Project Name: ST FRANCIS HOSPITAL - MRI REPLACEMENT
Project Address: 34515 9TH AVE S Parcel Number: 750451 0020
Project Description: BLUEBEAM - Renovation of existing operating rooms and core to accommodate new
equipment, electrical systems and finishes. Work includes selective demolition and new
construction; replacement of gypsum wall board, wall and ceiling finishes, casework. No
plumbing or mechanical.
Owner
Applicant
Contractor
COMMON SPIRIT HEALTH
DANIEL FORANBUFFALO
SELLEN CONSTRUCTION
34515 9TH AVE S
DESIGN
227 WESTLAKE AVE N
FEDERAL WAY WA 98003
1520 4TH AVE S SUITE 400
SEATTLE WA 98109
SEATTLE WA 98 101
Census Category: 437 - Commercial alt add / conversion
Includes: # 1 #2 0
Occupancy Class:
C.nn.-triir.finn Tvne
#4
. a 4 -
114 No "00 111
Fire conditions:
A separate permit is required for the modification to the fire sprinkler and fire alarm system.
PERMIT EXPIRES Tuesday, 26 September, 2023
Permit Issued on Thursday, March 30, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in -accordance with the laws, rules and regulations of the State of
VV ,RAW t and Y e,City of Federal Way.
Owner or agent: Lznq L Date:
THIS CARD IS TO REMAIN ON -SITE
CITYOF 'o
Way
Construction Ins ection Record
Federal
INSPECTION REQUEeTS: (253) 835-3050
PERMIT #: 2310088600
Address: 34515 9TH AVE S
Project: COMMON SPIRIT HEALTH FEDERAL WAY WA 98003-6761
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE'rins CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule
inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you
are unsure about any of the inspections or the
inspection sequence. on -going inspections are logged on the back or this card,
Site Assessment (Erosion) (4365)
Footings/Setback (4110)
Re -steel (4215)
To be done PRIOR to breaking ground
Approved to place concrete
Approved to place concrete or grout
By
Date
By
Date
By Date
'El
Slab/Concrete Floor (4255)
El
Underfloor Framing (4285) Fj] Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor Approved to install flooring
By
Date
By
Date By Date
FI]
Fi,,/Draft Stops (4095)
scheduling
Interim Erosion Control (4370) Prior to scheduling a Framing inspectiom
Approved
Plumbing & Mechanical Rough -in
Approved Fire/Draft
and Fire/Draft Stop inspections must be signed -
:and
]
By
Date
By
off approved. IBC 109.3.4
Date
0
Framing (4120)
Insulation (4150)
ED Gypsum Wallboard Nailing (4130)
Approved to insulate
Approved to install wallboard
Approved to install mud & tape
By
Date
By
Date
By Date
EO
Suspended Ceiling Grid (4265)
El
Final - S K F & R (4060) El Final - Planning
Approved to drop tile
Approved Approved
By
Date
By
Date By Date
16
Final Erosion Control (4375)
16
Final - Building (4050)
Approved
Approv e
I �By
Date
By
Date
Rough Electrical
El
Final Electrical
1:1
Right of Way
Approved
Approved
I
Approved
4'By
Date
13Y
Date
By
Date