Loading...
23-102564City of Federal Way Community Development DepL 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: PAVILION APARTMENT HOMES; BLDG 07 Project Address: 1900 SW CAMPUS DR Plumbing Permit #:23-102564-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 132103 9103 Project Description: Replace existing polybutylene piping with PEX in (12) units. start point is at the main at WHT; end point is at, but does not include each fixture Owner Applicant Contractor PRIME CATALINA CAMPUS DRIVE 1 LLC LEWIS ROSSSagewater SAGEWATER (PLUMBING) 50 CALIFORNIA ST SUITE 2525 1319 N POWHATAN ST SAGEWL*777JK (8/31/23) SAN FRANCISCO CA 94111 ALEXANDRIA VA 22314 1319 POWHATAN ST ALEXANDRIA VA 22314 Plumbing Fixtures W. Dishwashers 12 Laundry Washer Outlets 12 Lavatories 24 Showers 24 Sinks 12 Urinals 24 Water Heaters 12 PERMIT EXPIRES Sunday, 12 November, 2023 Permit Issued on Tuesday, May 16, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of V1f�s ngton an Owner or agent �fl%ederal Way- .: � :� ��_Date: CITY of Federal Way THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-30-50 Scheduled inspections im-; be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate. 'Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this cud. ELECTRICAL 0 LFER Ground (429-5) ❑ Ditch cover (4030) Q Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) ❑ Temporary Poser (4275) ❑ Service (4235) Approved Approved Approved B} Date B` Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑l Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL 0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical. (4065) Approved Approved to release test Approved B} Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) 12 I Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approtvd � Approved ~ By Date By ��1 Date � By �� Date