23-102890City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Electrical
FILEPermit #:23-102890-00-EL
Inspection Request Line: (253) 835-3050
Project Name: THE PARK AT DASH POINT - OFFICE BUILDING
Project Address: 31736 50TH LN SW
Project Description: telecommunications wireless security system install
Parcel Number: 112103 9129
Owner
Applicant
Contractor
K N L VISION WA LLC
JENNIFER COVELLOA D T LLC
A D T LLC (ELECTRICAL 06)
3709 CONVOY ST SUITE 300
11824 NORTH CREEK PKWY SUITE 105
ADTLLL*881DO (3/20/24)
SAN DIEGO, CA 92111
BOTHELL WA 98011
11824 NORTH CREEK PKWY SUITE 105
BOTHELL WA 98011
Is this an Online or O.T.C. application?
Low Voltage - Burglar Alarm i
Additional Permit Information
Yes
Electrical Fixtures
1
PERMIT EXPIRES Saturday, 2 December, 2023
Permit Issued on Monday, June 5, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
s-n UN
�ederaf Way.
Owner or agent: Date:
CITY Of
Federal Way
THIS CARD IS TO REAIAI\ ON -SITE
Construction Inspection Record
INSPECTION REQL-ESTS: (253) 3355-30-50
Scheduled inspections nix be failed if this card is not on -site. DO NOT LOSE THIS C AD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. R'ork nurst not be co%eyed until it is approved. Check with your inspector if
you are urrsure about and- of the inspections or the inspection sequence. On -going inspections are longed on the back of this card.
ELECTRICAL
❑
L-FER Ground (429-5)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (42-55)
Approved
Approved
Approved to place concrete
B}
Date
By
Date
By
Date
❑
Pool Bonding (4193)
❑
Temporary Power (4275)
❑
Service (4235)
Apprmed
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (404)
❑
Rough Electrical (422a)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
By
4vrd
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release tat
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
BY
Date