Loading...
19-105839 (2)lu AL CITY OF i'm F6deral Vft Centered on Opportunity 3831 Silver Beach Avenue Bellingham, WA 98226 0", CITY HALL 33325 8th.,A enu e South Federal Way, WA 98003-6325 (253) 835-7000 www.cityoffederalway.com Thank you for submitting a preapplication to the City of Federal Way's Development Review Committee PRC), ret6ived by the Department on December to, �019. Wo�hope that the infbrmation discussed at that meeting was helpful in understanding the gdd&A! rdq*6rfiehts for YOW Project as: slubtriftted. This letter summarizes comments provided by the members of the DRC. You have requested to forego the in - person meeting with members of the DRC. The mem�ers who reviewed your project -and provided dorruhtnts ded st-,,-•wmfdte cil,'s Planning and Building sious, P46ilc v6rl�s De artmenr� and "resemAti� gPeoes not repreSeIlL aXapJWALk-Uz,1C uwacn. FWRC and other relevant codes for all additional requirements that may apply to your project. CT"es ti e a �wpo�� -1-ase contact the a guLa,, riate DA enta v s listed I below� Otherwise, any geqeo que�kions about the preapplication and pebe referred to the planner on duty at 253-835-2655, or Wanp�citmffk000��40M- PROJECT DESCRIPTION Proposed remodel of an existing building (7,461 square feet) and change of use from an auto parts store to automotive collision repair center. The proposal is to include a 313 square foot addition and automotive spray booth located at the rear, located at 33120 Pacific Flighway South, Federal Way, WA, King County tax parcel number 797820-0005. MAJOR ISSUES Outlined Wow is A� sumnaary qf the major issues of yqurprqj�ect based on the pla:6s and information • These issues can to modhkatibhs and revisions in the plal The major issues section is only provided as a means to highlight critical requirements or issues. Please be sure to read the comments made by all departments in the following section of this letter. 30G��r • • A Process III application and SEPA Checklist are required pursuant to FVVRC 19.15.030(3), "Review processes for improvements and additions to developed sites." • The Puget Sound Clean Air Agency is the Lead SEPA agency. A Process III land use review still applies as SEPA is triggered; although, processed by another agency. • As proposed, the increase in gross floor area triggers parking compliance. As proposed, the site does not provide enough parking (restriping to delineate spaces may be required). • Screen existing utility boxes visible from Pacific Highway South per Community Design Guidelines FWRC 19.115.050(6)(b)(ii). • Transportation Concurreng Management (FWRC 19.90) — A transportation cone envy permit, submitted with the application (1 - 10 trips), is required for the proposed project. • Trafic Impact Fees (FC 19.91) — A traffic impact fees payment wiU be assessed and paid prior to the building pern-Lit issuance. • Access Mana gement (FWIRC 19.135.260) — If there are changes to the access proposed, the development shall meet access management standards. Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. COMMUNITY DEVELOPMENT — PLANNING DIVISION Leila WiRoughby- Oakes, 253-835-2644, Lei1a.:VViJJougYhbv�0akes et off�derAlnMyxom� Zonin g Desi gnation and Use — The subject property is zoned Commercial Business (BC). The proposed use is an automotive collision repair center and it is currently an automotive parts and repair shop. The proposed use is permitted under the category "Retail establishment providing vehicle, boat, or tire sales, service, repair and/or painting, passenger vehicle rental including moving tracks," use in the BC zone as listed within and subject to the regulations in Use Zone Chart FWRC 19.220.030. 2. Nonconfomin ,g Development — The proposal does not exceed 25 percent of the existing gross floor area of the existing development, or 2,500 square feet of new gross floor area per FVVRC 19.30.090. Therefore, nonconforming aspects of the development are not required to be brought into conformance. However, please see Item #8 regarding performance and ongoing maintenance of landscaped areas. 3. State Environmental Polig Act (SEPA) Environmental Review —The proposed use of a spray booth is not categorically exempt from SEPA, on account of the requirement for a license governing emissions to air that is not exempt per WAC 197-11-800(l) 19-105839-00-PC D- ID: 79984 Mr. Kerry Garrett Page 3 of 8 January 9, 2020 8. Required Parking — The proposal shall provide a minimum of 26 parking spaces (7774 total gross floor area [new and existing],./ 300 = 25.9 spaces). a. Parking StuJv: The site appears to be constrained with few customer parking spaces accessible to the public. Except as provided in FWaC 19.130(3)(d)l the number of parking spaces required by the use zone chart is the minimum number of parking spaces required for that use. b. Compact Spaces: The site is eligible for 25 percent compact spaces (i.e. seven spaces). Please find the enclosed parking lot design criteria for compact space dimensions. 9. Landscapin g — Landscape requirements are contained in FWRC Chapter 19.125 "Outdoors, Yards, and Landscaping." Following are the key landscape requirements for the project (rnAimerulnce and performance): a. It appears the front landscape buffer is non -conforming; however, no front landscaping is required unless parking spaces are reconfigured (i.e. landscape islands required). b. Other landscaped areas on site, if existing, shall comply with the maintenance and performance standards of FWRC 19.125.090. 10. OutdoorActivifies and Storag e — Pursuant to F&RC 19,125.170(3), as part of the Process III application, the city will administratively review and either approve or deny any application for outdoor use, activity, or storage based on the following standards: I The applicant may provide a parking study in accordance with FVArRC 19.130.080(2), prepared by a qualified professional to reduce required spaces. D­ ID: 79984 19-105839-00-PC Page 5 o 8 January 9, 2020 i. Building de modulation and screening options, (a), (b), (c), and (d). All building facades that ar; both longer than 60 feet and visible from either a right-of-way or residential use or zone shall incorporate facade treatment according to this section. Subject facades shall incorporate at least two'of the four options on each fagade. Options intended to break up the mass of large buildings include: (a) fagade modulation; (b) landscape screening; canopy, or arcade; and (d) pedestrian plaza. ii. Building facades visible from rights -of -way should incorporate methods of articulation and accessory elements in the overall architectural design, for example display windows, window openings with visible trim material, vertical trellis, artwork, decorative masonry, metal patterns of grillwork, relief, material variations, etc. '177777167'—'? T L the roofline must be surrounded by a solid sight -obscuring screen that is integrated into the architecture of the building and obscures the view of the appurtenances from adjacent streets and properties. Please provide screening details on thelelevation drawings. 13. Garba ,ge and Regcfin ,g — The building must include provisions for trash and recycling facilities as described ir, FWRC 19.125.040(4) and F"%aC 19.125.150. The exterior trash enclosure area may not be located within landscape buffer areas, must be screened according to the landscape chapter, and must be architecturally consistent with the design of the primary structure on site. 14. A pplication Fees & Submittal — Please contact the Permit Center at I 253-835-2607, for updated fee schedules for applications and permits. Permit fees are updated annually Project submittals are conducted in person at the Permit Center located on the -2.d floor of City Hall. PUBLIC WoR-Ks — DEVELOPMENT SERVICEs DIVISION Ann Dower, 253-835-2732, a".dowei5ederalway.com Land Use Issues — to water Since the project proposes only a 313 square foot addition, no new impervious area, and less than 50 percent of the value of existing improvements, the project as proposed does not require review for surface water runoff control or water quality treatment. Transportation Concurrency Analysis (FWRC 19.90) 1. Based on the submitted materials to construct a 313 square foot addition, and the Institute of Transportation Engineers (ITE) Tiip Generation - 10th Edition, the proposed project is expected to generate approximately one new PM peak hour trip. 19-105839-00-PC Dos ID: 79984 Page 6 of 8 January 9, 2020 2. A concurrency permit is required for this development project. The PW Traffic Division will perform a concurrency analysis to determine if adequate roadway capacity exists during the weekday PM peak period to accommodate the proposed development. Please note that supplemental transportation analysis and concurrency mitigation may be required if the proposed project creates an impact not anticipated in the six -year Transportation Improvement Plan (TIP). 3. The estimated fee for the concurrency permit application fee is an estimate and based on the materials submitted for the preapplication meeting. The concurrency application fee must be paid in full at the time the concurrency permit application is submitted with the land use application. The fee may change based on any changes in the estimated weekday PM peak hour trips as identified in the concurrency application. The applicant has the option of having an independent traffic engineer prepare the concurrency analysis consistent with city procedures; however, the application fee remains the same. MIQUEEM. 1 1. Will be based on the submitted materials to construct a 313 square foot addition. The actual impact fee will be calculated at the time a completed building permit application is filed and must be paid prior to permit issuance. For additional information please contact the Permit Center at or the key traffic contacts above. PUBLIC "IfORKS - SOLID WASTE AND RECYCLING DIVISION Rdb Van Orsow, 253-835-2770, Robert.VanOrsow@cityoffederalway.com Adequate space allocation must be provided for interior and exterior garbage, recycling, food waste, waste oil, yard debris, hazardous waste, or biohazard collection containers. Nfinitnurn recycling space allocation is established by FWRC 19.125.150. # For basic solid waste and recycling needs within a single enclosure, clear interior dimensions measuring 10 feet deep by 20 feet across are recommended, along with a two -door swing -open or roll -open gate that spans the front width of the enclosure. When gate doors are opened, no structure or hardware should remain above grade across the enclosure opening. Gate pins/holes are preferred for holding gat - in closed and open positions to ease service access and maximize the life of gate hardware. I Sites may require a larger enclosure, or multiple enclosures, to accommodate on -site user access and/or additional waste types and containers. Plan for user access to interior waste and recycling storage areas/cont ° ers, and to exterior containers screened by enclosure(s). Plan for unobstructed, safe enclosure ingress and egress for service vehicles, directly in line with enclosure openings. Allow appropriate turning radii for service vehicles and minimize potential "blind spots" during ingress and egress. Lei I I I a M M ky R F I WAGME14 E, 19-105839-00-PC Doc ID: 79984 I Page 7 of 8 January 9, 2020 COMMUNITY DEVELOPMENT — BUILDING DmsiON Greg Kirk, --A Review will occur with construction permits. Applicant is to complete the land use review process/SEPA prior to permit submittal. SOUTH KING FIRE AND R.EsCUE Sean Nichols, Fire Pla s Examiner, 253-946-7242, Sean.Nichols@southldn fire.org .......... 0021= Fire Flow. The required fire flow for this project is 2500 gallons per minute. A Cedocats of WaterAvailability, including a b ydra.,ifiefireflow model, shall be requested from the water district and provided at the time of the building permit application. I canst-wictiot- Emergency Access Fire apparatus access roads shall comply withall requkements of Fire Access Policy 10.006: ire for eme�gen access. This mg,-,i be done during vlans c3X -UIL, check or prior to building final. Requirements and marking options can be found in FVv7RC Title 8: der Spray Booth The installation of the spray booth will require a separate fire department permit for the suppression system. CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for a formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the city's review of the formal application. The completion of the preapplication process in the content of d:ds letter does not vest any future project application. Comments in this letter are only valid for one year as per FWRC 19.40.070(4). As you know, this is a preliminary review only and does not take the place of the fall review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials subn-.Litted. 19-105839-00-PC Doc ID: 79984 ivir. rcriy ,yaIRMC Page 8 of 8 January 9, 2020 Modifications and revisions to the project as presented for this preapplication may influence and modify information regarding development requirements outlined above. In addition to this preapplication letter, codes that are not addressed in this letter are still required for your project. MR PIT noted above. Any general questions can be directed towards Planning Manager Robert "Doc" Hansen at 253- 835-2643, or Rbl&t.HAhsg�ftocit.vofi��d&gltvmc�2n-i, or the Planner on Duty at 253-835-2655, or annuloOckv6ftederidwatcom. The city looks forward to working -with you. Sincerely, L VaWiUougghby-Oakes Associate Planner 0a4-J�11 enc: Process III Submittal Cqdst Master Land Use Application Concurrency Application Mailing Labels Bulletin Sign Installation Certificate Parking Lot Design Criteria Public Works Spill Prevention Plan c: Ann Dower, Senior Engineering Plans Reviewer Sarady Long, Senior Transportation Planning Engineer Sean Nichols, South King Fire & Rescue Brian Asbury, Lakehaven Water and Sewer District Kathy Mathena, Lakehaven Water and Sewer District John Reickstein, ECON Equipment Solutions, 3207 Cedarside Court, Bellingham, WA, 98226,i!2 �nAlu �x�gn Chris Martin, Honest Performance, ------- ------ 19-105839-00-PC Doc ID: 79984 w= J01' AOP-* AL Mff in RECEIVED Iku L.L.C. ncr i r Kerry (3arreft, Architect ic q(14n aw OF FEDEPAL WM 3831 Silver Beach Ave. Bellingham, WA 98226 D. 11 December, 2019 Re: Carstar Federal Way Collision Project Narratil 33210 Pacific Highway South Federal Way, WA 98003 To: Whom it may concern, City of Federal Way, WA U1, 0 , ff', I This proposed project includes the remodel of the existing automotive parts and repair shop ("Honest Performance") into an automotive collision repair center ("Bob Bjorneby's Carstar Federa' Way Collision"). The existing building of 7,461 s.f. will have 313 s.f. added onto the back of the structure. Little/no site or landscaping work is proposed. The proposed remodel includes the addition of an automotive spray booth. Stacey Welsh From: Stacey Welsh Sent: Thursday, January 16, 2020 12:02 PM To: 'kerry garrett' Subject: FW: Carstar Federal Way Collision (19-105839-00-PC) Attachments: 19-105839-00-PC.pdf; K10 S 330 St & Pac Hwy S - FF 66.pdf Hi Kerry, I understand you have been sent your Pre -Application Meeting Summary Letter. It appears that Lakehaven Water & Sewer District's comments were delayed. I just received them and am forwarded them to you now. Any questions regarding their comments should be directed to Mr. Asbury. Stacey Welsh, AICP Senior Planner Nt 00 33325 8t" Avenue South Federal Way, WA 98003-6325 Phone: 253/835-2634 www.cityoff daraIway.com From: Brian Asbury <BAsbury@lakehaven.org> Sent: Thursday, January 16, 2020 11:47 AM To: Stacey Welsh <Stacey.Welsh@cityoffederalway.com>; Becky Chapin <Becky.Chapin@cityoffederalway.com> Subject: Carstar Federal Way Collision (19-105839-00-PC) Lakehaven's comments below, regarding the proposed conversion of an auto parts store to an automotive collision repair center on tax parcel 7978200005. Let me know if there's any questions or if additional information is needed. WATER • A Water Certificate of Availability issued separately by Lakehaven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, allow 1- 2 work days to issue for typical processing. 2020 cost for a Water Certificate of Availability is $80.00. • Hydraulic model results (FF #66, copy attached) indicate that Lakehaven's standard maximum allowable system liquid velocity of 10 ft/s, at no less than 20 psi, is exceeded at a fire flow rate above 2,400 GPM (for two (2) hours or more). This flow figure depicts the calculated performance of the existing water distribution system under high demand conditions. Fire flow rates greater than available in the existing distribution system may be accommodated through water distribution system improvements. Onsite hydraulic system calculations may need to be determined during design of the onsite water distribution system improvements. Please contact Lakehaven for further detail. w The site has one. (1) existing water service connection (Svc 10, /"x3/4" meter). The existing meter needs to be evaluated under UPC & Lakehaven standards; to determine if it's adequate for the proposed use. • A water service connection application submitted separately to Lakehaven is required for each new service connection to the water distribution system, or any modification to an existing water service connection (e.g., larger meter/service, irrigation, abandonment of existing service(s), re -activation, etc.), in accordance with standards defined in Lakehaven's current Fees and Charges Resolution'. Non-single- family properties require separate domestic (per building, typically,� some exceptions oUovved), irrigation (if irrigated landscaped areas are incorporated into the site deve|opnnend, and fire protection (if required orinstalled) water service connections &meters. To satisfy premise isolation requirements, the installation @'satisfactory testing of an approved beckMovv prevention assembly (BPA) adjacent to each service meter is required pursuant to VVAC 246-290-490 & Lakehavan standards regarding premise isolation. Because the potential cross -connection hazard(s) cannot be determined at this time, Lakehaven cannot specify the nnininourn required BPA device. Contact Lakehaven'sCross-Connection Control Program Manager (Chris ZoepM, 253- 946-5437) for additional information on premise iso|ation/BPA installation &testing coordination. SEWER • ASewer Certificate nfAvailability issued separately by Lakehoven may be required to be submitted with any land use and/or building permit applications (check with land use agency for requirement). Certificate is valid for one (1) year from date of issuance. If Certificate is needed, a||nvv 1- 3 work days to issue for typical processing. 2020 coot for a Sewer Certificate of Availability is $80.00. • Aseparate Lakehaven Sewer Service Connection Permit is required for each new connection to the sanitary sewer system or any modification (disconnect, re -align, abandon, etc.) to an existing sewer service connection, in accordance with standards defined in Lakehaven's current 'Fees and Charges Resolution'. Minimum pipe slope for gravity sewer service connections is 296. In addition to all other sewer service installation standards, installation of Type 1, 48" monitoring manhole is typically required on the private building sewer line, for all new or modified non-residential connections. Also, if applicable, see attached LakehavenTnash/Recyc|ing Enclosure Standards. GENERAL • All Lakehaven Development Engineering related application forms, and associated standards information, can be accessed atLakehaven's Development Engineering web pages • All comments herein are valid for one (1) year and are based on the proposal(s) submitted and Lakehaven's current regulations and policies. Any change to either the development pnnposa|(s) or Lakehaven's regulations and policies may affect the above comments accordingly. Brian Asbury Lakehaven � The contents of this email may be determined to be a public record and subject to disclosure pursuant to RCW 42.56 regardless of any expectations or claims of confidentiality or privilege asserted. W ON, Hydraulic Model Fire Flow Estimate Request/Reporting Form Requested By: Date, Kathy Brown 05/05/98 Hydrant Location: S 33 oth St & Pacific Hwy S 1/4 Section:; K-10 Intersection: S 33 Oth St & Pacific Hwy S Add. Description: Additional hydrant approx 330' south of I intersection 05/07/98 9 TPressure (psi) 53 5LUDSFF.INP FF#66.2 W NOTE: Run 66.1 The fire flow analysis was performed at the hydrant approximately 80' south of the S 33 oth St and Pacific Hwy S intersection. This fire flow rate will cause velocities in excess of 10 f/s within the water distribution system. A fire flow rate less than 2000 gpm will maintain flow velocities below 10 f/s. Run 66.2 The fire flow analysis was performed at the hydrant approximately 370' south of the S 330�h St and Pacific Hwy S intersection. This fire flow rate will cause velocities in excess of 10 f/s within the water distribution system. A fire flow rate less than 2400 gpm will maintain flow velocities below 10 f/s. There is no guarantee that the Hydraulic Model results will represent actual system performance. Model results depict the theoretical performance of the system under high demand conditions. Field measurements should always be obtained for design purposes. K-9 Lakehaven WATER & SEWER MSTRICt From: John Reichsteingohn@econequip.cunn^ Sent: Friday, December 2O,J0l92:58PM To: Lei|aVViUuughbv'Oakes; 'kerrygarrett'; Ping Inquiry Subject: RE: 3321 Pac Hwy So CARSTAR Leila, Can you give us any idea how long a Process III permit process might take? Than ]ohnReichstein ECONEquipment Solutions 360-224-8846 This e-mail is intended only for the use of the individual or entity to which it is addressed and may contain information which Is privileged, confidential, and exempt from disclosure under applicabte law. If you are not the intended redpient, or an employee or agent of the intended recVient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited From: Leila Willoughby -Oakes <Lei|a.WiUoughby'Oakes@derakway.cnm> Sent: Friday, December 2(\ZOl9l:S6PK4 To: John Reichstein^john@econequip.conn>;'kerrygarnett'<herrygarrett@hotmaiicnno»;Ping inquiry <P|ng|nquiry@cityoffedena|xvay.conn» Subject: RE: 3321PacHwy GoCAR5TAR EM Noesecond SEPAreview will not be required the Clean Air isthe Lead Agency, however a Process III hstill required on account of SEPA pursuant to FWRC 19.15.030 'Review Processes for Improvements and Additions to Developed Sites.' Kind regards, bei|aVV-Oakea From: John Raichstein Sent: Friday, Dacember2D, 2019 1:54 PM To: Leila Willoughby -Oakes; 'kerrygarrett'> Ping Inquiry _ Subject: RE: 3321 Pac Hwy So CARSTAR Leila, We completed a SEPA review when we filed for the Puget Sound Clean Air Agency. They reviewed all our drawings and documents Are wegoing tnhave to John Reichstein ECQN Equipment Solutions 360-224-8846 exempt from disclosure under applicable law. If you are not the intended recipient, or an employee or agent of the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited From: Leila Willoughby -Oakes Sent: Friday, December Z0,2O1y1:81PM To: 'kerrygarret ' Ping Inquiry ;]ohn Reichstein Subject: RE: 3321 Pac Hwy So CARSTAR Greetings Mr. Garrett; Kind regards, Leila L.YNUoughby'Oahoa Associate Planner 41— V��eraj Way 333258mAvenue South Federal Way, WA 98003-6325 Phone: 253/835-2644 Fax: 253/835-2609 From: ke Sent: Friday, uecember2U, 2019 I2:27 PM To: Ping inquiry; Leila VViUoughbv-Oakas;John Reichetein Thanks Leila, Our great concern isthat (my understanding) this project gotbunnpedintoProcessU|territoryon|ybecauseh has a Automotive Spray Booth, which trips SEPA. Otherwise this really should be a sinnpleT| with a small (very snna||) addition. is there any way to bear this in mind when it comes to adding/upgrading items outside ofour immediate scope ofwork? Sent: Friday, December 2O,2O1911:28AM Subject: RE: 3321 Pac Hwy So CARSTAR A quick correction to your email a full pre-app letter will be mailed and ernailed with enclosures and submittal checklist tmthe contact information provided unthe form by end ofJanuary. Your application was routed tostaff reviewers today. L. Willoughby -Oakes Associate Planner FederalWay 333258mAvenue South Federal Way, WA98O0S-6G25 Phone: 253/835-2644 Fax: 253/835-2609 - -- Sent: Friday, December 20, 2019 11:06 AM To: Leila Willoughby -Oakes Subject: Re: 3321 Pac Hwy So CARSTAR John, Well, they got it at least. Doesn't look like they'll even peek at it until late January. From: Leila Willoughb,v-Oakes<lLegiilLa.Wi�lloi hib�-Oa�-s'Acitvoffederalway.com> Sent: Friday, December J0,Z0199:34AM _ Tm:'kerry8arret@hntmaiicom' Cc; P|ng Inquiry Subject: RE: 3321 Pac Hwy So CARSTAR Greetings Mr. Garrett, I have been forwarded your inquiry from my colleagues as I was assigned your pre -application today. A|etterwill be sent to you shortly scheduling your pre -application meeting as it appears in the email with our director wish to forgo the meeting with staff. You will received a letter in 4-5 weeks (on account of the holidays and anticipated vacations | presume the last week of]anuary). One item I would mention- moving forward in my experience with other development applications— full street improvements, if triggered by code have been required as a result of new development per decisions of the PW Director. ROW waivers have not typically been granted, Your proposal may or may not trigger this. Kind regards, Leila 333258mAvenue South Federal Way, VVA98OV3-G3J5 rhonc:z53/83S-J644 Fax: 253/835-2609 From: Brian Davis Sent: Monday, October Z1,2O194:36PM To: 'kerry8arrett' ; John Reichstein Cc: Permit Center <PermitCenteL@city ffederalwa com>; Stacey Welsh Subject: RE: Pre-App Meeting Waiver Request You donot need toattend apre-appmeeting, but your Use Process III -still needs twgmthrough epre-app.VVewill forgo the meeting and generate a letter in response to the materials you submit for the pre-app. Please contact our Permit Center, copied on this message, to obtain the forms and fee information. Remind them no meeting needs to be scheduled. 33325 81h Ave So., Federal Way, WA 98003 From: Stacey Welsh Sent�Wednesday, December ll,2Ol9l2:S5PM To: 'kerry8arrett' Cc/ Permit Center Subject: RE: 3321 Pac Hwy So CARSTAR Hi Kerry, The Pre -Application process must occur before you submit for your formal applications. One of the submittal items for the UP III is a copy of the Pre -Application Meeting Summary Letter. I understand there will not be a Pre -Application ^nneetino",butstaffwi||stiUberevievvingthePre-App|icationmateria|sandgoin8thnou8hourrevievxprocess,the outcome of wh ich is a Pre -Application summary letter produced by the city. This letter will contain information that will be helpful to you in completing your materials for formal submittal. The typical process for a Pre -Application is once the -6mplete materials are submitted, tnen there is the meeting with the applicant 3 weeks iater, wan ine wriiien summary letter following 2 weeks later. Not having the actual meeting should shorten that timeline. genior Planner 3332S»mAvenue South Federal Way, VVA9g0Q3-6335 Phone:2SS/835'2634 From: kerry8armett Sent: Wednesday, December 11,301911:S5AM � To: Stacey Welsh Subject: Re: 3321PacHwy 3oCARSTAR Stacey, FYI the Pre-A9p packet is in today's mail. My original impression from the wording in previous ennai|(s)vvas that vvecould apply for Process III and pre-oppconcurrently. We are (I believe) ready to send the rest of the documents for the Process Ill. I'm hoping to avoid a delay of weeks and weeks while the Pre-App goes through, would going ahead with the actual meeting speed things up? | will follow upwith acall because |dohave some questions about Parking, Screening,'and Landscaping. From: Stacey Welsh Sent: Tuesday, December 1O,ZU1y9:23AM Tm:'kerrygarrett' Subject: RE: 3321 Pac Hwy So CARSTAR Hi Kerry, Have you had your Pre -Application meeting yet (see the attached emails)? Your questions below are items that should be discussed at that time. Staff will fill out a Process Ill submittal checklist customized to your proposal and provide that with the Pre -Application meeting summary so that you know which documents you need to pull together for the formal land use submittal. For example, if Lakehaven doesn't have many/any comments at the Pre -Application meeting, then Certificates may not be a necessary submittal item. Your photo sheet is fine as long as you provide dates for the images so that it is clear how recent the photos are; Google images can be a year or more older. Federal Way 333Z5omAvenue South Federal Way, VVA90O03'G3ZS Phone:253/835-2684 From: kenyga Sent: Monday, December9, 2019 9:46 AM To: Stacey Welsh Subject: 33Z1PacHwy SoC4RSTAR HiStacey, Acouple ofquestions onthis Process III app, * The current owner iskeeping the building and leasing tothe new tennant. Owner has occupied building for 40+ years, do they really need to run a title report? If so can this be a condition of permit issuance? I/e deferred while we're having it done. * Please respond onattached site photos sheet, isitacceptable? *Water and Sewer Availability, these are existing with no proposed work. Are copies of latest bills okay? From: Becky Chapin Sent: Thursday, May 3020192:34PM . Cc: Permit Center <Perm itCeiiter(ti),citvoffederilway.com> Subject: RE: Change of Use Request Update Im Glad I could help make your day a little better. I've attached the SEPA Checklist, Master Land Use Application, and submittal information, The City's SEPA review fee is $2856.00, 18Uggest you contact the Puget Sound Clean Air Agency to discuss thei[SEPA review process as wel[PSCAA may have 8 If you choose to go with the City for SEPA review, you will need to submit the SEPA checklist, Master Land Use Application, mailing envelopes, and fee to the Permit Center in person. It typically takes 3-4 months to process SEPA; there is a 14-day notice period followed by a 21-day appeal period. \the project in person or get hard copies of any of the attached handouts/applications. If you have any additional questions please feel free to contact me, Thanks, Becky Chapin Amf &ff.2Lmit Federal Way '""' 4" ' 33325 8'� Avenue South Federal Way, WA 98003-6325 Phone: 253-835-26411 Fax: 253-835-2609 -vvw.SiLtloffeder,,ilway.c,oni From: Bob Bjorneb_i wi i i] Sent: Thursday, May 30, 2019 144 PM To: Becky Chapin Subject: RE: Change of Use Request Update Well this is fantastic. . - .. I really get the fee back? so can you send me a application for the SEPA review with the refund or should I come in? at this point in time I can just say YOU MADE MY DAY! Thank you Bob Bjorneby Urorn: Becky Chapin Sent: Thursday, May 30, 2019 11:17 AM To: Bob Bjorneby Cc: Permit Center Subject: Change of Use Request Update The Planning Division received your application for a Zoning Compliance Review for Change of Use at 33210 Pacific •wy South. After review of the request, the City has determined that no Change of Use is required. The pervious use of the site was mechanical repair, machine shop, auto parts retail sales and office; with the mechanical repair/machine shop area having a larger footprint in the building. The proposed new use is Collison repair which is the same use chart and paragrap as the existing mechanical repair (FWRC 19,220,030, Vehicle and equipment sales, service, repair, rental.) As such, the Collision repair is not considered a change of use from the existing mechanical repair/machine shop. The City will refund you the fee for the Zoning Compliance Review, submitted May 24, 2019. As long as there are no site improvements, such as parking lot reconfiguration or addition of outdoor storage areas, and/or major fagade changes land use review is not required. Going forward you will need a building permit for the interior work and business registration with the City. Please note, the paint booth requires State Environmental Policy Act (SEPA) revie A permit from Puget Sound Clean Air Agency is also required. SEPA review can be done by Puget Sound Clean Air Agen -4 of a buildin ermit the SEPA reviewirocess must be completel If you have any questions regarding the building permit application process please contact the Permit Center at perrniLc�tyoffederal�gcom or 253-835-2607. Please let me know if you have any follow-up questions regarding this project. I M M � "IMINTAU Federal Way 33325 8 Avenue South Federal Way, WA 98003-6325 Phone: 253-835-26411 Fax: 253-835-2609 Leila Willoughby -Oakes From: Stacey Welsh Sent: Friday, December 20, 2019 9:18 AM To: Leila Willoughby -Oakes Subject: FW: Pre-App Meeting Waiver Request From: Brian Davis Sent: Monday, October 21, 2019 4:36 PM To: 'kerry garrett' <kerrygarrett@hotmail.com>; John Reichstein <john@econequip.com> Cc: Permit Center<PermitCenter@cityoffederalway.com>; Stacey Welsh <Stacey.Welsh@cityoffederalway.com> Subject: RE: Pre-App Meeting Waiver Request You do not need to attend a pre-app meeting, but your Use Process III still needs to go through a pre-app. We will forgo the meeting and generate a letter in response to the materials you submit for the pre-app. Please contact our Permit Center, copied on this message, to obtain the forms and fee information. Remind them no meeting needs to be scheduled. Brian Davis Director, Federal r r — From: kerry garrett [mailto.ker aarreti hotmail.com] Sent: Friday, October 18, 2019 5 17 PIA To: Brian Davis; John Reichstein Subject: Pre-App Meeting Waiver Request Hello Brian, I am a Bellingham architect working on the existing building at 33210 Pacific Hwy. So. (currently "Honest Performance" automotive). We are converting the existing to a "Carstar" automotive painting outfit. Though the demolition and interior TI are simple and straightforward, we are adding an automotive spray booth necessitating a 313 s.f. addition (triggering SEPA and Process III application). I have already spoken with Stacey Walsh and others about a successful Process III application. I was hoping to avoid scheduling and driving down for the Pre-App. Meeting. I can send you my permit drawing(s) if that would help you make up your mind, thanks, Kerry Garrett Architect, LLC Cell(360) 739-0480 Land (360) 671- 9432 Web bUp.flk iCI)C.C►Ti facebook htt s://www.facebook.com�karchitect 27 Leila Willoughby -Oakes From: Stacey Welsh Sent: Friday, Deoember2O, 20I9 9:I8AM To: Leila Willoughby -Oakes Subject: FVV Change nfUse Request Update From: Stacey Welsh Sent: Thursday, August 22,2Ol911:Z3AM To;'kerrygarrett@hotmai|.com'<kerr/8arnett@hotmaiicum> Co Ping |nquiry<P|ng|nquiry0Ddtyuffedera|vvay.com> Subject: FVV:Change ofUse Request Update I spoke with my colleague Becky Chapin as she assisted Bob on this matter. At that time, ebuilding addition was not proposed, so information provided to Bob about required applications reflects that. |fthe proposal includes abuilding addition for a paint spray booth, then what is required to be submitted is: Pre -Application Meeting Request (required for all projects that trigger SEPA). a. You can pursue a waiver by emailing the Community Development Director and addressing the criteria contained in Federal Way Revised Code (FWRC) Section 19.40.030.2(a). [Brian Davis, Community Development Director b. If you proceed with a Pre -Application Meeting, the UP III submittal requirements checklist is customized for you by a city planner as part of that process. If you receive a Pre -Application waiver then you may want to work with a city planner to determine what items on the checklist are required for submittal. Use Process III Application (required by FWRC 19.15.030.3—the project is an addition to an existing developed site that isnot exempt from SEPA) SEPAChackUst 4. Building Permit � ~Master Land U§gApgfication � � �Environmental '� EPA) Checklist (City Code) All submittals go through the Permit Center who can also provide fee information (253-835-2607 and (Puget Sound Clean Air Agency) 28 Senior Planner 333258 1h Avenue South Federal Way, WA 98003-6325 Phone: 253/835-2634 AAA.citKoffederalway-com From: Becky Chapin Sent: Thursday, May 30, 2019 2:34 PM To: 'Bob Bjorneby'<bobcats4j@htfwc.corr�> Cc: Permit Center <PermitCenter@citygffederalway.co_m> Subject: RE: Change of Use Request Update Glad I could help make your day a little better. I've attached the SEPA Checklist, Master Land Use Application, and submittal information. The City's SEPA review fee is $2,856.00. 1 suggest you contact the Puget Sound Clean Air Agency to discuss their SEPA review process as well, SCAA may have a more streamline SEPA process for paint booths included with their permit process. https: jwww. scleanainorgLioi Permits - Re Lstration ._ If you choose to go with the City for SEPA review, you will need to submit the SEPA checklist, Master Land Use Application, mailing envelopes, and fee to the Permit Center in person. It typically takes 3-4 months to process SEPA; there is a 14-day notice period followed by a 21 -day appeal period. In addition, a preapplication meeting is required prior to submitting a SEPA application. However, Per Federal Way Revised Code 19,40,030(2)(a), due to the simple nature of the proposal, a request for waiver of the required preapplication conference can be submitted. A written request to the director of Community Development for a waiver from the requirement to undergo a preapplication conference is required when submitting the SEPA checklist. The refund will come from the City's finance department and may take a week or so to process, so I can't send hard copies of the SEPA checklist/application with the refund. You can come in to the Permit Center counter if you would like to discuss the project in person or get hard copies of any of the attached handouts/applications. If you have any additional questions please feel free to contact me. Thanks, Becky Chapin Senior Planner vM Federal Way 33325 81h Avenue South Federal Way, WA 98003-6325 Phone: 253-835-26411 Fax: 253-835-2609 wM�.d �offede�ralwa �.com From: Bob Bjorneby [m JIto*bobcat5_48�ft_bbfWc-COn11 Sent: Thursday, May 30, 2019 1:44 PM To: Becky Chapin Subject: RE: Change of Use Request Update 29 Well this is fantastic..... I really get the fee back? so can you send me a application for the SEPA review with the refund or should I come in? at this point in time I can just say YOU MADE MY DAY! Thank you Bob Bjorneby From: Becky Chapin Sent: Thursday, May 30, 2019 11:17 AM To: Bob Bjorneby Cc: Permit Center Subject: Change of Use Request Update ENE= .... ........... the existing mechanical repair/machine shop, The City will refund you the fee for the Zoning Compliance Review, submitted May 24, 2019. As long as there are no site improvements, such as parking lot reconfiguration or addition of outdoor storage areas, and/or major fagade changes land use review is not required. Going forward you will need a building permit for the interior work and business registration with the City. Please note, the paint booth requires State Environmental Policy Act (SEPA) review. A permit from Puget Sound Clean Air Agency is also required. SEPA review can be done by Puget Sound Clean Air Agency or the City of Federal Way, Your choice. Prior to issuance of a building permit, the SEPA review process must be completed. If you have any questions regarding the building permit application process please contact the Permit Center at pe rm itcente r(a),cityoffed eral way.corn or 253-835-2607, Please let me know if you have any follow-up questions regarding this project. Thanks, Becky Chapin Senior Planner Al Fe­ffera[Way 33325 8th Avenue South Federal Way, WA 98003-6325 Phone: 253-835-26411 Fax: 253-835-2609 www.citVoffederalwaL.com 30 OF F cr 3 J 5 m O@ jjx. K o_ o x. 3 3 ®.� m o m = �A I� 90 T. n w v ' a 3 a _< F.3 N w 19 RA.: R,: n c n 41 o a w 7, E F. a 0 o c a � ®w ro c° � s � � n w m •`rt Q ® 7'Q n Fo O D n ro � 2T. 3 a o ® c m a o a CIA m � ro c m a a � o a _ `n n m c c a R ° o "gyw 3 - EL o c 0 70 w v. A4F 'o ^ — 4. m a n � ��ax RL ® rc � 1 N@ 'rt K C ss p a aD °' ut d O C (D C O a 0 rz .. mCC m a N ® W 'e. K �. r r m V. O_ U .J -°a. to '® O m ° G v. vhi S m C O N ,a F ae c y n £ ? < 3 o C9 a'o a c ae a 3 -• `.s .e = w +G 'O ,G a o TagD Vt A �.-=a o s a a ae as a A > cj o7. n. a®� r°°o a c °p ro 7. •• c 3 o'a w ro ® GF �• o 3 o m o a a n na33a� = ooBo a c m < a — o o A & B. m� 3 a DO mja 3 v s A ao p1 7 :E o 0 I 1. CD > Z CD > Q' > @ 0 5D 0 0 Fi, 3 'a ck ro R 9 0 m zo m p 3 0 OM 0 C" m 0 M C=) M�zO 0 q ro 0 s m 0 tD a. a U m EE 0� Q 1p & o ma FCA N L o on 3 > n 0 Lq vl rpD '-3 A 2 0 3 . 0 '4 T c" 02 e CL T.J,r'CL LLJ (D 7, .— Q t 0 0 0 ® X_ c� ,e t� e00 i s C5 Q3 asw .� Q) ID —1 y� C.�1 CC < C W f3 sllrr gsrin A O FJuMi'ng tfee'3 7.4th Avp S H y F- 23rdAJenUe3 ntt r ca O z M i az ra �q MC_ E sr') 02$ 2"1st Ave S 01 a-� N i.r � � 3 1e r ... '— va fVZ. '" ALL, c� M�"., 0 20th Aver; `�. 0 � 4� .:s v f In a`�® 0- €iJ N — ch eri U) crs I.m 4 ) c+a tf ., Pacific Hwy o c� — 0 < 0 _ — �,0 U) 0 0 o a s M v J U) 0 13th R=1 S O Q e E U as (� 4c9 s a o c arCo 'E y Q (UM 0 UJ 05 7 — a�y�� sWrL > �a a EM m y ` Mca � z > M n o0 Uj co W en CL 11101 I— ce CcIre Co J , cea 9tFu AvE �. Co cry coU W - - CARSTAR FEDERAL WAY COLLISION T. 33210 PACIFIC SOUTH, IFEDERAa L WAY, WA 1. & AL"Ir E RAT 10 N S 6KA 1/ /1 % - Pre-App. Submittal CITY OF FEDERAL WAX COMN[UNITY DEVELOPMENT DEPARTMENT J!2aval !Jj121 FROM-. Leila Willoughby -Oakes, Planning No External Meeting/Email Comments by Jan 20 ."XL E NUMBER(s): 19-105839-00-PC PROJECT NAME: CARSTAR FEDERAL WAY COLLISION & SPRAY BOOTH PROJECT ADDRESS: 33210 PACIFIC HWY S ZONING DISTRICT: BC (Community Business) PROJECT DESCRIPTION: Proposed remodel to convert auto parts store to automotive collision repair center, including 313 square foot addition and automotive spray booth. Proposal subject to Process III application on account of SEPA review pursuant to FWRC 19.15.030(3). Site improvements as a result of the proposal TBD. Clean Air Agency lead agency on Environmental Review Checklsit. LAND USE PERMITS: SEPA (License}/ Process III Project Approval PROJECT CONTACTKERRY GARRETT ARCHITECT LLC 3831 Silver Beach Ave., Bellingham, WA 98226 kerrygarrett@hotmail.com MATERIA-LS SUBMITTED: Narrative MLU Application Site Plan 22, 46 (of RECEIVED 87 F F RAWAY e Date APPLICATION (S) 1 - LEASE PRINT Typeof Permitsquired Annexation Binding Site Plan Boundary Line Adjustment Comp Platt/Rezone Land Surface Modification _ Lot Line Elimination Preapplication Conference Process I (Director's Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Co ercial/Residential �nihk Designation Plan Designation ,►i Value of gImprovements 4_12�value of Proposed Improvements International Building ode ocqupanq p. Rai !e l 12-1 MASTER iv USE APPLICATION DEPARTMENT OF COMMUNITY DEvEt OP ENT 33325 8°h Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.citvoffiederal ay.901!1 Phone: Email: j34" r .r v r •r i Agent (if dif erent'tl3w� Applicant) Name: t <�7pwyd( Address: r° ri City/Stator elf e Zip: Phone., Fax: Email: e tAl Signature: �AAA. i Name: okwi-45 Address: 33210 City/State: rede4191 Zip: Phone: 3 " 707 Fax: r_ { of ✓1C. Email: C r ►-` ®� Signature: ------------- Bulletin #003 - January 1, 2011 k:\Handouts\Master Land Use Application