Loading...
23-102830Mechanical FILE City of Federal WayPermit • Community Development Dept.: 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-350 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MCILNAY Project Address: 30814 11THAVESW Parcel Number: 525980 0240 Project Description: ADD AC TO SYSTEM Owner Applicant Contractor ROBERT MCILNAY ASHLEY KARCHSOUND HEATING & A/C SOUND HEATING & A/C (GENERAL) 30814 11TH AVE SW 5526 184TH ST E SOUNDHAO66BM (8/17/23) FEDERAL WAY WA PUYALLUP WA 98375 5526 184TH ST E SUITE A 98023-4545 PUYALLUP WA 48375 Additional Permit Information Mechanical Work Valuation? .................................. 5400 Is this an Online or "O.T.C. application?...... ...... Yes I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent; t& Date: THIS C-A-RD IS TO RE-%I--kn- ON -SITE CITY OF Constrcor uction Inspection Red Federal Way INSPECTION REQUESTS: S35-30-50 (2-53) Scheduled inspections nlay be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspectionsare listed as close to sequential or as possible (read left to rigglir. top to bottom)_ Please schedule inspections asappropriate, Work- niust not be covered until it is approved, Check with your u1spector if ou are unsure about am, of the iaspections or the inspection sequence- going inspections at e lo--as!ed on the back- of this card, ELECTRICAL LTFER Ground (4295) Ditch cover (4030) s Slab/Concrete Floor (4255) Approved Approved Approved to place concrete Bs- Date Bi- Date By Date Pool Bonding (4195) Temporary Power (4275) Service (4235) Approved Approved Approt-ed By Date Bi- Date By Date Feedersf-Sub-panels (4045) El Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date Bi- Date By Date E3 Final - Electrical (4055) Approved By Date 0 16 :El Mechy ) anical Rough -in (4 -5) Gas Piping (4125) i Final - Nlechanica7l(4065) I Approved Approved to release test Approved �77 Bv Date L By DaBi- 40� Datt(.e te . . ....... .. LM Plumbing Groundwork (4190) Approved to cover By Date Rough Plumbin (4 9 Approved 1ate Li Final - Plumbing (4075) Approved BY Date