Loading...
23-102750Electrical City y Federal Development Community Development Dept FILE Permit #:23-102750-00-EL 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: IOSEFA Project Address: 321 S 314TH PL Parcel Number: 794300 0320 Project Description: Disconnecting & Connecting new equipment Owner Applicant Contractor FLORENCE IOSEFA JASON HUNTHUNTS SERVICES HUNTS SERVICES (ELECTRICAL) 321 S 314TH PL 8111 E PACIFIC HWY HUNTSS*7990G (8/30/23) FEDERAL WAY WA 98003 TACOMA WA 98422 8111 PACIFIC HWY E TACOMA WA 98422 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Low Voltage - Other (Resident Electrical Fixtures PERMIT EXPIRES Tuesday, 21 November, 2023 Permit Issued on Thursday, May 25, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: _� CITY or k Federal Way THIS CARD IS TO REALM\ O\-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-30-50 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE IBIS CARD. Inspections are listed as close to sequential order as possible (read Ieft to right. top to bottom). Please schedule inspections as appropriate. Work nnrst not be corered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this card - ELECTRICAL ❑ LTFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (423 ) Approved Approved Approved By Date By Date By Date FeederslSub-panels (4045) 0 Rough Electrical (4225) Q Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By Dat MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date B}- Date