Loading...
23-100886Building - Commercial City of Federal Way Permit •#:23-100886-00-CO Community Development Dept. 33325 8th Ave S e: (253) 835-3050 Federal Way, WA 98003 Inspection Request Lin Ph: (253) B35-2607 Fax: (253) 835-2609 Project Name: ST FRANCIS HOSPITAL - MRI REPLACEMENT Project Address: 34515 9TH AVE S Parcel Number: 750451 0020 Project Description: BLUEBEAM - Renovation of existing operating rooms and core to accommodate new equipment, electrical systems and finishes. Work includes selective demolition and new construction; replacement of gypsum wall board, wall and ceiling finishes, casework. No plumbing or mechanical. Owner Applicant Contractor COMMON SPIRIT HEALTH DANIEL FORANBUFFALO SELLEN CONSTRUCTION 34515 9TH AVE S DESIGN 227 WESTLAKE AVE N FEDERAL WAY WA 98003 1520 4TH AVE S SUITE 400 SEATTLE WA 98109 SEATTLE WA 98 101 Census Category: 437 - Commercial alt add / conversion Includes: # 1 #2 0 Occupancy Class: C.nn.-triir.finn Tvne #4 . a 4 - 114 No "00 111 Fire conditions: A separate permit is required for the modification to the fire sprinkler and fire alarm system. PERMIT EXPIRES Tuesday, 26 September, 2023 Permit Issued on Thursday, March 30, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in -accordance with the laws, rules and regulations of the State of VV ,RAW t and Y e,City of Federal Way. Owner or agent: Lznq L Date: THIS CARD IS TO REMAIN ON -SITE CITYOF 'o Way Construction Ins ection Record Federal INSPECTION REQUEeTS: (253) 835-3050 PERMIT #: 2310088600 Address: 34515 9TH AVE S Project: COMMON SPIRIT HEALTH FEDERAL WAY WA 98003-6761 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE'rins CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. on -going inspections are logged on the back or this card, Site Assessment (Erosion) (4365) Footings/Setback (4110) Re -steel (4215) To be done PRIOR to breaking ground Approved to place concrete Approved to place concrete or grout By Date By Date By Date 'El Slab/Concrete Floor (4255) El Underfloor Framing (4285) Fj] Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date FI] Fi,,/Draft Stops (4095) scheduling Interim Erosion Control (4370) Prior to scheduling a Framing inspectiom Approved Plumbing & Mechanical Rough -in Approved Fire/Draft and Fire/Draft Stop inspections must be signed - :and ] By Date By off approved. IBC 109.3.4 Date 0 Framing (4120) Insulation (4150) ED Gypsum Wallboard Nailing (4130) Approved to insulate Approved to install wallboard Approved to install mud & tape By Date By Date By Date EO Suspended Ceiling Grid (4265) El Final - S K F & R (4060) El Final - Planning Approved to drop tile Approved Approved By Date By Date By Date 16 Final Erosion Control (4375) 16 Final - Building (4050) Approved Approv e I �By Date By Date Rough Electrical El Final Electrical 1:1 Right of Way Approved Approved I Approved 4'By Date 13Y Date By Date