Loading...
22-1050874 r Electrical City of Federal Way Permit' Community Development Dept, 33325 8th Ave S FILE Federal Way, WA 98003 Inspection Request Line: (2) 835-0 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: US POST OFFICE Project Address: 34301 9TH AVES Parcel Number: 202104 9050 Project Description: New 200A Feeder for New Generator Owner Applicant Contractor USPS SEATTLE NDC 260688 DOM ECKLUNDCAPSTONE SOLUTIONS, CAPSTONE SOLUTIONS INC 34301 9TH AVE S INC CAPSTS1868JD (4/11/24) FEDERAL WAY WA 98003 8195 166TH AVE NE SUITE 100 PO BOX 715 REDMOND WA 98073 REDMOND WA 98073-0715 Additional Permit Information Is this an Online or O.T.C. application? ................. Yes r. UPAJ Permit Issued on r i. November I I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date. .1 THIS IS TO CITY0, »y:.,x„.�.,.<,,�•' Way CARD ��AIy�yy-SIT�EYw Construction ` s, 4tio Record Federal INSPECTION RE UE TSs (253) 835-3050 PERMIT : 22 10587 Address: 331 9TH AVES Project: USPS SEATTLE NDC 260688 FEDERAL WAY WA 93-6721 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 255) UFER Ground (4295) El Ditch cover (4030) Slab/Concrete Floor ( Approved Approved Approved to place concrete By Date By _ Date ` f By Date El Pool Bonding (195) El Temporary Power (4275) El Service (235) Approved Approved Approved By ate By ' ate y Date E Feeders/Sub-panels (5) o Electrical (225) Ceiling Cover (020) Approved Approved Approved By Date By Date By Date El Final - Electrical (4055) Approved By jell Date — RoughElectrical Final Electrical El Right of Way Approved Approved Approved y Date By Date By Date