Loading...
23-102890City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Electrical FILEPermit #:23-102890-00-EL Inspection Request Line: (253) 835-3050 Project Name: THE PARK AT DASH POINT - OFFICE BUILDING Project Address: 31736 50TH LN SW Project Description: telecommunications wireless security system install Parcel Number: 112103 9129 Owner Applicant Contractor K N L VISION WA LLC JENNIFER COVELLOA D T LLC A D T LLC (ELECTRICAL 06) 3709 CONVOY ST SUITE 300 11824 NORTH CREEK PKWY SUITE 105 ADTLLL*881DO (3/20/24) SAN DIEGO, CA 92111 BOTHELL WA 98011 11824 NORTH CREEK PKWY SUITE 105 BOTHELL WA 98011 Is this an Online or O.T.C. application? Low Voltage - Burglar Alarm i Additional Permit Information Yes Electrical Fixtures 1 PERMIT EXPIRES Saturday, 2 December, 2023 Permit Issued on Monday, June 5, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of s-n UN �ederaf Way. Owner or agent: Date: CITY Of Federal Way THIS CARD IS TO REAIAI\ ON -SITE Construction Inspection Record INSPECTION REQL-ESTS: (253) 3355-30-50 Scheduled inspections nix be failed if this card is not on -site. DO NOT LOSE THIS C AD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. R'ork nurst not be co%eyed until it is approved. Check with your inspector if you are urrsure about and- of the inspections or the inspection sequence. On -going inspections are longed on the back of this card. ELECTRICAL ❑ L-FER Ground (429-5) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (42-55) Approved Approved Approved to place concrete B} Date By Date By Date ❑ Pool Bonding (4193) ❑ Temporary Power (4275) ❑ Service (4235) Apprmed Approved Approved By Date By Date By Date Feeders/Sub-panels (404) ❑ Rough Electrical (422a) ❑ Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) By 4vrd MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release tat Approved By Date By Date By Date PLUMBING ❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date BY Date