23-102564City of Federal Way
Community Development DepL
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
FILE
Project Name: PAVILION APARTMENT HOMES; BLDG 07
Project Address: 1900 SW CAMPUS DR
Plumbing
Permit #:23-102564-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 132103 9103
Project Description: Replace existing polybutylene piping with PEX in (12) units. start point is at the main at WHT;
end point is at, but does not include each fixture
Owner
Applicant
Contractor
PRIME CATALINA CAMPUS DRIVE 1 LLC
LEWIS ROSSSagewater
SAGEWATER (PLUMBING)
50 CALIFORNIA ST SUITE 2525
1319 N POWHATAN ST
SAGEWL*777JK (8/31/23)
SAN FRANCISCO CA 94111
ALEXANDRIA VA 22314
1319 POWHATAN ST
ALEXANDRIA VA 22314
Plumbing Fixtures W.
Dishwashers 12 Laundry Washer Outlets 12 Lavatories 24
Showers 24 Sinks 12 Urinals 24
Water Heaters 12
PERMIT EXPIRES Sunday, 12 November, 2023
Permit Issued on Tuesday, May 16, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
V1f�s ngton an
Owner or agent �fl%ederal Way-
.: � :� ��_Date:
CITY of
Federal Way
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-30-50
Scheduled inspections im-; be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate. 'Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this cud.
ELECTRICAL
0
LFER Ground (429-5)
❑
Ditch cover (4030)
Q
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
❑
Temporary Poser (4275)
❑
Service (4235)
Approved
Approved
Approved
B}
Date
B`
Date
By
Date
❑ Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑l
Ceiling Corer (4020)
Approved
Approved
Approved
By Date
By
Date
By
Date
❑ Final - Electrical (4055)
Approved
By Date
MECHANICAL
0 Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical. (4065)
Approved Approved to release test Approved
B} Date By Date By Date
PLUMBING
❑ Plumbing Groundwork (4190)
12 I Rough Plumbing (4230)
0 Final - Plumbing (4075)
Approved to cover
Approtvd
�
Approved
~
By Date
By ��1 Date �
By �� Date