Loading...
23-102773City of Federal Way Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MATISSE FILE Electrical Permit #:23-102773-00-EL Inspection Request Line: (253) 835-3050 Project Address: 31541 39TH AVE SW Parcel Number: 873198 2030 Project Description: Add power for landscape lights , Add gfi outlet out back of panel. Owner Applicant Contractor MIA MATISSE TAYLOR HEATING TAYLOR HEATING COOLING 31541 39TH AVE SW 5518 163RD ST E SUITE A PLUMBING LLC (ELECTRICAL) FEDERAL WAY WA 98023 PUYALLUP WA 98375 TAYLOHC787N3(6/8/24) USA 5518 163RD ST E SUITE A PUYALLUP WA 98375 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Circuits - Residential Electrical Fixtures PERMIT EXPIRES Wednesday, 22 November, 2023 Permit Issued on Friday, May 26, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONI INIF Date: 6t'141 '7-1 c ITY or Federal Way THIS CARD IS TO RE-L-IN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections may- be failed if this card is not on -site. DO NOT LOSE THMS CARD. Inspections are listed as close to sequential order as possible (read Ieft to right. top to bottom). Please schedule inspections as appropriate. Rork must not be co,;ered until it is approved. Check with your inspector if you are unsure about am, of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL 0 IIFER Ground (4295) ❑ Ditch corer (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete Br Date By Date Bi- Date Pool Bonding (4195) ❑ Temporary Power (42?5) ❑ Sen-ice (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved Bti Date By Date By Date ❑ Final - Electrical (4055) By proved Date I MECHANICAL ❑ -Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) Q Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date