20-104700-SF-SITE Plany",
LOT GENERAL NOTES:
1. Mass excavation was approved with the subdivision approval so all trees were removed.
Make up tree requirement is met with common area new trees. See project landscape plan.
2. See attached subdivision civil engineering SHT.C2.3 for existing and new topo, see Lot #15.
3. NEW LOT # 15 DATA:
North T
Lot Size - 2,295 SF
Impervious area structures - 1057 SF
Impervious area concrete - 82 SF
Total impervious area - 1139 SF (50% COVERAGE)
MIRROR LAKE SUBDIVISION LOT #15
scale: 1 5' 1 M I
0 51 10, 20' RECEIVED351
0
2
E
0
0
>
(D
<
K
(L
X
WC)
Z
K
fl)
IL N
all,
W UJ
TH1@qRmwftwsunW=FKXV=
AM THE PROMNOFTM NMN MUM% MRo
AREMMMAGWOF810WIMUNUnNOMMUNEOR
REPROOMMMIMMMEWIMPEMMMOFTHE
NOUSSInMONIPMONEDWOMMOMMAND
~M oWyFOR u1E*1CoWWMVM7M
P=ECTAN0=Mff1E01fffMM1001NffiPAfflW
WffWWTHEVVNrMPMMM0F1MWNN==
COPYRIGHT 2013
the NO(US studio
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT