23-102944City of Federal Way
FILE
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: OLYMPIC VIEW ELEM SCHOOL
Project Address: 2626 SW 327TH ST
Electrical
Permit #:23-102944-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 132103 9008
Project Description: Perform a 1, 2 or 4 hour load bank test on stand by Generator, disconnect building conductors,
connect load bank, perform load bank test, land and torque building conductors
Owner
Applicant
Contractor
FEDERAL WAY PUBLIC SCHOOLS
DOUG GRENFELLCummins Inc.
CUMMINS INC
33330 8TH AVE S
1800 N FRYAR AVE
CUMMII*853C4 (2/24/25)
FEDERAL WAY WA 98003
SUMNER WA 98390
500 JACKSON ST
COLUMBUS IN 47201
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Low Voltage - Other (Commel 1
PERMIT EXPIRES Sunday, 3 December, 2023
Permit Issued on Tuesday, June 6, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
/—% 1\1 J
,c
Owner or agent: I I N
PDatei
rl� n r, o)
_N'
cilr or
Federal Way
THIS CARD IS TO RE'I_'I\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2_53) 335-30-50
Scheduled inspections nt<xr. be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottour). Please schedule inspections as appropriate. 'Work must not be coffered until it is approved. C$eck with your inspector if
you are unsure about any of the uispections or the inspection sequence_ On -going inspections are logged on the back of this card.
ELECTRICAL
❑
LTFER Ground (4295)
Ditch cover (4030)
❑'
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Q
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
B-,-
Date
B`-
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
B}-
Date
By
Date
Final - Electrical (4055)
Approved
By
lute
MECHANICAL
❑
'Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final -'Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date