23-103076Electrical
City of Federal way FILE
Permit - —1 "'�i' —
Community Development Dept,
33325 8th Ave S
Federal Way, WA 98003 Inspection bequest Line:(263) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: PANTHER LAKE -LE - Bldg 1
Project Address: 15 S 338TH PL Parcel Number: 132202 0250
Project Description: O Panel Replacement
Owner
llcnt
Contractor
HENRY WASHBURN
TABITHA HESS
SULLIVAN ELECTRIC LLC
28037 SE 231ST ST
10012 SW 14TH AVE
SULLIEL845JN (4/20/24
MAPLE VALLEY WA
SEATTLE WA 98146
PO BOX 538
98038-6914
KENT WA 48035
Additional Permit Information
Is this an Online or O.T.C. applications .................
Yes
Alt. Srvc / Feeder 201- 600 am 4
PERMIT EXPIRES Saturday, 9 December, 2023
Permit Issued on Monday, June 1, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: QN1 11\1 Date:
ti
THIS C_A_RD IS TO REILUN ON- -SITE
CRY or
Construction Inspection Record
Federal Way
INSPECTIO-N REQUESTS: (2-53) 835-30-50
Scheduled inspections nixv be failed if this card is not on -site- DO -NOT LOSE THIS CARD. Inspectionsare listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate, 'Work rust not be covered until it is approved, Check -Nith your inspector if
you,ue unsure about any. of the inspections or the
inspection sequence. On -going inspections are logged on the back of t1us card.
ELECTRICAL
El LTFER Ground (4295)
Ditch cover (4030) Slab/Concrete Floor (42-55)
Approved
Approved Approved to place concrete
By Date
By Date Bv Date
Pool Bonding (4195)
El Temporary Power (4275) Service (4235)
ED
Approved
Approved Approved
By Date
Bs Date By Date
E] Feeders/Sub-panels (4045)
Rough Electrical (4225) Ceiling Cover (4020)
El
Approved
Approved Approved
By Date
By Date By Date
El ]Final - Electrical (4055)
pproved
By Dat1�X
MECHANICAL
El Mechanical Rough -in (4165)
El Gas Piping (4125) El Final - -Mechanical (4065)
Approved
Approved to release test Approved
Bv Date
By Date By Date
Plumbing Groundwork (4190)
Approved to cover
Date
----- ----- - .......
It
Us 11116W
Rough Plumbing (4230)
Approved
Date
— ------- - -----
Final - Plumbing (4075)
Approved
Date