project Address: 29906 8TH PL S Parcel Number: 515160 0045 Project Description: Replace gas furnace like in kind Owner Applicant Contractor THANGVANDY MOORE TAYLER MANNINGPACIFIC HEATING & PACIFIC AIR SYSTEMS (GENERAL) 29906 8TH PL S COOLING PACIFAS093KA (9/8/23) FEDERAL WAY WA 8607 DURANGO ST SW SUITE A 12811 PACIFIC HWY SW 98003-3755 TACOMA WA 98499 LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation? .................................. 6295 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Monday, 16 October, 2023 Permit Issued on Wednesday, April 19, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Wasl,in t n an ederal Way. REPRINTED / Owner or agent: Date: r �I CITY O. Federal Way THIS CARD IS TO RE -IL -UN ON -SITE Construction Inspection Record I`SPECTION REQL-ESTS: (253) 335-3050 Scheduled inspections rna-; be failed if this card is not on -site. DO NOT LOSE TBLS C-kRD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with'y otu inspector if you are unsure about and. of the inspections or the inspection sequence. On -going inspections are logged on the back of this card_ ELECTRICAL 13V LIFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date Q By Slab/Concrete Floor (4255) Approved to place concrete Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) 0 Service (4235) Approved Approved Approved Bv- Date Bv- Date By Date Q Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved Bv- Date A MECHANICAL Mechanical Rough -in (4165) 0 Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date Byzez Date���7� PLUMBING ❑ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date BY Date