Loading...
23-102706Ele'drical City of Federal way Permit• Community Development Dept FILE - 33325 8th Ave S Federal way, WA 98003 Inspection Request Line: O -3 050 Ph: (253) B35-2607 Fax: (253) 635-2609 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 21 Project Address: 1952 S 31ST CT Parcel Number: 952651 0210 Project Description: NEW 100 AMP TEMP POLE Owner App liicant Contractor SSHI LLC DBA D R HORTON SHANNON CHELETTEPROVI DENT PROVIDENT ELECTRIC INC (01) 11241 SLATER AVE NE SUITE 120 ELECTRIC INC PROVIEI103C2 (2/22/24) KIRKLAND WA 98033 17615 SE 252ND ST PO BOX 7087 COVINGTON WA 98042 COVINGTON WA 98042 Additional Permit Information Is this an Online or O.T.C. application? ................. Yes Temp.• 100 amps Sunday,PERMIT EXPIRES ' November,1 IssuedPermit on r ,2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of shngton and the it of Federal Way. ate: Owner or agent. D cily Federal Way THIS C-A-RD IS TO REALAIN ON -SITE Construction Inspection Record EN SPECTION REQtk�T$,' (253) 835-3050 Scheduled inspections amy be failed if this card is not on -site- DO NOT LOSE THIS C'_ARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottditi), Please schedule inspections as appropriate, TWork must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going m-spections are logged on the back of this card. El LTIR Ground (4295) Ditch cover (4030) El Slab/Concrete Floor (4255) Approved Approved Approved to place concrete B I Date By Date �By Date Pool Bonding (4195) Temporary over (4275) El Service (4235) Approved Approved Approved By Date B-,- X<'o Eate,(,-, If Z Bv Date El Feeder,/.Sub-panels (4045) El Rough Electrical (4225) --------------- Ceiling Cover (4020) Approved Approved Approved Date B-, Date Bv Date Final - Electrical (40555) Approved By r Datezle7 MECMANIL'" A L Mechanical Rough -in (4165) Gas Piping (4125) El Final - Mechanical (4065) Approved Approved to release test Approved Bv Date BV Date By Date PLUMBING" El Plumbing Groundwork (4190) Rough Plumbing (4230) Final - Plumbing (4075) Appro,.ed to cover Approved Approved By Date By Date By Date