Loading...
23-101246City ofFederal Way :h Permit #:23-101246-00-EL Community Development Dept: 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: THE WOODLANDS AT REDONDO CREEKLOT 67 Project Address: 121 S 302ND ST Parcel Number: 952651 0670 New Service: Residential I PERMIT EXPIRES Monday, t t Permiton t.2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use ill be in accordance with the laws, rules and regulationsofthe State of ;end E deral Way.. Owner or agent: Date:: TMS C_XRD IS TO REAWs ON -SITE CITY Of Construction Inspection Record Fbderal V%My INSPECTION REQUESTS: (253) 83-5-30-50 Scheduled inspections nmv be failed if this card is not on -site. DO NOT LOSE TMI�, CARD, Inspections are listed as close to sequential or as possible (read left to right, top to ttorn). Please schedule inspections as appropriate- Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -go in _g inspections are logged on the back of this card- ELVEN,711"IFUCAL UFER Ground (4295) Ditch cover (4030) E] Slab/Concrete Floor (4255) Approved Approved Approved to place concrete BI, Date By V Date By Date EJ Pool Bonding (4195) Temporary Power (4275) El Service (4235) Approved Approved Approved ,By Date By Date By Date El Feeders/Sub-panels (4045) El Rough Electrical (4225) 9 Ceiling Cover (4020) Approved Approwd Approved By Date B Date '�4/L�L By Date F Final - Electrical (4055) Approved By Z111-e Date"A'�' rpi III'' I I L I ICI 11" MIL Mechanical Rough -in (4165) Gas Piping (4125) Approved Approved to release test Bv Date Bv Date I i I P L U M B I Nk`ff Plumbing Groundwork (4190) Rough Plumbing (4230) Final - Plumbing (4075) Approved to cover Approved Approved By Date Bi- Date By Date